Project Review Comments
- Project Name
- FourSquare at Sterling Ranch East PUDSP
- Description
- PUDSP for 158 small lot detached single family, attached single-family lots for sale. 36.76 acres
- Location
- SE corner of the intersection of Sterling Ranch Road & Briargate Parkway
- Parcels
- 5200000552 5200000552 5233000016 5233000016
- Applicant
-
N.E.S.
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073 Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073 - EA Number
- EA21117
- File Number
- PUDSP227
- Project Manager
- Kari Parsons
- Status
- Closed
- Created
- 7/6/2021 3:56:26 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
4/28/2023 8:46:10 PM |
Item is scheduled for hearing. | 4/28/2023 8:46:10 PM | |
View |
EPC Health Department
4/28/2023 12:14:50 PM |
4/28/2023 12:14:50 PM | |
View |
PCD Engineering Division
4/26/2023 5:00:34 PM |
See comment letter (link at left) for reference. The Engineering documents have been approved/accepted and will be uploaded to EDARP. -- Jeff Rice - 719-520-7877 |
4/26/2023 5:00:34 PM |
View |
County Attorney - Water
4/26/2023 9:21:45 AM |
4/26/2023 9:21:45 AM | |
County Attorney - Water
4/18/2023 2:12:18 PM |
The commitment letter from the water service provider is not for this development. Please correct and resubmit. | 4/18/2023 2:12:18 PM | |
View |
Colorado Division of Water Resources
4/5/2023 11:27:53 AM |
The water supply demand and source does not appear to have changed. Please refer to our comments dated December 19, 2022 (attached). | 4/5/2023 11:27:53 AM |
View |
PCD Project Manager
4/5/2023 10:22:37 AM |
PUD comment review 3 minor | 4/5/2023 10:22:37 AM |
View |
PCD Engineering Division
4/5/2023 10:13:54 AM |
(PDR redlined pages) | 4/5/2023 10:13:54 AM |
View |
PCD Engineering Division
4/5/2023 10:13:26 AM |
(TIS redlines summary) | 4/5/2023 10:13:26 AM |
View |
PCD Engineering Division
4/5/2023 10:13:02 AM |
(TIS redlines) | 4/5/2023 10:13:02 AM |
View |
PCD Engineering Division
4/5/2023 10:21:59 AM |
See comment letter (link at left) for reference. The following items need to be revised and resubmitted: - PUDSP Plan - Preliminary Drainage report - TIS - Comment memo response -- Jeff Rice - 719-520-7877 |
4/5/2023 10:21:59 AM |
Colorado Geological Survey
3/31/2023 1:59:39 PM |
CGS acknowledges General Note 11 on the PUD Development Plan stating, “No basements are permitted in the Foursquare at Sterling Ranch Development.” CGS has no further comments. Reviewed on 3/31/2023 by Amy Crandall, Engineering Geologist (acrandall@mines.edu, 303-384-2634) |
3/31/2023 1:59:39 PM | |
Pikes Peak Regional Building Department
3/29/2023 9:49:18 AM |
1. The application name is FourSquare at Sterling Ranch East. The title block says FourSquare at Sterling Ranch. Should EAST be added to the title of the 19 pages of the plan. Enumerations does not require this to move forward. 2. The street names on sheet 1 of 19 were not changed, should they be? Enumerations does not require this to move forward. 3. Please contact Enumerations for addressing once the PUD Development plan is approved. No further comments. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
3/29/2023 9:49:18 AM | |
View |
EPC Parks Department
3/27/2023 1:59:09 PM |
El Paso County Parks and Community Services Final Comments, 2nd Submittal - Please See Attached Documents (PAB Endorsed 08/10/2022) | 3/27/2023 1:59:09 PM |
EPC Stormwater Review
3/14/2023 6:55:24 PM |
Review 4: EPC DPW Stormwater comments have been resolved on the following documents: - PBMP Applicability Form EPC DPW Stormwater has no further comments. Planner: no re-review necessary. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
3/14/2023 6:55:24 PM | |
Academy SD 20 Building Fund
3/13/2023 8:28:39 AM |
