Sterling Ranch Minor Sketch Plan -Second Amendment
Description
Request to amend a portion of the Sterling Ranch Sketch Plan SKP183/SKP07-001 located east of Sand Creek Channel. Removes school site from Branding Iron Fil 2 and moves it east of channel, swaps parkland & density but does not exceed density as approved. May also downgrade ROW.
Location
Parcels
5200000547 5200000547 5200000552 5200000552 5200000554 5200000554 5228000030 5228000030 5228000038 5228000038 5233000015 5233000015 5233000016 5233000016 5233000017 5233000017 5233000018 5233000018 5233302049 5233302049 5300000173 5300000173 5300000222 5300000222
Applicant
N.E.S.
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
File Number
SKP224
Project Manager
Kari Parsons
Status
Closed
Created
1/24/2022 9:12:38 AM

View: Project Documents



Review Comments (41)

Link Agency Comment
PCD Engineering Division
4/4/2023 12:09:06 PM
Engineering has no further comments.

Charlene Durham
charlenedurham@elpasoco.com
4/4/2023 12:09:06 PM
View PCD Engineering Division
2/24/2023 12:03:30 PM
PCD-Engineering has the following comments:

The following item needs to be revised and resubmitted:
- TIS (see redlines on a few revised pages)

The - MDDP Amendment has been approved


-- Jeff Rice - 719-520-7877
2/24/2023 12:03:30 PM
PCD Project Manager
1/19/2023 10:15:18 AM
Please revise WQ in MDDP per Jeff's comment and sign stamp for approval.
See TIS comments; please contact Kari Parsons 520-6306 if comment meeting is needed.
1/19/2023 10:15:18 AM
View PCD Engineering Division
1/19/2023 10:13:01 AM
(TIS redlines summary) 1/19/2023 10:13:01 AM
View PCD Engineering Division
1/19/2023 10:12:25 AM
(TIS redlines) 1/19/2023 10:12:25 AM
View PCD Engineering Division
1/19/2023 10:11:32 AM
(MDDP redlines summary) 1/19/2023 10:11:32 AM
PCD Engineering Division
1/19/2023 10:10:31 AM
PCD-Engineering has the following comments:

The following items need to be revised and resubmitted:
- MDDP Amendment (WQ plan sheet)
- TIS, with developer's signature (see redlines)


-- Jeff Rice - 719-520-7877
1/19/2023 10:10:31 AM
View PCD Engineering Division
12/15/2022 9:32:56 AM
(TIS redlines summary) 12/15/2022 9:32:56 AM
View PCD Engineering Division
12/15/2022 9:32:03 AM
(TIS redlines) 12/15/2022 9:32:03 AM
View PCD Engineering Division
12/15/2022 8:53:39 AM
(MDDP/PDR redlined pages) 12/15/2022 8:53:39 AM
View PCD Engineering Division
12/15/2022 8:53:15 AM
See comment memo (link at left) and redlines.

The following items need to be revised and resubmitted:
- MDDP Amendment
- Master TIS

-- Jeff Rice - 719-520-7877
12/15/2022 8:53:15 AM
View Traffic Review Consultant
12/14/2022 6:20:44 PM
FHU has completed a traffic review and recommends that the TIS be updated and resubmitted. Our comment memo is attached, and detailed technical comments are included in the Bluebeam session. 12/14/2022 6:20:44 PM
PCD Project Manager
12/14/2022 10:19:06 AM
Added 2 conditions and discussed with Loren and Andrea on 12/13/2022. No comments remain. Plan is out for approval 12/14/2022 10:19:06 AM
View PCD Project Manager
10/31/2022 5:01:53 PM
Letter of intent:
Please add the analysis that this will still qualify as admin SKP in the request.
10/31/2022 5:01:53 PM
View PCD Engineering Division
10/31/2022 1:58:27 PM
(MDDP redlines) 10/31/2022 1:58:27 PM
View PCD Engineering Division
10/31/2022 1:56:22 PM
(TIS redlines) 10/31/2022 1:56:22 PM
View PCD Engineering Division
10/31/2022 1:54:38 PM
See comment memo (link at left) and redlines.

The following items need to be revised and resubmitted:
- MDDP Amendment
- Master TIS

-- Jeff Rice - 719-520-7877
10/31/2022 1:54:38 PM
Falcon Fire Protection District
8/19/2022 9:54:36 AM
not in the boundaries of the Falcon Fire District. 8/19/2022 9:54:36 AM
View PCD Project Manager
8/15/2022 3:45:05 PM
Letter of Intent comments; Applicant should acknowledge agreed timing of Master TIS meeting the ECM with the next prelim plan submittal within the amended SKP area. 8/15/2022 3:45:05 PM
View PCD Project Manager
8/15/2022 3:43:15 PM
Sketch Plan comments 8/15/2022 3:43:15 PM
View PCD Engineering Division
8/15/2022 3:25:29 PM
(MDDP/PDR redlines summary) 8/15/2022 3:25:29 PM
View PCD Engineering Division
8/15/2022 3:27:41 PM
(MDDP/PDR redlines) 8/15/2022 3:27:41 PM
View PCD Engineering Division
8/15/2022 2:51:50 PM
See comment memo (link at left) and redlines.


