Project Review Comments

Back to List


Project Name
RV Storage Vollmer Rd
Description
Location
Parcels
5233001001 5233001001
Applicant
Scott Belknap
Bill Guman ( bill@guman.net )
(719) 633-9700
Bill Guman ( bill@guman.net )
(719) 633-9700
File Number
PPR2245
Project Manager
Kylie Bagley
Status
Active
Created
12/1/2021 11:11:37 AM

View: Project Documents



Review Comments (67)

Link Agency Comment
View PCD Engineering Division
4/2/2024 10:04:54 AM
FAE Redlines 4/2/2024 10:04:54 AM
PCD Engineering Division
4/2/2024 10:07:04 AM
Please see comments regarding FAE. Private items can be removed. Also driveway culvert within Vollmer ROW will be a private structure.

In the TIS, please include statement regarding road impact fees and if full fees will be paid or one of the PID districts will be used.

Here are the steps for determining the road impact fees for the site:

EPC Road Impact fee are assessed in accordance to the new approved use and pending site plan approval.
The following ECP website explain the program:
https://publicworks.elpasoco.com/road-impact-fees/

Based on the to be approved site development plan and commerical use
The following classification is the appropriate use and fee rate.
Mini Warehouse $725/1000sqft
This use is applicable to RV type storage rental. This is the lowest use class and fee cost.
The "building" area would be based on the parking area minus the drive aisles. This should only account for areas where RV's will be parked. The building sqft would be divided by 1000 and then multiplied by the rate.

The fees in this case would be paid directly to the PCD Dept since a building permit is not being obtained.

Please follow up with Brad Walters, Inspections @ bradwalters@elpasoco.com for Pre-Con meeting and next steps.

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
4/2/2024 10:07:04 AM
PCD Engineering Division
3/25/2024 7:49:47 AM
On GEC Plan, Drainage Report and FAE, please update engineer's signature to be through the seal.

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
3/25/2024 7:49:47 AM
View County Attorney - Development Review
3/19/2024 12:15:00 PM
Signature to detention maintenance agreement attached. 3/19/2024 12:15:00 PM
View County Attorney - Development Review
3/5/2024 4:06:45 PM
Corrected Detention Maintenance Agreement attached. 3/5/2024 4:06:45 PM
County Attorney - Development Review
2/20/2024 1:54:29 PM
Please submit Detention Maintenance Agreement in Word for ease of review and editing. 2/20/2024 1:54:29 PM
PCD Engineering Division
2/15/2024 3:10:35 PM
All engineering comments have been resolved.

Please provide a signed copy of the TIS.

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
2/15/2024 3:10:35 PM
View PCD Engineering Division
2/8/2024 9:01:35 AM
FAE Redlines 2/8/2024 9:01:35 AM
View PCD Engineering Division
2/8/2024 9:01:12 AM
FDR Redlines 2/8/2024 9:01:12 AM
PCD Engineering Division
2/8/2024 9:00:39 AM
Engineering Review 5: Redline comments to the following document will be uploaded as separate comments.
- Drainage Report
- FAE (Update to 2024 form)

Comments have been resolved on the following documents:
- Site Plan
- GEC

Please provide signed copies of all documents.

Charlene Durham, PE
charlenedurham@elpasoco.com
2/8/2024 9:00:39 AM
PCD Project Manager
2/2/2024 4:17:07 PM
Site plan needs to clearly show where the driveway connects to vollmer place. 2/2/2024 4:17:07 PM
EPC Stormwater Review
2/1/2024 3:24:25 PM
Review 5: EPC DPW Stormwater comments have been resolved on the following documents:
- ESQCP
- GEC Plan

EPC DPW Stormwater has no further comments. Planner: no re-review necessary.

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
2/1/2024 3:24:25 PM
View PCD Engineering Division
12/15/2023 9:34:08 AM
Site Development Plan Redlines 12/15/2023 9:34:08 AM
View PCD Engineering Division
12/15/2023 9:33:39 AM
GEC Redlines 12/15/2023 9:33:39 AM
View PCD Engineering Division
12/15/2023 9:32:58 AM
Drainage Report Redlines 12/15/2023 9:32:58 AM
PCD Engineering Division
12/15/2023 9:35:37 AM
Engineering Review 3 redline comments to the following document will be uploaded as separate comments.
- GEC
- Drainage Report
- Site Plan

Comments have been resolved on the following documents:
- Soils & Geology Memo
- FAE

Please provide signed copies of all documents.