Academy District 20 is in receipt of File# PUDSP227 for approval of the FourSquare at Sterling Ranch East PUDSP. Academy District 20 is requesting land dedication in lieu of fees per the existing El Paso County Code for all residential development within the Sterling Ranch Sketch Plan located within District boundaries as previously requested for all residential development within Sterling Ranch. The District is requesting that fees NOT BE collected as per previous responses regarding Sterling Ranch. The District is aware that Classic Homes is assuming the development of Sterling Ranch and that 2 school sites will be reserved within the Revised Sketch Plan. The District has been in discussions with Classic Homes regarding this filing; however, an agreement regarding the school sites between Classic Homes, El Paso County, and District 20 has not been finalized for the District 20 Board of Education to consider. Any agreement that District 20 would enter into must first be approved by the Board of Education. The District intends to utilize the land credits for ALL of Sterling Ranch in the future to pay for the sites being proposed by Classic Homes. If you need additional information or clarification, please contact me. Don Smith Planning Consultant |
3/13/2023 8:28:39 AM | |
View |
PCD Project Manager
1/26/2023 1:22:11 PM |
Subdivision summary sheet comments- please make sure the plat and PUDSP version match; please verify PUD table matches also. Verify LOI info matches as it relayed to 10 percent required openspace, and of the 10%, 25% usable open space required for a PUD |
1/26/2023 1:22:11 PM |
View |
PCD Project Manager
1/26/2023 12:48:22 PM |
PUDSP Plan redline comments | 1/26/2023 12:48:22 PM |
View |
PCD Project Manager
1/26/2023 1:24:15 PM |
Letter of intent comments; verify acreages on plat and PUD subdivision summary sheets match and verify open space calculations are accurate please. | 1/26/2023 1:24:15 PM |
View |
PCD Engineering Division
1/25/2023 3:45:13 PM |
(PDR redlines summary) | 1/25/2023 3:45:13 PM |
View |
PCD Engineering Division
1/25/2023 3:44:34 PM |
(PDR redlines) | 1/25/2023 3:44:34 PM |
View |
PCD Engineering Division
1/25/2023 3:42:05 PM |
(TIS redlines - PCD and FHU) | 1/25/2023 3:42:05 PM |
View |
PCD Engineering Division
1/25/2023 3:41:03 PM |
See comment letter (link at left) for reference. The following items need to be revised and resubmitted: - Letter of Intent - PUDSP Plan - Preliminary Drainage report - TIS (in coordination with SKP Master TIS and SP224 TIS) - Comment memo response -- Jeff Rice - 719-520-7877 |
1/25/2023 3:41:03 PM |
View |
EPC Stormwater Review
1/4/2023 6:42:38 PM |
PBMP Applicability Form | 1/4/2023 6:42:38 PM |
EPC Stormwater Review
1/4/2023 6:42:16 PM |
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document: - PBMP Applicability Form Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
1/4/2023 6:42:16 PM | |
View |
Traffic Review Consultant
12/21/2022 5:24:08 PM |
FHU has reviewed the traffic technical memorandum. Our comments are included in the attached memo and have also been uploaded to the related Bluebeam session. | 12/21/2022 5:24:08 PM |
View |
Colorado Division of Water Resources
12/19/2022 9:20:50 AM |
12/19/2022 9:20:50 AM | |
Colorado Geological Survey
12/15/2022 12:58:49 PM |
Entech Engineering’s revised September 15, 2022 soil and geology report makes appropriate preliminary recommendations for mitigating the site’s hazards. The Grading and Erosion Control Plan (Classic Consulting, 3/8/2022) shows that the area of potentially unstable slopes will be regraded, and most of the site will be filled. Provided Entech’s recommendations are strictly adhered to, CGS has no objection to approval. We offer the following comments and recommendations. 1. Entech states (page 4), “The proposed housing will be constructed with crawlspaces; no basements are proposed.” CGS agrees with Entech (page 11), “A minimum separation of 3 feet between foundation components and groundwater levels are recommended.” CGS recommends adding a note to the plans stating that no basements are permitted in the Foursquare at Sterling Ranch East development, similar to other Sterling Ranch developments. Reviewed on 12/15/2022 by Amy Crandall, Engineering Geologist (acrandall@mines.edu, 303-384-2634) |
12/15/2022 12:58:49 PM | |
Pikes Peak Regional Building Department
12/7/2022 8:11:59 AM |