-- Jeff Rice - 719-520-7877
8/15/2022 2:51:50 PM
View Parks Advisory Board
8/11/2022 2:24:30 PM
El Paso County Community Services / Parks Final Comments - Please See Attached Documents (PAB Endorsed 08/10/2022) 8/11/2022 2:24:30 PM
Woodmen Hills Metro
8/11/2022 10:45:07 AM
The Woodmen Hills Metropolitan District WHMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. 8/11/2022 10:45:07 AM
Colorado Geological Survey
8/10/2022 8:55:47 AM
The Colorado Geological Survey (CGS) understands that the applicant seeks to amend a portion of the Sterling Ranch Sketch Plan SKP183/SKP07-001 located (38.9621°, -104.6683°) east of Sand Creek Channel. CGS has no objection to the planned amendment. We reviewed this project on December 19, 2007, and September 5, 2018. Referral documents include a Geologic Hazard/Land Use Study, and PSSI – Addendum by Entech Engineering, Inc., April 5, 2022. Our previous comments remain relevant and are repeated here:

“The identified geologic hazards within the site include at least: expansive soils, potentially unstable and unstable slopes, seasonal shallow groundwater, artificial fill, hydrocompaction, and loose soils. Prior to approval of a preliminary or final plat the geotechnical engineer should evaluate and comment on preliminary site grading and development plans. Entech indicates that site grading can mitigate some of the geologic hazards. Evaluation of the grading plan, after it is developed, should discuss if it mitigates unstable slopes, shallow groundwater or any other identified geologic hazard. The geotechnical engineer should also indicate where basement construction is not feasible due to shallow groundwater, where no-build lines will need to be drawn due to unstable slopes and discuss implementation of any other mitigation measures required for the geologic hazards and constraints identified at the site.”

Submitted 8/10/2022 by Jonathan R. Lovekin, P.G. Senior Engineering Geologist, Colorado Geological Survey: jlovekin@mines.edu
8/10/2022 8:55:47 AM
Pikes Peak Regional Building Department
8/8/2022 3:22:44 PM
Once the development plans start coming in, Enumerations will have comments. No comments at this time.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
8/8/2022 3:22:44 PM
View Mountain View Electric Association, Inc.
8/8/2022 2:16:15 PM
See attached comments 8/8/2022 2:16:15 PM
PCD Project Manager
8/15/2022 3:35:43 PM
Conditions of approval will address Master Traffic study per meeting. 8/15/2022 3:35:43 PM
Black Forest Land Use Committee
8/3/2022 9:06:05 AM
The Black Forest Land Use Committee has no objections to this proposal and from what the Letter of Intent states, the proposal will reduce the density in several areas which is a good thing. 8/3/2022 9:06:05 AM
Black Forest Fire Protection District
8/2/2022 2:19:25 PM
Black Forest Fire Rescue/JMR
No comments regarding the amendment.
8/2/2022 2:19:25 PM
View EPC Parks Department
7/29/2022 12:17:26 PM
El Paso County Community Services / Parks Preliminary Comments - Please See Attached Documents (To be presented to PAB for endorsement on 08/10/2022) 7/29/2022 12:17:26 PM
Colorado Springs Public Works
7/28/2022 2:50:32 PM
Engineering Development Review has no comments on this item.

Joel Dagnillo, P.E.
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
7/28/2022 2:50:32 PM
View Colorado Springs Airport Advisory Commission
7/28/2022 9:59:18 AM
This was reviewed at the Airport Advisory Commission meeting held 7/27/2022. The summary with comments is attached. 7/28/2022 9:59:18 AM
View EPC Environmental Services
7/15/2022 4:02:41 PM
7/15/2022 4:02:41 PM
Traffic Review Consultant
7/13/2022 2:31:14 PM
The trip generation letter is rejected as it does not meet the requirements of ECM Section B.1.3. An entirely new TIS is required. 7/13/2022 2:31:14 PM
Colorado Springs Public Works
7/13/2022 12:36:46 PM
Traffic Engineering has no comments on this item.

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
7/13/2022 12:36:46 PM
View PCD Administrative Notice
7/13/2022 12:16:30 PM
Notice, map and labels 7/13/2022 12:16:30 PM
911 Authority - El Paso/Teller County
7/13/2022 8:31:41 AM
No action for E911 on this submittal.
Thank you.
Justin.
7/13/2022 8:31:41 AM
Colorado Parks and Wildlife
7/12/2022 4:03:33 PM
Colorado Parks and Wildlife (CPW) has reviewed the plans for the Sterling Ranch Minor Sketch Plan -Second Amendment. CPW has previously commented on the entirety of the Sterling Ranch project. CPW would like to refer to these comments in regards to this filing.

CPW appreciates being given the opportunity to comment. Please Feel free to contact District Wildlife Manager Aaron Berscheid at 719-439-9601 or aaron.berscheid@state.co.us should you have any questions or require additional information.
7/12/2022 4:03:33 PM
Academy SD 20 Building Fund
7/11/2022 9:44:05 AM
Academy District 20 is in receipt of File# SKP224.

Academy District 20 is requesting land dedication in lieu of fees per the existing El Paso County Code for all residential development within the Sterling Ranch Sketch Plan located within District boundaries as previously requested for all residential development within Sterling Ranch. The District is requesting that fees NOT BE collected as per previous responses regarding Sterling Ranch. The District is aware that Classic Homes is assuming the development of Sterling Ranch and that 2 school sites will be reserved within the Revised Sketch Plan. The District is waiting to receive information regarding an agreement between the county and Classic Homes which will clarify the Districts' request for land dedication for all of Sterling Ranch. The District intends to utilize the land credits for ALL of Sterling Ranch in the future to pay for the sites being proposed by Classic Homes.

If you need additional information or clarification, please contact me.

Don Smith
Planning Consultant