Project Review Comments

Back to List


Project Name
Rocky Mountain Calvary Chapel - Ellicott, Site Development Plan
Description
SDP for church. BOA approved and Subdivision still needed.
Location
Parcels
3400000207 3400000207
Applicant
M.V.E., Inc.
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
EA Number
EA21223
File Number
PPR2420
Project Manager
Ashlyn Mathy
Status
Active
Created
1/6/2022 8:41:45 AM

View: Project Documents



Review Comments (32)

Link Agency Comment
View EPC Health Department
3/14/2025 4:50:42 PM
3/14/2025 4:50:42 PM
View PCD Project Manager
3/12/2025 8:44:35 AM
landscape plan comments 3/12/2025 8:44:35 AM
View PCD Project Manager
3/12/2025 8:44:09 AM
SDP comments 3/12/2025 8:44:09 AM
PCD Project Manager
3/12/2025 8:43:37 AM
Planning has comments on:
-SDP
-Landscape Plan
-Lighting Plan

For the lighting plan, please add the footcandles.

Attached are the SDP and Landscape Plan.

-Ashlyn Mathy
3/12/2025 8:43:37 AM
View Colorado Department of Transportation - Pueblo Office
3/11/2025 5:23:00 PM
Please see the attached letter. 3/11/2025 5:23:00 PM
View EPC Stormwater Review
3/10/2025 2:26:06 PM
SWMP Checklist 3/10/2025 2:26:06 PM
View EPC Stormwater Review
3/10/2025 2:25:50 PM
SWMP 3/10/2025 2:25:50 PM
View EPC Stormwater Review
3/10/2025 2:25:31 PM
PBMP O&M Manual 3/10/2025 2:25:31 PM
View EPC Stormwater Review
3/10/2025 2:25:18 PM
PBMP Applicability Form 3/10/2025 2:25:18 PM
View EPC Stormwater Review
3/10/2025 2:25:01 PM
MHFD Detention Calcs or SDI Form 3/10/2025 2:25:01 PM
View EPC Stormwater Review
3/10/2025 2:24:46 PM
GEC Checklist 3/10/2025 2:24:46 PM
View EPC Stormwater Review
3/10/2025 2:24:32 PM
GEC Plan 3/10/2025 2:24:32 PM
View EPC Stormwater Review
3/10/2025 2:24:19 PM
FAE 3/10/2025 2:24:19 PM
View EPC Stormwater Review
3/10/2025 2:24:05 PM
Drainage Report 3/10/2025 2:24:05 PM
EPC Stormwater Review
3/10/2025 1:44:43 PM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Drainage Report
- FAE
- GEC Plan
- GEC Checklist
- Landscape Plan..............(to be uploaded by PM)
- MHFD Detention Calcs or SDI Form
- PBMP Applicability Form
- PBMP O&M Manual
- SWMP
- SWMP Checklist

Please provide the following document(s) upon resubmittal (the planner will need to send an upload request):
- Notice of Intent to Construct a Non-Juris. Water Impoundment Structure (proof of submittal)

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
3/10/2025 1:44:43 PM
PCD Engineering Division
3/10/2025 10:14:22 AM
Engineering Review Ver.2

Please see engineering review comments on the following documents

ESQCP_V2 Owner sign and date.
FAE_V2 Please update to 2025 form and address comments. Owner and Engineer sign/stamp
DMA_V2 County attorney comments to be addressed. Owner sign and notarize.
TIS_V2 Owner sign
FDR_V2 ENGR and Owner sign
GEC Plan_V2 See comments, Owner sign, ENGR stamp/sign all pages

Easement agreement to be finalized and submitted.
Note Plat must be approved prior to SDP approval.
EPC Road Impact fees are applicable. $2,371/ per 1,000 sf 10,000sqft bldg Fee= $23,710 to be paid at time of building permit.
3/10/2025 10:14:22 AM
View County Attorney - Development Review
3/4/2025 11:27:45 AM
Requested edits to Detention Maintenance Agreement attached.

Lori Seago
Sr. County Attorney
loriseago@elpasoco.com
3/4/2025 11:27:45 AM
PCD Project Manager
6/26/2024 8:56:53 AM
Staff has indicated this project is missing Engineering and Stormwater documents. The submission request will include documents from this review and a request for the missing documents. The next review will be treated as a first review due to the volume of new documents on review 2.

Thank you.

-Ashlyn Mathy
6/26/2024 8:56:53 AM
View PCD Project Manager
6/26/2024 8:55:28 AM
Drainage Report comments 6/26/2024 8:55:28 AM
View PCD Project Manager
6/26/2024 8:54:04 AM
SDP comments 6/26/2024 8:54:04 AM
View PCD Project Manager
6/26/2024 8:53:48 AM
Sign Plan comments 6/26/2024 8:53:48 AM
View PCD Project Manager
6/26/2024 8:53:28 AM
Lighting plan comments 6/26/2024 8:53:28 AM
View PCD Project Manager
6/26/2024 8:53:10 AM
LOI comments 6/26/2024 8:53:10 AM
View PCD Project Manager
6/26/2024 8:52:51 AM
landscape plans comments 6/26/2024 8:52:51 AM
View PCD Project Manager
6/26/2024 8:52:31 AM
Floor plans comments 6/26/2024 8:52:31 AM
View PCD Project Manager
6/26/2024 8:52:11 AM
Elevation plans comments 6/26/2024 8:52:11 AM
View EPC Stormwater Review
6/25/2024 7:51:16 AM
Drainage Report 6/25/2024 7:51:16 AM
View Mountain View Electric Association, Inc.
6/24/2024 9:37:39 AM
See attached comments 6/24/2024 9:37:39 AM
Pikes Peak Regional Building Department
6/19/2024 2:46:52 PM
Enumerations has the following comments:

1. The proposed new building will require a unique street address. Enumerations has assigned the preliminary address of 2170 N. Ellicott Hwy. This address should be used when submitting building plans for permitting.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
6/19/2024 2:46:52 PM
PCD Engineering Division
6/18/2024 2:00:45 PM
Engineering Review Ver.1

Please see engineer comments on the following documents

LOI_V1
SDP_V1
FDR_V1
TIS_V1

The next review will be treated as a first review due to the number of missing documents and inability to review the Plat first. Plat must be submitted for review prior to 2nd review on the SDP.

Documents required for resubmission.
CDs to include signing and stripping sheet for N. Elliott Hwy, paved access road and pond.
GEC plan and checklist
FAE
SWMP and checklist
SDI worksheet
ESQCP
PBMP Applicability Form
Detention Maintenance Agreement with O&M
Provide copy of EPD Health Dept OWTS permit for new system
Copy of access easement for access driveway

Thank you

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
6/18/2024 2:00:45 PM
EPC Stormwater Review
6/25/2024 7:49:23 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report.

Per Ed's comment on the Letter of Intent, many required documents were missing from the first submittal. There were no Stormwater-related documents for me to review besides the Drainage Report. With the next submittal, please submit the documents that Ed has listed in his comment in the Letter of Intent. Thank you.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
6/25/2024 7:49:23 AM
View El Paso County Conservation Dist
6/14/2024 8:32:20 AM
Please see attached .PDF for brief notes. Thanks! 6/14/2024 8:32:20 AM