1. This filing shows Catalina Drive and the extension to the West for Sterling Ranch East Fil No 1 has this street labeled as Catalina Foothills Drive. Since this is a logical continuations the street name needs to be the same. 2. STANDARD PUD COMMENTS: PLEASE READ- a. For assignment of addressing for lots and tracts, place addressing marker (xxx) where they are intended to be utilized. Addressing marker for lots should be front door. b. Provide a 100 scale copy or larger of the entire APPROVED development plan (d.p.) to this department so that addressing can be assigned. Once received, the development plan will be placed on a list to be addressed. Development plans that are not yet approved may be addressed, however additional plan review fees will accrue if changes are made to the D.P. after initial addressing. c. An email from Bootsy Jones bootsy.jones@coloradosprings.gov , the Public Safety Street Naming Administrator with the City of Colorado Springs, reserving the street names is required to be emailed to the Enumerations department. Amy Vanderbeek Amy@pprbd.org d. If underground service is needed prior to plat, submit a Utilities Addressing Plan (UAP), to Colorado Springs Utilities via the related link at https://www.csu.org/Pages/mapping.aspx For more information contact: Karen Carlton KCARLTON@CSU.ORG 3. Is this area within CSU’s area for gas? See standard comments for submitting a Utilities Addressing plan. |
12/7/2022 8:11:59 AM | |
EPC Stormwater Review
12/6/2022 6:13:51 PM |
Review 2: EPC Stormwater comments have been resolved on the following documents: - Drainage Report Please provide the following document upon resubmittal as previously requested with Review 1 comment. Ask the planner to send an upload request for it. - PBMP Applicability Form Reviewed by: Glenn Reese, P.E. Stormwater Engineer II GlennReese@elpasoco.com |
12/6/2022 6:13:51 PM | |
911 Authority - El Paso/Teller County
12/1/2022 9:04:47 AM |
Comments for E911 as follows: Multiple adjustments needed for suffixes. New streetname needed to replace Catalina Dr. Idaho Falls Dr - Available Boulder City Pl – Available – Suffix should be St or Dr Estes Park Rd – Available – Suffix should be Court, Place, Circle, Way, Terrace, Lane, Loop, Trail, or Path Salt Lake Dr – Available – Suffix should be Court, Place, Circle, Way, Terrace, Lane, Loop, Trail, or Path Pagosa Springs Dr - Available – Suffix should be Court, Place, Circle, Way, Terrace, Lane, Loop, Trail, or Path Rio Rancho Rd - Available – Suffix should be Court, Place, Circle, Way, Terrace, Lane, Loop, Trail, or Path Catalina Dr – Not available - Existing road name Thank you Justin |
12/1/2022 9:04:47 AM | |
View |
Parks Advisory Board
8/11/2022 2:19:01 PM |
El Paso County Community Services / Parks Final Comments - Please See Attached Documents (PAB Endorsed 08/10/2022) | 8/11/2022 2:19:01 PM |
View |
EPC Health Department
8/3/2022 9:46:19 PM |
8/3/2022 9:46:19 PM | |
Falcon Fire Protection District
8/2/2022 7:52:58 AM |
not in the Falcon Fire District | 8/2/2022 7:52:58 AM | |
View |
EPC Parks Department
7/21/2022 4:04:06 PM |
El Paso County Community Services / Parks Preliminary Comments - Please See Attached Documents (To be presented to PAB for endorsement on 08/10/2022) | 7/21/2022 4:04:06 PM |
View |
PCD Engineering Division
7/20/2022 8:51:01 AM |
(Soils/Geo redlines summary) | 7/20/2022 8:51:01 AM |
View |
PCD Engineering Division
7/20/2022 8:50:21 AM |
(Soils/Geo redlines) | 7/20/2022 8:50:21 AM |
View |
PCD Engineering Division
7/20/2022 8:48:56 AM |
(PDR redlines summary) | 7/20/2022 8:48:56 AM |
View |
PCD Engineering Division
7/20/2022 8:47:57 AM |
(PDR redlines) | 7/20/2022 8:47:57 AM |
View |
PCD Engineering Division
7/20/2022 8:46:59 AM |
(PUDSP Plan redlines summary) | 7/20/2022 8:46:59 AM |
View |
PCD Engineering Division
7/20/2022 8:46:04 AM |
(PUDSP Plan redlines) | 7/20/2022 8:46:04 AM |
View |
PCD Engineering Division
7/20/2022 8:44:52 AM |
(TIS redlines) | 7/20/2022 8:44:52 AM |
View |
PCD Engineering Division
7/20/2022 8:42:30 AM |
(LOI redlines) | 7/20/2022 8:42:30 AM |
View |
El Paso County Conservation Dist
7/19/2022 8:38:08 AM |
Native grass seed mix information submitted as .jpg | 7/19/2022 8:38:08 AM |
View |
El Paso County Conservation Dist
7/19/2022 8:37:33 AM |
Brief comments included within .docx | 7/19/2022 8:37:33 AM |
PCD Project Manager
7/19/2022 7:43:17 AM |
