Project Review Comments

Back to List


Project Name
MVEA --- Eastonville 2 Construction Drawings
Description
Location
Applicant
Mountain View Electric Association, Inc.
Nicole Rietz ( nicole.r@mvea.coop )
(719) 749-8482
Nicole Rietz ( nicole.r@mvea.coop )
(719) 749-8482
File Number
CDR2115
Project Manager
Ryan Howser
Status
Closed
Created
10/5/2021 11:16:05 AM

View: Project Documents



Review Comments (18)

Link Agency Comment
PCD Project Manager
11/30/2021 1:22:52 PM
Planning Division has no further comments at this time. Please coordinate with Brad Walters (bradwalters@elpasoco.com) to set up a preconstruction meeting. 11/30/2021 1:22:52 PM
EPC Stormwater Review
11/23/2021 11:50:46 AM
Review 2: EPC Stormwater comments have been resolved on the following documents:
- ESQCP
- FAE
- GEC Checklist
- SWMP
- SWMP Checklist

EPC Stormwater has no further comments at this time. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
11/23/2021 11:50:46 AM
PCD Engineering Division
11/17/2021 1:00:26 PM
PCD Engineering has no further comments regarding drainage or transportation. Any approved documents will be uploaded by the project manager.

Reviewed by:
Carlos Hernandez
Review Engineer
carloshernandez@elpasoco.com
11/17/2021 1:00:26 PM
RBD Floodplain
11/17/2021 9:17:58 AM
Since no permanent above ground structures or grading changes occur in the SFHA , Regional floodplain does not need a permit for this work. 11/17/2021 9:17:58 AM
View PCD Project Manager
11/12/2021 3:17:02 PM
PCD Engineering - letter of intent comments 11/12/2021 3:17:02 PM
View PCD Project Manager
11/12/2021 3:16:48 PM
PCD Engineering and EPC Stormwater - grading & erosion control plan comments 11/12/2021 3:16:48 PM
View PCD Project Manager
11/12/2021 3:16:25 PM
PCD Engineering and EPC Stormwater - financial assurance comments 11/12/2021 3:16:25 PM
View PCD Project Manager
11/12/2021 3:16:04 PM
EPC Stormwater - ESQCP comments 11/12/2021 3:16:04 PM
PCD Engineering Division
11/10/2021 4:56:52 PM
Review 1 comments will be uploaded by the project manager. Review comments on the following documents:

- Letter of Intent
- Grading & Erosion Control Plan
- Financial Assurance Estimate Form

- Please reference ECM Appendix F, detail drawing SD_4-20 and provide a new detail in the GEC Plan showing the proposed open-cut trench across Eastonville Road. Please use ECM Section K.1.8 Repairs to Gravel Roads and Shoulder for information to include in the detail drawing.

Please be aware of the following:
- The project will be forwarded to the Pikes Peak Regional Building Department Floodplain Administrator per the proposed trenching inside FEMA Flood Zone A.

- Applicant is required to apply for a Work in Right-of-Way permit for proposed work taking place on county right-of-way.


Reviewed by:
Carlos Hernandez
Review Engineer
carloshernandez@elpasoco.com
11/10/2021 4:56:52 PM
View EPC Stormwater Review
11/10/2021 2:18:53 PM
SWMP Checklist_V1 11/10/2021 2:18:53 PM
View EPC Stormwater Review
11/10/2021 2:18:28 PM
Storm Water Management Plan (SWMP)_V1 11/10/2021 2:18:28 PM
View EPC Stormwater Review
11/10/2021 2:17:50 PM
GEC Checklist_V1 11/10/2021 2:17:50 PM
EPC Stormwater Review
11/10/2021 2:16:57 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- ESQCP...................(to be uploaded by PM with PCD comments)
- FAE.......................(to be uploaded by PM with PCD comments)
- GEC Checklist
- SWMP
- SWMP Checklist

Please sign last page of both GEC and SWMP Checklists upon resubmittal.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
11/10/2021 2:16:57 PM
Falcon Fire Protection District
11/9/2021 1:58:04 PM
Falcon Fire has reviewed this project for MVEA and has no objections or concerns. 11/9/2021 1:58:04 PM
View El Paso County Conservation Dist
11/9/2021 11:27:22 AM
11/9/2021 11:27:22 AM
View El Paso County Conservation Dist
11/9/2021 11:27:07 AM
11/9/2021 11:27:07 AM
Upper Black Squirrel Creek GWMD
11/3/2021 11:14:09 AM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment in the future if necessary. 11/3/2021 11:14:09 AM
Woodmen Road Metro
10/28/2021 3:17:37 PM
There is no comment for the proposed project. 10/28/2021 3:17:37 PM