View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
9/8/2021 11:54:17 AM |
PCD-Engineering has the following comment: 1. Staff recommends that the pedestrian ramp detail on Sheet DT2 should label the landing slope as 2% maximum slope in any direction. -- Jeff Rice - 719-520-7877 |
9/8/2021 11:54:17 AM |