Project Review Comments

Back to List


Project Name
Citizen on Constitution Multi-family Apartments
Description
Site Development Plan a multi-family development- Proposed Plat will includes Public ROW Akers and Detention Tracts.
Location
Parcels
5405000035 5405000035 5405000051 5405000051 5405104074 5405104074 5405104075 5405104075
Applicant
The Garrett Companies
Joseph Menke ( joseph.menke@kimley-horn.com )
(719) 284-7310
Joseph Menke ( joseph.menke@kimley-horn.com )
(719) 284-7310
EA Number
EA21132
File Number
PPR2229
Project Manager
Ashlyn Mathy
Status
Closed
Created
7/16/2021 3:57:30 PM

View: Project Documents



Review Comments (46)

Link Agency Comment
PCD Project Manager
1/13/2023 3:20:03 PM
moving forward to closing out project next week. 1/13/2023 3:20:03 PM
Colorado Geological Survey
1/13/2023 2:21:16 PM
CGS has previously reviewed this site (38.8673, -104.685) on February 21, May 3, November 11, and November 28, 2022. Our previous comments are a part of this review. As stated in our email to Kari Parsons dated December 1, 2022, “CTL has provided calculations and the methodology used to determine the settlement potential of the undocumented fill. CGS appreciates the additional information, as this satisfies the request from our review of this application. CGS has no further objection to the approval of the development plan and final plat.” As recommended, CTL has provided language that can be added to plat note #11 on page 3 of their letter dated November 14, 2022.

Submitted 1/13/2023 by Jonathan R. Lovekin, P.G. Senior Engineering Geologist, Colorado Geological Survey, jlovekin@mines.edu
1/13/2023 2:21:16 PM
PCD Project Manager
1/6/2023 9:49:50 AM
planning comments are resolved. Awaiting CGS for their final review. 1/6/2023 9:49:50 AM
PCD Engineering Division
1/5/2023 5:17:55 PM
Engineering comments have been resolved. The approved engineering documents will be uploaded onto EDARP.

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
1/5/2023 5:17:55 PM
Cherokee Metro Dist
1/4/2023 9:13:58 AM
Cherokee Metropolitan District has no comments on this stage of plans. However, the District reserves the right to review any changes to the water and sewer plans for this development. 1/4/2023 9:13:58 AM
Cherokee Metro Dist
11/14/2022 9:29:46 AM
Cherokee Metropolitan District disapproves these plans pending the following changes:

-Call out fire hydrants and fire hydrant line sizes on water utility plans
-Provide fire hydrant installation detail in utility details
-Add applicable utility crossing details from Colorado Springs Utilities Water and Wastewater LESS
-Add to notes that wastewater mains laid at less than 1.06% slope must have select bedding per Wastewater LESS

Please reupload with these changes for approval.
11/14/2022 9:29:46 AM
EPC Stormwater Review
11/1/2022 2:30:36 PM
Review 4: All previous comments submitted with SF226 have been resolved. And documents that were previously requested to be uploaded to this PPR were uploaded. So my review is complete.

EPC Stormwater has no further comments. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
11/1/2022 2:30:36 PM
View PCD Project Manager
10/11/2022 11:02:12 AM
Sign plan comments 10/11/2022 11:02:12 AM
View PCD Project Manager
10/11/2022 11:00:14 AM
Planning:
SDP
10/11/2022 11:00:14 AM
View PCD Project Manager
10/10/2022 1:44:20 PM
engineering landscape plans 10/10/2022 1:44:20 PM
View PCD Project Manager
10/10/2022 1:41:30 PM
engineering comments
SDP minor
10/10/2022 1:41:30 PM
PCD Engineering Division
10/6/2022 7:39:35 AM
Review 2 comments on the following documents will be uploaded by the project manager:
-Landscape Drawings (minor comments)
-Site Development Plan (minor comments)

Please refer to the Final plat application for comments on the Final drainage report and TIS.
Ensure that any comments on the final plat application are carried over to the documents on the site development plan application.

No Additional PCD Engineering comments on the following documents-Site Development Plan
-GEC plan
-Letter of Intent


reviewed by:
Daniel Torres
danieltorres@elpasoco.com
10/6/2022 7:39:35 AM
View PCD Project Manager
10/5/2022 3:56:37 PM
SDP comments 10/5/2022 3:56:37 PM
View PCD Project Manager
10/5/2022 3:56:06 PM
see comments from planning.
sign plan
SDP
10/5/2022 3:56:06 PM
Cherokee Metro Dist
9/28/2022 11:19:00 AM
Replace Sheet 3.0 Utility Plan Cover Sheet with CMD signed version. 9/28/2022 11:19:00 AM
EPC Stormwater Review
9/27/2022 8:35:52 AM
Review 3: See comments on the soon-to-be-uploaded documents for SF226, since they are duplicate documents.

With the next submittal, go ahead and upload copies of the following documents to this PPR as well, since all comments have been resolved on them with the SF review. Ask Ashlyn to send you the EDARP upload requests.
- ESQCP
- MS4 Post Construction Form
- SDI Form

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
9/27/2022 8:35:52 AM
Cherokee Metro Dist
9/20/2022 3:32:51 PM
Replace Sheet 3.0 Utility Plan Cover Sheet with CMD signed version. 9/20/2022 3:32:51 PM
PCD Project Manager
9/8/2022 9:17:06 AM
Waiting on Submittal of Final Plat documents and Stormwater review 9/8/2022 9:17:06 AM
View PCD Project Manager
8/25/2022 11:58:24 AM
Update made to project:
Staff has stopped review until the Final Plat is submitted. Documents to be due at the same time so that there is no discrepancy between the design documents.

