View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
4/5/2022 2:18:58 PM |
No additional engineering comments. The traffic study will be uploaded by the project manager once accepted by the ECM administrator. reviewed by: Daniel Torres danieltorres@elpasoco.com |
4/5/2022 2:18:58 PM | |
View |
PCD Engineering Division
3/17/2022 6:01:22 PM |
Review 4 comments on the following documents have been uploaded: -Traffic Study: Comments from the previous review have not been addressed. Please address and resubmit. Please provide signatures of both the engineer and developer on the traffic study and resubmit for acceptance by the ECM administrator. Nina, A 7 day turnaround is sufficient for acceptance of the TIS by the ECM administrator. reviewed by: Daniel Torres danieltorres@elpasoco.com |
3/17/2022 6:01:22 PM |
View |
PCD Engineering Division
3/9/2022 1:50:29 PM |
Letter of Intent Redlines | 3/9/2022 1:50:29 PM |
View |
PCD Engineering Division
3/9/2022 1:49:08 PM |
Traffic Study redlines | 3/9/2022 1:49:08 PM |
PCD Engineering Division
3/9/2022 8:59:53 AM |
Review 3 comments on the following documents have been uploaded: -Traffic Study: Please fix minor comments/typo. -Letter of Intent: Please update the letter of intent so that the infrastructure capacity section matches the revised TIS. I have identified the areas that need changes. Please provide signatures of both the engineer and developer on the traffic study and resubmit for acceptance by the ECM administrator. Nina, A 7 day turnaround is sufficient for acceptance of the TIS by the ECM administrator. reviewed by: Daniel Torres danieltorres@elpasoco.com |
3/9/2022 8:59:53 AM | |
Colorado Springs Public Works
3/1/2022 11:58:03 AM |
Traffic Engineering has the following comments: 1- Traffic Engineering will require all public improvements to be built to full City Standards if this site is chosen for pre-annexation. 2- The details of the signing and striping of the future right out access along Marksheffel Road will be addressed during the construction plans review (signing and striping sheet). |
3/1/2022 11:58:03 AM | |
Colorado Springs Public Works
2/17/2022 9:58:20 AM |
Traffic Engineering has the following comments: 1- Traffic Engineering will require all public improvements to be built to full City Standards if this site is chosen for pre-annexation. 2- The details of the signing and striping of the future right out access along Marksheffel Road will be addressed during the construction plans review (signing and striping sheet). Zaker Alazzeh, P.E. Traffic Engineering Manager/Deputy City Traffic Engineer City of Colorado Springs (719) 385-5468 Zaker.Alazzeh@coloradosprings.gov |
2/17/2022 9:58:20 AM | |
View |
PCD Engineering Division
1/25/2022 10:50:36 PM |
Review 2 comments on the following documents have been uploaded: -Traffic Study Please update the letter of intent to match what is indicated on the revised TIS in regards to the access locations. reviewed by: Daniel Torres danieltorres@elpasoco.com |
1/25/2022 10:50:36 PM |
View |
PCD Engineering Division
12/7/2021 11:13:09 AM |
Review 1 comments on the following documents have been uploaded: -Traffic Study reviewed by: Daniel Torres danieltorres@elpasoco.com |
12/7/2021 11:13:09 AM |
PCD Project Manager
11/30/2021 2:04:28 PM |
I am not clear that the title commitment is picking up the recorded SIA, Pond Agreement, plat and PUDSP. Please have title commitment verify exceptions for accuracy. | 11/30/2021 2:04:28 PM | |
PCD Project Manager
11/30/2021 1:57:06 PM |
Letter of intent was very thorough -Thank you. | 11/30/2021 1:57:06 PM | |
Pikes Peak Regional Building Department
11/23/2021 12:24:30 PM |
Enumerations has no comment at this time regarding the rezone. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org W: 719-327-2953 |
11/23/2021 12:24:30 PM | |
Colorado Springs Public Works
11/23/2021 10:45:56 AM |
Engineering Development Review has no comments on this item. Joel Dagnillo, P.E. Engineer III Engineering Development Review City of Colorado Springs (719)385-5412 Joel.dagnillo@coloradosprings.gov |
11/23/2021 10:45:56 AM | |
Cherokee Metro Dist
11/22/2021 3:08:34 PM |
No Comment | 11/22/2021 3:08:34 PM | |
Colorado Springs Public Works
11/18/2021 6:22:04 AM |
Traffic Engineering has no comments on this item. Zaker Alazzeh, P.E. Traffic Engineering Manager City of Colorado Springs (719) 385-5468 Zaker.Alazzeh@coloradosprings.gov |
11/18/2021 6:22:04 AM | |
View |
Colorado Springs Airport Advisory Commission
11/17/2021 4:19:12 PM |
Attached is the land use summary with comments that was reviewed at the Airport Advisory Commission meeting with no objections. | 11/17/2021 4:19:12 PM |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/17/2021 1:33:02 PM |
I have no review comments for this project Al | 11/17/2021 1:33:02 PM | |
View |
EPC Parks Department
11/16/2021 2:47:22 PM |
See Parks review attached. Thanks, Greg |
11/16/2021 2:47:22 PM |
Mountain View Electric Association, Inc.
11/9/2021 3:51:22 PM |
Mountain View Electric Association has no objections to the current rezone plan. | 11/9/2021 3:51:22 PM | |
View |
EPC Environmental Services
11/4/2021 3:44:19 PM |
11/4/2021 3:44:19 PM | |
Central Marksheffel Metro
11/4/2021 8:52:50 AM |
This proposed re-zoning is not located within the Central Marksheffel Metropolitan District. | 11/4/2021 8:52:50 AM |