Charlene Durham, PE
charlenedurham@elpasoco.com
12/15/2023 9:35:37 AM
PCD Project Manager
12/13/2023 3:29:04 PM
Site Development plan comments to be uploaded by engineering department 12/13/2023 3:29:04 PM
EPC Stormwater Review
12/13/2023 2:27:15 PM
Review 4: EPC Stormwater comments have been provided (in orange text boxes) on the following documents (to be uploaded by the Planner):
- GEC Plan

Please sign/date/stamp the following documents for approval:
- ESQCP

EPC DPW Stormwater comments have been resolved on the following documents:
- Drainage Report
- FAE

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com

Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
12/13/2023 2:27:15 PM
View PCD Project Manager
6/8/2023 3:29:47 PM
Financial Assurance Form Redlines 6/8/2023 3:29:47 PM
View PCD Project Manager
6/8/2023 3:28:57 PM
Site Development Plan Redlines 6/8/2023 3:28:57 PM
View PCD Project Manager
6/8/2023 3:28:35 PM
Landscape Redlines 6/8/2023 3:28:35 PM
View PCD Engineering Division
6/7/2023 2:17:38 PM
Soils Memo Redlines 6/7/2023 2:17:38 PM
View PCD Engineering Division
6/7/2023 1:59:05 PM
GEC Redlines 6/7/2023 1:59:05 PM
View PCD Engineering Division
6/7/2023 1:58:33 PM
FDR Redlines 6/7/2023 1:58:33 PM
PCD Engineering Division
6/7/2023 2:15:09 PM
Engineering Review 3 redline comments to the following document will be uploaded as separate comments.
- Soils & Geology Memo
- GEC
- Drainage Report
- Site Plan (to be uploaded by Project Manager)
- FAE (to be uploaded by Project Manager)


Charlene Durham, PE
charlenedurham@elpasoco.com
6/7/2023 2:15:09 PM
EPC Stormwater Review
6/6/2023 4:20:40 PM
Review 3: EPC Stormwater comments have been provided (in orange text boxes) on the following documents (to be uploaded by the Planner):
- GEC Plan
- Drainage Report
- FAE

Please sign/date/stamp the following documents for approval:
- PBMP Applicability Form
- ESQCP

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
6/6/2023 4:20:40 PM
View EPC Health Department
1/13/2023 11:34:51 AM
1/13/2023 11:34:51 AM
View PCD Project Manager
11/22/2022 3:52:14 PM
Drainage Report Final_V2 redlines 11/22/2022 3:52:14 PM
View PCD Project Manager
11/22/2022 3:51:27 PM
Financial Assurance Forms_V2 redlines 11/22/2022 3:51:27 PM
View PCD Project Manager
11/22/2022 3:51:06 PM
Grading and Erosion Control Plan_V2 redlines 11/22/2022 3:51:06 PM
View PCD Project Manager
11/22/2022 3:50:11 PM
Landscape Plan Drawings_V2 redlines 11/22/2022 3:50:11 PM
View PCD Project Manager
11/22/2022 3:49:49 PM
Site Development Plan_V2 redlines 11/22/2022 3:49:49 PM
PCD Engineering Division
11/22/2022 12:31:51 PM
Engineering Review 2 redline comments to the following document will be uploaded as separate comments.
- Site Plan
- GEC
- Drainage Report
- FAE

Comments have been resolved on the following documents:
- TIS

Please note:
1. Follow up with El Paso County Department of Public Works to determine if a "Work in the ROW Permit" will be needed to perform work in Vollmer ROW.
2. Offsite work for drainage swale will need to be coordinated with property owner.

Reviewed by:
Charlene Durham, P.E.
charlenedurham@elpasoco.com
11/22/2022 12:31:51 PM
EPC Stormwater Review
11/22/2022 1:46:32 PM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report..................(to be uploaded with PCD comments)
- GEC Plan............................(to be uploaded with PCD comments)

Please provide the following documents upon resubmittal:
- MS4 Post Construction Form
- O&M Manual
- SDI Form

Please sign/date/stamp the following documents for approval:
- PBMP Applicability Form
- ESQCP

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
11/22/2022 1:46:32 PM
Black Forest Fire Protection District
11/15/2022 8:21:30 AM
BFFR
Since this is an unmanned storage there would be no water requirement. We would ask that the storage of flammable liquids be addressed within the individual RV's and the emergency access be discussed with the fire district prior to installation. JMR
11/15/2022 8:21:30 AM
Mountain View Electric Association, Inc.
11/14/2022 10:44:05 AM
See comment letter dated August 22, 2022 11/14/2022 10:44:05 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/2/2022 7:30:09 AM
For any questions regarding CS Utilities' gas services, please contact 719-668-4985.

