Project Review Comments

Back to List


Project Name
Falcon Field Residential Rezone
Description
Rezone of portion of property from CR to RS-5000 and RM-12
Location
Parcels
4307000001 4307000001 4307200015 4307200015
Applicant
N.E.S.
Jon Romero ( jromero@nescolorado.com )
(719) 471-0073
Jon Romero ( jromero@nescolorado.com )
(719) 471-0073
EA Number
EA21125
File Number
P217
Project Manager
Ryan Howser
Status
Closed
Created
7/22/2021 8:58:44 AM

View: Project Documents



Review Comments (23)

Link Agency Comment
PCD Engineering Division
1/25/2022 10:58:06 PM
The ECM administrator has accepted the traffic impact study. The project manager will upload the traffic study onto EDARP.

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
1/25/2022 10:58:06 PM
PCD Project Manager
1/21/2022 3:04:53 PM
Planning Division has no comments at this time. Project tentatively scheduled for PC for 2/17/2022. Please contact the Project Manager with any questions. 1/21/2022 3:04:53 PM
View PCD Engineering Division
1/13/2022 3:58:09 PM
Review 2 comments on the following documents will be uploaded:
-Traffic Study


Ryan: a 3 day turnaround is sufficient.

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
1/13/2022 3:58:09 PM
View PCD Project Manager
1/12/2022 5:13:46 PM
PCD Planning - letter of intent comments 1/12/2022 5:13:46 PM
View EPC Environmental Services
12/22/2021 10:30:35 AM
12/22/2021 10:30:35 AM
RBD Floodplain
12/22/2021 8:13:19 AM
Letter of intent recognizes the need for CLOMR LOMR prior to channel improvements and plat:
"Future efforts will address a floodplain map revision and formal CLOMR/LOMR to address channel improvements."

Base Flood Elevation (BFEs) must be established via approved and effective LOMR prior to plat.
The time frame for LOMRS from initial application to effective date has been taking up to 2 years.
Floodplain has no comment on zoning or rezoning these parcels.
12/22/2021 8:13:19 AM
View EPC Health Department
11/12/2021 6:59:10 PM
11/12/2021 6:59:10 PM
View Colorado Department of Transportation - Pueblo Office
11/4/2021 10:45:03 AM
11/4/2021 10:45:03 AM
County Attorney - Development Review
10/28/2021 3:19:19 PM
County Attorney's Office has communicated directly with staff. No further comments. 10/28/2021 3:19:19 PM
View PCD Project Manager
10/26/2021 10:41:04 AM
PCD Planning - zoning map comments 10/26/2021 10:41:04 AM
View PCD Project Manager
10/26/2021 10:40:48 AM
PCD Engineering - traffic impact study comments 10/26/2021 10:40:48 AM
View PCD Project Manager
10/26/2021 10:40:29 AM
PCD Planning - letter of intent comments 10/26/2021 10:40:29 AM
View PCD Project Manager
10/26/2021 10:40:13 AM
PCD Planning - adjacent owner notification comments 10/26/2021 10:40:13 AM
View PCD Engineering Division
10/25/2021 5:28:38 PM
Review 1 comments on the following documents will be uploaded:
-Traffic Study


reviewed by:
Daniel Torres
danieltorres@elpasoco.com
10/25/2021 5:28:38 PM
View Parks Advisory Board
10/22/2021 11:08:04 AM
El Paso County Community Services / Parks Final Comments - Please See Attached Documents (No PAB Endorsement Necessary for Rezoning Applications) 10/22/2021 11:08:04 AM
View EPC Parks Department
10/22/2021 11:06:54 AM
El Paso County Community Services / Parks Final Comments - Please See Attached Documents (No PAB Endorsement Necessary for Rezoning Applications) 10/22/2021 11:06:54 AM
Pikes Peak Regional Building Department
10/18/2021 7:06:23 AM
The intent letter states that both sites are currently vacant. Parcel number 43070-00-001 has an existing ranch home, multiple sheds, shop & 2 stables as listed on the El Paso County Assessors website. The address to this site is 12445 Rio Lane. Regional Building have no record of any structures being demolished/wrecked for this site. Please clarify. If these structures are still on site, where will the access to this home come from with the rezone? Contact me please.

No further comments at this time.



Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org W: 719-327-2953
10/18/2021 7:06:23 AM
Mountain View Electric Association, Inc.
10/11/2021 1:00:12 PM
Mountain View Electric Association (MVEA) has no objections to current plan. 10/11/2021 1:00:12 PM
Upper Black Squirrel Creek GWMD
10/6/2021 3:47:01 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. 10/6/2021 3:47:01 PM
View EPC Environmental Services
10/5/2021 12:14:53 PM
10/5/2021 12:14:53 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/5/2021 7:30:35 AM
No comments.

Caleb Savage
Utilities Development Services | Colorado Springs Utilities
O: 719-668-1855 | cjsavage@csu.org
10/5/2021 7:30:35 AM
View US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
10/4/2021 2:56:12 PM
10/4/2021 2:56:12 PM
RBD Floodplain
9/28/2021 8:59:16 AM
This site has FEMA A zone within the proposed development. The Floodplain will need to be studied via the FEMA Letter of Map Revision (LOMR) process with BFEs determined and shown on the plat in order to satisfy portions of RBC 313. It is suggested to initiate a Conditional Letter of Map Revision (CLOMR) ASAP in order to expedite the LOMR process.
Applicable code section below :

RBC313.18.5 Subdivision Proposals. All subdivision proposals shall be consistent with the need to minimize flood damage;
All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage;
All subdivision proposals shall have adequate drainage provided to reduce exposure to flood damage;
FEMA approved base flood elevation data and 100-year floodplain boundaries shall be provided and shown on plats
for subdivision proposals and other proposed developments that contain at least fifty lots or five (5) acres, whichever is less;
All buildable lots less than two and one half (2½) acres in size are required to be located entirely outside of the 100-year floodplain. Lands within the 100-year floodplain shall be established in a tract, and require that the owner maintain the tract. Buildable lots two
and one half (2½) acres and larger, are required to have the 100-year floodplain contained in a drainage easement dedicated by plat in the name of the governing body with the restrictions of “No Build” and “No Storage of any Materials”; and
9/28/2021 8:59:16 AM