8/25/22 PCD staff / AGM
8/25/2022 11:58:24 AM
Cherokee Metro Dist
8/25/2022 11:31:31 AM
Final approval pending submittal of Final Plat that contains Cherokee signature on Water and Wastewater Plans 8/25/2022 11:31:31 AM
View PCD Project Manager
7/12/2022 9:12:13 AM
traffic Memo comments 7/12/2022 9:12:13 AM
View PCD Project Manager
7/12/2022 9:09:43 AM
Grading and Erosion control Plan 7/12/2022 9:09:43 AM
View PCD Project Manager
7/12/2022 8:30:05 AM
Drainage Report 7/12/2022 8:30:05 AM
View PCD Project Manager
7/12/2022 8:23:38 AM
Sign Plan comments 7/12/2022 8:23:38 AM
View PCD Project Manager
7/12/2022 8:23:12 AM
Site Development Plan
I have uploaded the first submittal because the comments are on this document and those comments have not been addressed on the second submittal of the site development plan that has the utility plans provided.
7/12/2022 8:23:12 AM
View PCD Project Manager
7/12/2022 8:16:12 AM
Lighting Plan comments 7/12/2022 8:16:12 AM
View PCD Project Manager
7/12/2022 8:15:41 AM
Landscape Plans comments 7/12/2022 8:15:41 AM
View PCD Project Manager
7/12/2022 8:15:08 AM
Letter of Intent comments 7/12/2022 8:15:08 AM
PCD Engineering Division
7/11/2022 12:47:27 AM
Please see comments on the Review #1 docs. Additionally, see comments provided on the final plat application SF226.

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
7/11/2022 12:47:27 AM
EPC Stormwater Review
7/7/2022 1:56:05 PM
Please see comments on the Review #1 docs. Updated documents were not uploaded by the applicant with this submittal. 7/7/2022 1:56:05 PM
Cherokee Metro Dist
7/6/2022 2:55:10 PM
Site Development Plan Sheet C3.0 does not have Cherokee signature. Repost with signed drawing. 7/6/2022 2:55:10 PM
View PCD Project Manager
6/21/2022 12:47:47 PM
see comments. 6/21/2022 12:47:47 PM
View PCD Project Manager
6/21/2022 12:46:57 PM
see comments. 6/21/2022 12:46:57 PM
View PCD Project Manager
6/21/2022 12:45:59 PM
see comments. 6/21/2022 12:45:59 PM
View PCD Project Manager
6/21/2022 12:45:27 PM
see comments. 6/21/2022 12:45:27 PM
PCD Engineering Division
6/20/2022 5:31:44 PM
Review 1 comments on the following documents will be uploaded by the project manager:
-Site Development Plan
-Drainage Report
-GEC plan (see stormwater engineer comments)
-Landscape Drawings
-Letter of Intent
-Traffic Study


reviewed by:
Daniel Torres
danieltorres@elpasoco.com
6/20/2022 5:31:44 PM
View EPC Stormwater Review
6/20/2022 3:00:22 PM
SWMP 6/20/2022 3:00:22 PM
EPC Stormwater Review
6/20/2022 2:58:05 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report..............(to be uploaded by PM with PCD comments)
- GEC Plan.........................(to be uploaded by PM with PCD comments)
- Site Development Plan....(to be uploaded by PM with PCD comments)
- SWMP

We will eventually want the final copies of the following documents uploaded to this PPR as well. They are already uploaded and under review with SF226. You can wait until they are finalized with the SF, before uploading with the PPR to avoid duplicate reviews/comments on the same documents.
- ESQCP
- MS4 Post Construction Form
- SDI Form

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
6/20/2022 2:58:05 PM
View Mountain View Electric Association, Inc.
6/13/2022 1:30:33 PM
See attached comments 6/13/2022 1:30:33 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/13/2022 11:59:50 AM
key notes are not allowed on the development plan. I would have the engineer reach out to me on this project in reference to the water main connection that they propose in Constitution Ave this will need to be discussed prior to me finalizing my review comments they can reach me at 719-668-8769 or ajuvera@csu.org 6/13/2022 11:59:50 AM
Pikes Peak Regional Building Department
6/13/2022 11:24:26 AM
Regarding a request for approval of a development plan for Citizen on Constitution, Enumerations has the following comments:

1. Addressing for this project has been provided to the applicant. All addressing is from the approved internal street name of Norice Grove. This street name needs to be shown on the development plan.
2. When submitting building plans, Show the secondary addressing for the apartment buildings which follows the secondary addressing guidelines available on the RBD website.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
6/13/2022 11:24:26 AM
Colorado Springs Public Works
6/13/2022 8:20:22 AM
Engineering Development Review Division has no comments on this item.

Patrick V. Morris
Civil Engineer II
Public Works/Engineering Development Review
City of Colorado Springs
Phone: 719-385-5075
Patrick.morris@coloradosprings.gov
6/13/2022 8:20:22 AM
911 Authority - El Paso/Teller County
6/3/2022 7:39:16 AM
NORICE GRV was approved as a private road under separate correspondence for this project.

G. West
6/3/2022 7:39:16 AM
PCD Project Manager
6/2/2022 2:15:08 PM
test 6/2/2022 2:15:08 PM
Colorado Springs Public Works
6/2/2022 11:16:55 AM
Please show and call out "on sheet C2.0 of the Plan" the proposed access along Marksheffel Road as Right Out access only.


Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
6/2/2022 11:16:55 AM
View EPC Parks Department
6/2/2022 10:57:27 AM
See Parks comments attached.

Thanks, Greg
6/2/2022 10:57:27 AM