Project Review Comments

Back to List


Project Name
Jubilee Group Rezone
Description
Location
Parcels
5313001013 5313001013
Applicant
JUBILEE GROUP LLC
STEVE KANG ( stevekang7777@hotmail.com )
(970) 404-2298
STEVE KANG ( stevekang7777@hotmail.com )
(970) 404-2298
EA Number
EA21233
File Number
CS231
Project Manager
Christian Haas
Status
Closed
Created
1/5/2022 7:43:56 AM

View: Project Documents



Review Comments (15)

Link Agency Comment
PCD Engineering Division
7/13/2023 8:23:44 AM
Review 1 comments have been resolved. Engineering has no further comments at this time. Any approved documents will be uploaded by the project manager.

Reviewed by:
Carlos Hernandez
Review Engineer
carloshernandez@elpasoco.com
7/13/2023 8:23:44 AM
View Colorado Department of Transportation - Pueblo Office
7/10/2023 12:26:52 PM
7/10/2023 12:26:52 PM
PCD Project Manager
7/10/2023 11:14:05 AM
From CDOT

• CDOT staff does not have any comments regarding the rezoning of this development.
• A CDOT Access Permit will be required for this development.
• No direct access to SH24 will be allowed.
• Access to the site will be required to share a connection of the Access Control Plans frontage road connection.
• Falcon Hwy and SH24G roadway improvements may be required.
• The SH24G Access Control Plan requires the development of a Frontage Road at this location, the frontage road is planned to run perpendicular to SH24G. Connection of the Frontage Road is to be made at the proposed access point to the site.
• Realignment of Falcon Highway is to take place with future development in this area to make connection to Dublin Rd./Tamlin Rd. to the west.
• The Existing alignment of Falcon Hwy with the curve is to be closed.
• NB SH24 to EB Falcon Hwy will require roadway widening to accommodate an acceleration lane and will be required to accommodate the merging distance for the merging traffic to the through lane or a combo collector distributor lane for this movement to the Frontage Road connection south or to the site right turn lane.
• Roadway restriping will be required.
• Future CDOT roadway widening is in the design phase for SH24 to four lanes.
7/10/2023 11:14:05 AM
PCD Project Manager
3/10/2023 9:26:23 AM
Planning Division has no comments at this time. 3/10/2023 9:26:23 AM
View EPC Health Department
2/23/2023 7:05:40 PM
2/23/2023 7:05:40 PM
Colorado Springs Public Works
2/13/2023 12:14:22 PM
Traffic Engineering will require all public improvements to be built to full City Standards if this site is chosen for pre-annexation.


Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
2/13/2023 12:14:22 PM
Colorado Springs Public Works
2/13/2023 10:50:48 AM
Engineering Development Review will require all public improvements to be built to full City Standards if this is chosen for pre-annexation per the IGA or if Falcon Hwy. is City of Colorado Springs right-of-way.

Joel Dagnillo, P.E.
Engineer III
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
2/13/2023 10:50:48 AM
Upper Black Squirrel Creek GWMD
2/1/2023 11:37:22 AM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. 2/1/2023 11:37:22 AM
View PCD Engineering Division
1/31/2023 2:39:15 PM
V1_Traffic Impact Study Redlines 1/31/2023 2:39:15 PM
PCD Engineering Division
1/31/2023 2:35:53 PM
Review 1:
Review comments on the Traffic Impact Study. Traffic Impact Study Redlines is attached.

Reviewed by:
Carlos Hernandez
Review Engineer
carloshernandez@elpasoco.com
1/31/2023 2:35:53 PM
View EPC Parks Department
1/19/2023 10:24:56 AM
See administrative Parks comments attached. 1/19/2023 10:24:56 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/17/2023 3:16:45 PM
Utilities Development Services at this point has no comments on this application.

cmasoumi@csu.org
1/17/2023 3:16:45 PM
Colorado Springs Planning & Community Development
1/13/2023 2:48:38 PM
The property has contiguity to the north for city of Colorado Springs boundary, if utilities are to be provided by CSU, annexation would be required. If utilities are provided by other means then the city would recommend annexation but would not be required. 1/13/2023 2:48:38 PM
View EPC Environmental Services
1/12/2023 2:45:01 PM
1/12/2023 2:45:01 PM
Falcon Fire Protection District
1/12/2023 2:40:02 PM
Falcon Fire has no objections to this rezone request.
Future commercial projects will be required to meet the minimum requirements of the fire code with any amendments adopted at time of construction. These minimum requirements will also include fire flow, water supply, and access.