Please review the Section 4.2.6 and add a discussion to the LOI on how the projects meets the purpose of the PUD district; the PC has asked for explanation of how PUDs are meeting the purposes state in the Code. 4.2.6. PUD, Planned Unit Development District (A)Purpose. The Planned Unit Development (PUD) district is a versatile zoning mechanism to encourage innovative and creative design and to facilitate a mix of uses including residential, business, commercial, and industrial, recreation, open space, and other selected secondary uses. This zoning district is established in accordance with C.R.S. §§ 24-67-101, et seq., to accomplish the following objectives: • To further the public health, safety and general welfare within El Paso County; • To permit adjustment to changing public and private needs and to foster the ability to provide development patterns which are more compatible with and effective in meeting such needs; • To improve the design, character and quality of new development with flexibility by varying lot size, building heights, setback controls and other site development requirements; • To encourage innovations in residential, commercial, and industrial development and renewal so that the growing demands of the population may be met by greater variety in type, design, and layout of buildings including mixed use and traditional neighborhood design and by the conservation and more efficient use of open space ancillary to said buildings; • To encourage more efficient use of land services reflecting changes in the technologies and economies of land development; • To provide housing of all types and designs to be located in proximity to employment and activity centers such as shopping, recreational, and community centers, healthcare facilities, and public transit; • To achieve development economies to minimize impacts on existing infrastructure and to encourage the most efficient use of public infrastructure while limiting the costs of providing services and to reduce the burden on existing streets and utilities by more efficient development; • To promote layout, design and construction of development that is sensitive to the natural land form and environmental conditions of the immediate and surrounding area, including scenic vistas, natural features and environmental resources; • To ensure that provision is made for beneficial open space, to provide for active, usable open spaces, and to preserve open areas; • To encourage integrated planning systems to achieve the objectives of and to otherwise implement the stated purpose and intent of this Code and the Master Plan; • To create an integrated and fixed set of land use controls which allow multiple and mixed uses in 1 coordinated development; and • To establish a basis for vested property rights for multi-year projects. |
7/19/2022 7:43:17 AM | |
PCD Project Manager
7/18/2022 11:12:26 AM |
CSU commitment letter is only for one parcel not all three? | 7/18/2022 11:12:26 AM | |
PCD Project Manager
7/18/2022 11:18:03 AM |
Please add the title of this file project name to the Natural Features/ Landform Report and the Noxious Weed Management Plan- it appears the report is meant to cover multiple projects not just the preliminary plan file no. SP 224 | 7/18/2022 11:18:03 AM | |
PCD Project Manager
7/18/2022 11:13:31 AM |
Subdivision Summary sheet has incorrect project name- please be specific to this FourSquare at Sterling Ranch PUDSP | 7/18/2022 11:13:31 AM | |
PCD Project Manager
7/18/2022 10:48:37 AM |
Water summary form has incorrect file name- specify for each project | 7/18/2022 10:48:37 AM | |
PCD Project Manager
7/18/2022 10:47:42 AM |
Wastewater and Water resources reports should have a project name on it matching the PUDSP. I am not sure where the specifics are for this project are in the report it seems like its all under a larger sterling ranch east prelim plan and not project specific, please be specific for each project. Perhaps add a clarifying page matching the actual PUDSP for each file and the specific quantities. | 7/18/2022 10:47:42 AM | |
View |
PCD Engineering Division
7/20/2022 8:39:19 AM |
See comment letter (link at left) for reference. The following items need to be revised and resubmitted: - Letter of Intent - PUDSP Plan - Preliminary Drainage report - TIS (in coordination with SKP Master TIS) - Soils and Geology report - Comment memo response -- Jeff Rice - 719-520-7877 |
7/20/2022 8:39:19 AM |
PCD Project Manager
7/14/2022 12:02:05 PM |
Please use link below look at the PUD , the Preliminary plan and landscape plan checklists; add missing items to plan set please. https://planningdevelopment.elpasoco.com/planning-development-forms/#1643393391537-a0dac52d-1b3b |
7/14/2022 12:02:05 PM | |
PCD Project Manager
7/18/2022 11:11:42 AM |
