Project Review Comments

Back to List


Project Name
Shekoski Residence CDR
Description
Location
Parcels
6206201127 6206201127
Applicant
Construction By Genesis DBA: Jayden Homes
Chris Palmer ( chris@jaydenhomescolorado.com )
(719) 213-7986
Chris Palmer ( chris@jaydenhomescolorado.com )
(719) 213-7986
EA Number
EA21231
File Number
CDR2119
Project Manager
John Green
Status
Closed
Created
12/29/2021 3:27:33 PM

View: Project Documents



Review Comments (12)

Link Agency Comment
PCD Project Manager
2/4/2022 10:51:57 AM
Please upload signed copies of the following documents for approval:

FAE
GEC
Final Drainage Report
2/4/2022 10:51:57 AM
EPC Stormwater Review
2/3/2022 3:12:02 PM
Review 2: EPC Stormwater comments have been resolved on the following documents:
- ESQCP
- FAE
- GEC Plan
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist

EPC Stormwater has no further comments at this time. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
2/3/2022 3:12:02 PM
PCD Engineering Division
2/1/2022 10:19:45 AM
PCD Engineering comments have been resolved. The project manager will upload any approved documents.

Reviewed by:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
2/1/2022 10:19:45 AM
View PCD Project Manager
1/26/2022 8:54:18 AM
Please see redline comments on GEC Plan 1/26/2022 8:54:18 AM
View PCD Project Manager
1/26/2022 8:53:58 AM
Please see redline comments on FAE 1/26/2022 8:53:58 AM
View PCD Project Manager
1/26/2022 8:53:41 AM
Please see redline comments on ESQCP 1/26/2022 8:53:41 AM
View PCD Project Manager
1/26/2022 8:53:23 AM
Please see redline comments on Drainage Letter 1/26/2022 8:53:23 AM
PCD Engineering Division
1/25/2022 2:38:40 PM
Review 1 comments will be uploaded by the project manager. Please address comments on the following documents:

-Drainage report
-Gec plan

Please address both PCD Engineering comments and EPC Stormwater comments and submit all documents with the appropriate stamps/signatures.

Reviewed by:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
1/25/2022 2:38:40 PM
View EPC Stormwater Review
1/19/2022 4:30:56 PM
SWMP Checklist 1/19/2022 4:30:56 PM
View EPC Stormwater Review
1/19/2022 4:30:36 PM
SWMP 1/19/2022 4:30:36 PM
View EPC Stormwater Review
1/19/2022 4:30:15 PM
GEC Checklist 1/19/2022 4:30:15 PM
EPC Stormwater Review
1/24/2022 8:06:39 AM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- ESQCP...................(to be uploaded by PM with PCD comments)
- FAE........................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- SWMP
- SWMP Checklist

Please provide the following documents on resubmittal:
- PBMP Applicability Form. We need to document that stormwater runoff is being treated. For this site, select "yes" for Item D in Part IV on page 3. Download the form from https://publicworks.elpasoco.com/stormwater/

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
1/24/2022 8:06:39 AM