Project Review Comments
- Project Name
- 3511 W Colorado Avenue Site Development Plan
- Description
- Site development plan for mini warehouse in the CS district
- Location
- Parcels
- 7403324007 7403324007
- Applicant
-
Action Excavating, Eric Wyatt
Ollie Watts ( olliewatts@aol.com )
(719) 593-0173 Ollie Watts ( olliewatts@aol.com )
(719) 593-0173 - EA Number
- EA21235
- File Number
- PPR2218
- Project Manager
- Ryan Howser
- Status
- Closed
- Created
- 1/20/2022 9:34:50 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
EPC Stormwater Review
5/14/2022 4:33:39 PM |
Review 1. Property is adjacent to a sensitive area (Fountain Creek) and will require an ESQCP. In addition, WQ will be required if disturbance is greater than 1 acre. Please provide all necessary SW documents for review and confirm proposed area of disturbance. Reviewed by: Christina Prete, P.E. Stormwater Engineer III christinaprete@elpasoco.com |
5/14/2022 4:33:39 PM | |
View |
PCD Project Manager
5/12/2022 1:48:12 PM |
Site development plan comments attached. | 5/12/2022 1:48:12 PM |
View |
PCD Project Manager
5/12/2022 1:45:01 PM |
Letter of intent comments attached. | 5/12/2022 1:45:01 PM |
View |
PCD Project Manager
5/12/2022 1:44:39 PM |
Landscape plan comments attached. | 5/12/2022 1:44:39 PM |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/10/2022 9:30:18 AM |
There is an existing easement that runs through your site that will need to be shown on the plan. You will need to call out size and reception on plan. No metal units will can be on top of the easement. | 5/10/2022 9:30:18 AM | |
PCD Engineering Division
5/3/2022 2:53:50 PM |
Review 1 comments will be uploaded by the project manager. Review comments on the following documents: -Letter of Intent -Site Development Plan Reviewed by: Carlos Hernandez Review Engineer carloshernandez@elpasoco.com |
5/3/2022 2:53:50 PM | |
Pikes Peak Regional Building Department
5/3/2022 12:12:20 PM |
1. Will the existing buildings be used for storage to the general public as well? 2. The main address along with building letters will need to be assign to all storage buildings. A-F if the existing buildings will be used for storage. The lettering should increase on the site as the addressing does down the street. Starting at the gate, the north bldg. is A and so on. Label all buildings with the lettering that apply to storage to the general public. Please email me with a copy. No further comments. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org W: 719-327-2953 |
5/3/2022 12:12:20 PM | |
RBD Floodplain
4/27/2022 3:46:26 PM |
Southern 10-15 ft of the parcel along the creek is floodway and either needs to be left open or provide No-rise certification prepared by a licensed engineer prior to floodplain permit. Buildings located in the flood fringe will need to be elevated to 1 ft above BFE or anchored and vented, parking or storage only. | 4/27/2022 3:46:26 PM | |
Colorado Springs Planning & Community Development
4/26/2022 12:24:31 PM |
City Planning has no comments | 4/26/2022 12:24:31 PM | |
Colorado Springs Public Works
4/25/2022 11:47:19 AM |
Engineering Development Review has no comments on this item. Joel Dagnillo, P.E. Engineering Development Review City of Colorado Springs (719)385-5412 Joel.dagnillo@coloradosprings.gov |
4/25/2022 11:47:19 AM | |
Colorado Springs Public Works
4/19/2022 8:44:38 AM |
Traffic Engineering has no comments on this item. Zaker Alazzeh, P.E. Traffic Engineering Manager/Deputy City Traffic Engineer City of Colorado Springs (719) 385-5468 Zaker.Alazzeh@coloradosprings.gov |