PUDSP title has incorrect name and not on all sheets Please add exactly this as checklist required. Cover Sheet The following wording shall be placed verbatim beginning in the upper left hand area of the map: A statement establishing the purpose and intent of the PUD zoning district. (please do this) Authority This PUD is authorized by Chapter 4 of the El Paso County Land Development Code, adopted pursuant to the Colorado Planned Unit Development Act of 1972, as amended. Applicability The provisions of this PUD shall run with the land. The landowners, their successors, heirs, or assigns shall be bound by this Development Plan, as amended and approved by the Planning and Community Development Department Director or Board of County Commissioners. Adoption The adoption of this development plan shall evidence the findings and decisions of the El Paso County Board of County Commissioners that this Development Plan for (name of PUD) is in general conformity with the El Paso County Master Plan, El Paso County Policy Plan and applicable Small Area Plan(s); is authorized under the provision of the El Paso County Land Development Code; and that the El Paso County Land Development Code and this development plan complies with the Colorado Planned Unit Development Act of 1972, as amended. The provisions of this Development Plan shall prevail and govern the development of (name of PUD), provided, however, that where the provisions of this Development Plan do not address a particular subject, the relevant provisions of the El Paso County Land Development Code, as amended and in effect at the time of the PUD plan approval (or owner acknowledge the PUD changes with the Code), or any other applicable resolutions or regulations of El Paso County, shall be applicable. To further the mutual interest of the residents, occupants, and owners of the PUD and of the public in the preservation of the integrity of this development plan, the provisions of this plan relating to the use of land and the location of common open space shall run in favor of El Paso County and shall be enforceable at law or in equity by the County without limitation on any power or regulation otherwise granted by law. Where there is more than one provision within the development plan that covers the same subject matter, the provision which is most restrictive or imposes higher standards or requirements shall govern. |
7/18/2022 11:11:42 AM | |
PCD Project Manager
7/18/2022 11:06:00 AM |
Noise Study not uploaded- Is there a noise study for this area? The document uploaded is a paragraph committing to a concrete wall along Briargate, document is labeled for the Stelling Ranch East Prelim Plan not the FourSquare PUDSP . If your are proposing to construct the wall automatically without a study because you anticipate the need ok. What were the results of the study for Sterling Ranch Road in this area? | 7/18/2022 11:06:00 AM | |
View |
Traffic Review Consultant
7/13/2022 2:28:13 PM |
The trip generation letter needs to be resubmitted. The revised letter needs to reflect an approved sketch plan amendment traffic study. Additional traffic comments are included in the attached memorandum and in the Bluebeam session for this submittal. | 7/13/2022 2:28:13 PM |
PCD Project Manager
7/18/2022 10:48:59 AM |
Commitment letter -The name is misleading this is not for the Sterling Ranch east prelim plan it is for the Foursquare at Sterling Ranch PUDSP. Please verify the water quantity and wastewater is for the Foursquare at Sterling Ranch and update project name in letter for the Foursquare at Sterling Ranch PUDSP. | 7/18/2022 10:48:59 AM | |
PCD Project Manager
7/13/2022 10:40:29 AM |
Please supply the adjacent property notifications (green slips). It looks like some lots in Homestead Fil 1 need to be notified. | 7/13/2022 10:40:29 AM | |
Colorado Parks and Wildlife
7/12/2022 3:38:31 PM |
Colorado Parks and Wildlife (CPW) has reviewed the plans for FourSquare at Sterling Ranch East PUDSP. CPW has previously commented on the entirety of the Sterling Ranch project before. CPW would like to refer to these comments in regards to this filing. CPW appreciates being given the opportunity to comment. Please Feel free to contact District Wildlife Manager Aaron Berscheid at 719-439-9601 or aaron.berscheid@state.co.us should you have any questions or require additional information. |
7/12/2022 3:38:31 PM | |
View |
Mountain View Electric Association, Inc.