Corey Masoumi, cmasoumi@csu.org
11/2/2022 7:30:09 AM
View EPC Health Department
9/16/2022 9:16:59 AM
9/16/2022 9:16:59 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/8/2022 2:46:25 PM
No apparent conflict. No comment.
Corey Masoumi - Cmasoumi@csu.org
9/8/2022 2:46:25 PM
View PCD Project Manager
9/7/2022 10:10:18 AM
Traffic Impact Study_V1 redlines 9/7/2022 10:10:18 AM
View PCD Project Manager
9/7/2022 10:09:47 AM
SWMP Plan_V1 redlines 9/7/2022 10:09:47 AM
View PCD Project Manager
9/7/2022 10:09:00 AM
SWMP Checklist_V1 redlines 9/7/2022 10:09:00 AM
View PCD Project Manager
9/7/2022 10:08:33 AM
Site Development Plan_V1 redlines 9/7/2022 10:08:33 AM
View PCD Project Manager
9/7/2022 10:08:14 AM
PBMP Applicability Form_V1 redlines 9/7/2022 10:08:14 AM
View PCD Project Manager
9/7/2022 10:07:50 AM
Lighting Plan_V1 redlines 9/7/2022 10:07:50 AM
View PCD Project Manager
9/7/2022 10:07:23 AM
Letter of Intent_V1 redlines 9/7/2022 10:07:23 AM
View PCD Project Manager
9/7/2022 10:06:55 AM
Landscape Plan Drawings_V1 redlines 9/7/2022 10:06:55 AM
View PCD Project Manager
9/7/2022 10:06:28 AM
Grading and Erosion Control Plan_V1 redlines 9/7/2022 10:06:28 AM
View PCD Project Manager
9/7/2022 10:05:23 AM
Grading and Erosion Control Checklist_V1 redlines 9/7/2022 10:05:23 AM
View PCD Project Manager
9/7/2022 10:04:53 AM
Financial Assurance Forms_V1 redlines 9/7/2022 10:04:53 AM
View PCD Project Manager
9/7/2022 10:04:30 AM
Erosion and Stormwater Quality Control Permit_V1 redlines 9/7/2022 10:04:30 AM
View PCD Project Manager
9/7/2022 10:04:09 AM
Drainage Report Final_V1 redlines 9/7/2022 10:04:09 AM
View PCD Engineering Division
9/7/2022 9:01:42 AM
Site Plan Redlines 9/7/2022 9:01:42 AM
View PCD Engineering Division
9/7/2022 9:00:59 AM
TIS Redlines 9/7/2022 9:00:59 AM
PCD Engineering Division
9/7/2022 8:59:43 AM
Engineering Review 1 redline comments to the following document will be uploaded as separate comments.
- TIS
- Site Plan
- GEC
- Drainage Report

Reviewed by:
Charlene Durham, P.E.
charlenedurham@elpasoco.com
9/7/2022 8:59:43 AM
View EPC Stormwater Review
9/6/2022 9:38:34 AM
FAE_v1 9/6/2022 9:38:34 AM
View EPC Stormwater Review
9/6/2022 9:38:09 AM
ESQCP_v1 9/6/2022 9:38:09 AM
View EPC Stormwater Review
9/6/2022 9:37:44 AM
SWMP Checklist_v1 9/6/2022 9:37:44 AM
View EPC Stormwater Review
9/6/2022 9:37:10 AM
SWMP_v1 9/6/2022 9:37:10 AM
View EPC Stormwater Review
9/6/2022 9:35:57 AM
PBMP_v1 9/6/2022 9:35:57 AM
View EPC Stormwater Review
9/6/2022 9:35:22 AM
GEC Checklist_v1 9/6/2022 9:35:22 AM
View EPC Stormwater Review
9/6/2022 9:34:39 AM
GEC Plan_v1 9/6/2022 9:34:39 AM
View EPC Stormwater Review
9/6/2022 9:32:54 AM
Drainage Report_v1 9/6/2022 9:32:54 AM
EPC Stormwater Review
9/6/2022 9:31:02 AM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report..................(to be uploaded with PCD comments)
- GEC Plan............................(to be uploaded with PCD comments)
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist
- ESQCP
- FAE

Please provide the following documents upon resubmittal:
- MS4 Post Construction Form
- O&M Manual
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement
- SDI Form

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
9/6/2022 9:31:02 AM
View Mountain View Electric Association, Inc.
8/22/2022 11:08:44 AM
See attached comments 8/22/2022 11:08:44 AM
Pikes Peak Regional Building Department
8/22/2022 8:49:09 AM
Since there are no structures be proposed, Enumerations has no comment for this project.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
8/22/2022 8:49:09 AM
Black Forest Fire Protection District
8/2/2022 2:17:44 PM
Black Forest Fire Rescue/JMR
Is there a plan to have Firefighting water source on site?
What is the access plan for public safety?
8/2/2022 2:17:44 PM