7/12/2022 10:38:53 AM |
See attached comments | 7/12/2022 10:38:53 AM |
EPC Stormwater Review
7/12/2022 7:30:04 AM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report...(to be uploaded by PM with PCD comments) Please provide the following document upon resubmittal: - PBMP Applicability Form Reviewed by: Glenn Reese, P.E. Stormwater Engineer II GlennReese@elpasoco.com |
7/12/2022 7:30:04 AM | |
Pikes Peak Regional Building Department
7/11/2022 2:30:58 PM |
1. STANDARD DEVELOPMENT/P.U.D PLAN COMMENTS; a. For assignment of addressing for lots and tracts, place addressing marker (xxx) where they are intended to be utilized. Addressing marker for lots should be front door. b. Rear Loaded homes will have unique address assignment and placement. A plat note will be required showing address placement. c. Provide a 100 scale copy or larger of the entire APPROVED development plan (d.p.) to this department so that addressing can be assigned. Once received, the development plan will be placed on a list to be addressed. Development plans that are not yet approved may be addressed, however additional plan review fees will accrue if changes are made to the D.P. after initial addressing. d. One street name is pending and new suffixes to the majority of the street names need to be amended, per El Paso-Teller 9-1-1 Authority. An emailed to the Enumerations department is required . Amy Vanderbeek Amy@pprbd.org; e. If underground service is needed prior to plat, submit a Utilities Addressing Plan (UAP), to Colorado Springs Utilities via the related link at https://www.csu.org/Pages/mapping.aspx For more information contact: Karen Carlton KCARLTON@CSU.ORG. (If there is gas service from CSU). No further comments at this time. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
7/11/2022 2:30:58 PM | |
Colorado Geological Survey
7/11/2022 1:12:05 PM |
The available referral documents include a Soil, Geology, and Geologic Hazard Study, Foursquare at Sterling Ranch East (Entech Engineering, Job No. 220572, April 14, 2022), Preliminary Plan (Classic Consulting, March 8, 2022), Letter of Intent (N.E.S., Inc., June 2022), Grading and Erosion Control Plans (Classic Consulting, March 8, 2022), and other documents. As noted on page 12 of Entech’s Soil, Geology, and Geologic Hazard Study (Entech Engineering, Inc., April 14, 2022), the hazards identified on this site include expansive soils, erosion, hydrocompaction, potentially unstable slopes, and potential shallow groundwater areas. Additionally, Entech’s Engineering Geology/Geology Map (figure 7) separates the site into the following: potentially unstable slope (pu) and hydrocompaction (h). Entech makes appropriate preliminary recommendations for mitigating the site’s hazards. We offer the following comments and recommendations. 1. General Note 10 of the preliminary plan references a Soil, Geology, and Geologic Hazard Study by Entech dated April 20, 2020. This statement should be updated to reference Entech’s current study. 2. In the test borings drilled for Entech’s April 14, 2022 study, groundwater was encountered at 7 and 13 feet below grade during drilling, and Entech observed standing water to the south of the site at the northwest corner of future Briargate Parkway and Sterling Ranch Road. Entech states (page 4), “The proposed housing will be constructed with crawlspaces; no basements are proposed.” Entech makes appropriate preliminary recommendations for mitigating the site’s hazards. Due to the very shallow groundwater conditions at the Sterling Ranch development, basement levels should not be allowed. CGS recommends adding a note to the plans stating that no basements are permitted in the Foursquare at Sterling Ranch East development. 3. Page 11 of Entech’s revised report states, “In areas where high subsurface moisture conditions are anticipated periodically, subsurface perimeter drains are recommended to help prevent the intrusion of water into areas below grade.” As individual underdrains are typically tied to the storm sewer system or underdrain system that gravity discharges to a daylight outfall, CGS recommends that underdrain systems are designed early in the design stage and noted on the plans. No drawings were included with the current referral documents showing an underdrain system. An underdrain system should be allowed ONLY if it can gravity discharge to a daylight outfall or is connected to an existing underdrain system that gravity discharges to a daylight outfall. 4. Entech identified areas containing potentially unstable slopes but states on page 11, “These areas will likely be regraded during the site development.” Once final grading is complete, Entech should review the grades to verify these areas will be mitigated, otherwise, appropriate setbacks from unstable slopes should be designated and included in the project plans. Reviewed on 7.11.2022 by Amy Crandall, Engineering Geologist (acrandall@mines.edu, 303-384-2634) |
7/11/2022 1:12:05 PM | |
Academy SD 20 Building Fund
7/11/2022 9:37:35 AM |
Academy District 20 is in receipt of File# PUDSP227. Academy District 20 is requesting land dedication in lieu of fees per the existing El Paso County Code for all residential development within the Sterling Ranch Sketch Plan located within District boundaries as previously requested for all residential development within Sterling Ranch. The District is requesting that fees NOT BE collected as per previous responses regarding Sterling Ranch. The District is aware that Classic Homes is assuming the development of Sterling Ranch and that 2 school sites will be reserved within the Revised Sketch Plan. The District is waiting to receive information regarding an agreement between the county and Classic Homes which will clarify the Districts' request for land dedication for all of Sterling Ranch. The District intends to utilize the land credits for ALL of Sterling Ranch in the future to pay for the sites being proposed by Classic Homes. If you need additional information or clarification, please contact me. Don Smith Planning Consultant |
7/11/2022 9:37:35 AM | |
Colorado Springs Public Works
7/8/2022 10:42:42 AM |
Engineering Development Review will require all public improvements to be built to full City Standards if this is chosen for pre-annexation per the IGA. Joel Dagnillo, P.E. Engineer III Engineering Development Review City of Colorado Springs (719)385-5412 Joel.dagnillo@coloradosprings.gov |
7/8/2022 10:42:42 AM | |
Black Forest Fire Protection District
6/29/2022 7:56:58 AM |
Black Forest Fire Rescue/JMR Comment at this time is that the development meets El Paso County standards for roads, Fire Access and fire hydrants meet county code for spacing and distance to a residential structure (500 feet) at not more than 660 feet travel distance between hydrants. |
6/29/2022 7:56:58 AM | |
Colorado Springs Public Works
6/27/2022 12:42:50 PM |
Traffic Engineering has no comments on this item. Zaker Alazzeh, P.E. Traffic Engineering Manager/Deputy City Traffic Engineer City of Colorado Springs (719) 385-5468 Zaker.Alazzeh@coloradosprings.gov |
6/27/2022 12:42:50 PM | |
911 Authority - El Paso/Teller County
6/27/2022 9:30:29 AM |
Comments for E911 as follows: Idaho Falls Dr - Available Boulder City Pl – Available – Suffix should be St or Dr Estes Park Rd – Available – Suffix should be Court, Place, Circle, Way, Terrace, Lane, Loop, Trail, or Path Salt Lake Dr – Available – Suffix should be Court, Place, Circle, Way, Terrace, Lane, Loop, Trail, or Path Pagosa Springs Dr - Available – Suffix should be Court, Place, Circle, Way, Terrace, Lane, Loop, Trail, or Path Rio Rancho Rd - Available – Suffix should be Court, Place, Circle, Way, Terrace, Lane, Loop, Trail, or Path Catalina Foothills Rd – Not acceptable - Exceeds maximum characters (14) – suffix should be St or Dr. Thank you Justin |
6/27/2022 9:30:29 AM | |
View |
EPC Environmental Services
6/24/2022 12:26:31 PM |
6/24/2022 12:26:31 PM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/23/2022 4:09:27 PM |
For any inquiries about Springs Utilities' gas services, please contact 719-668-4985. No comments. Approval can be recommended. ____________________________________________________ Corey Masoumi | Engineering Support Coordinator Utilities Development Services | Colorado Springs Utilities cmasoumi@csu.org | www.csu.org |
6/23/2022 4:09:27 PM | |
County Attorney - Development Review
6/23/2022 3:55:50 PM |
No comments from County Attorney - Development Review at this time. | 6/23/2022 3:55:50 PM | |
County Attorney - Water
6/22/2022 4:03:48 PM |
County Attorney's Office will provide review of water sufficiency following receipt of findings from the Colorado Division of Water Resources. Thank you. | 6/22/2022 4:03:48 PM |