Project Review Comments
- Project Name
- Wyoming Estates Preliminary Plan
- Description
- Filing 2 - replat of 21 acre lot into additional smaller lots; also to include previous Wyoming Estates in the plan
- Location
- Parcels
- 4333000003 4333000003 4333003003 4333003003 4333004001 4333004001 4333004002 4333004002 4333004003 4333004003
- Applicant
-
Home Run Restorations Inc.
Shawn Shaffer ( hrrestorations@gmail.com )
(719) 649-7241 Shawn Shaffer ( hrrestorations@gmail.com )
(719) 649-7241 - EA Number
- EA21112
- File Number
- SP237
- Project Manager
- Ryan Howser
- Status
- Closed
- Created
- 6/24/2021 4:13:06 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
6/18/2024 2:04:36 PM |
Planning Division has no comments at this time. | 6/18/2024 2:04:36 PM | |
PCD Project Manager
5/16/2024 10:54:37 AM |
Please correct the portion of Teleo Court that states "private right-of-way" - it should say "public right-of-way." | 5/16/2024 10:54:37 AM | |
PCD Engineering Division
4/17/2024 10:41:16 AM |
All comments have been resolved. The project manager will upload any approved documents. Reviewed By: Lupe Packman lupepackman@elpasoco.com |
4/17/2024 10:41:16 AM | |
PCD Project Manager
4/16/2024 12:03:19 PM |
Planning has no further comments at this time. | 4/16/2024 12:03:19 PM | |
PCD Engineering Division
4/16/2024 10:27:57 AM |
Comments have been resolved. Please resubmit signed drainage report with signature across P.E. seal per DORA bylaws. Note to Planner: set review cycle to 5 days. Reviewed By: Lupe Packman lupepackman@elpasoco.com |
4/16/2024 10:27:57 AM | |
View |
PCD Engineering Division
4/11/2024 10:49:19 PM |
Minor comment on the drainage report. See attached redlines. reviewed by: Daniel Torres danieltorres@elpasoco.com |
4/11/2024 10:49:19 PM |
View |
PCD Project Manager
4/11/2024 10:41:51 AM |
Review 4: PCD Planning Division has minor comments on the preliminary plan drawing. This will not impact the hearing schedule, and this project will be scheduled for Planning Commission hearing of May 16th, 2024, and June 13th, 2024. | 4/11/2024 10:41:51 AM |
PCD Project Manager
4/5/2024 11:04:05 AM |
Please update the legal description document that was submitted to reflect the legal description shown on the drawing. Please also indicate the total acreage on the legal description. | 4/5/2024 11:04:05 AM | |
View |
County Attorney - Water
3/18/2024 11:08:45 AM |
Please see attached Water Supply Review and Recommendations. Thanks! | 3/18/2024 11:08:45 AM |
PCD Engineering Division
3/14/2024 9:12:06 AM |
Drainage report comments are unresolved. There will be an increase in impervious coverage with this plat and drainage fees will need to be calculated for that. Please see appendix L in the ECM and calculated the drainage fees for the increase in fees for Livestock Company. Reviewed By: Lupe Packman lupepackman@elpasoco.com |
3/14/2024 9:12:06 AM | |
View |
PCD Project Manager
3/13/2024 10:10:33 AM |
V3: Preliminary Plan comments | 3/13/2024 10:10:33 AM |
View |
PCD Project Manager
3/13/2024 10:10:20 AM |
V3: Letter of Intent comments | 3/13/2024 10:10:20 AM |
PCD Project Manager
3/13/2024 10:09:51 AM |
Review 3: PCD Planning Division comments have been provided (in green) on the following uploaded documents: - Letter of Intent - Preliminary Plan |
3/13/2024 10:09:51 AM | |
EPC Stormwater Review
3/11/2024 5:29:07 PM |
Review 3: Since there is not any proposed disturbance planned with SP237 or SF2322, EPC DPW Stormwater does not have comments on any of the uploaded documents. Note that prior to each home being built, a BESQCP will be required for each. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
3/11/2024 5:29:07 PM | |
View |
PCD Project Manager
12/12/2023 4:51:49 PM |
Review 2: Soils & Geology Report comments | 12/12/2023 4:51:49 PM |
View |
PCD Project Manager
12/12/2023 4:51:32 PM |
Review 2: Preliminary Plan comments | 12/12/2023 4:51:32 PM |
View |
PCD Project Manager
12/12/2023 4:51:15 PM |
Review 2: Letter of Intent comments | 12/12/2023 4:51:15 PM |
View |
PCD Project Manager
12/12/2023 4:50:58 PM |
Review 2: Fire Protection Report comments | 12/12/2023 4:50:58 PM |
PCD Project Manager
12/12/2023 4:49:23 PM |
Review 2: PCD Planning Division comments have been provided (in green) on the following uploaded documents: - Fire Protection Report - Letter of Intent - Preliminary Plan - Soils & Geology Report |
12/12/2023 4:49:23 PM | |
EPC Stormwater Review
12/12/2023 2:33:04 PM |
Review 2: Comments provided on the drainage report from Review 1 are unresolved. Revise to address all comments provided in the previous review and submit in the next submittal. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
12/12/2023 2:33:04 PM | |
PCD Engineering Division
12/11/2023 9:24:28 AM |
Comments provided on the drainage report and preliminary plan from review 1 are unresolved. Revise to address all comments provided in the previous review and submit in the next submittal. Reviewed By: Lupe Packman lupepackman@elpasoco.com |
12/11/2023 9:24:28 AM | |
PCD Project Manager
12/8/2023 3:51:59 PM |
Health Department has returned a finding of insufficiency with regards to water quality. Please revise the water resources report to include the appropriate water quality testing information. | 12/8/2023 3:51:59 PM | |
View |
EPC Health Department
12/8/2023 3:45:19 PM |
12/8/2023 3:45:19 PM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/30/2023 9:39:33 AM |
CSU UDS does not have any comments MAR |
11/30/2023 9:39:33 AM | |
911 Authority - El Paso/Teller County
11/30/2023 9:03:06 AM |
Logical extension of Teleo Ct is acceptable. No action for E911 on this submittal. Thank you. Justin. |
11/30/2023 9:03:06 AM | |
County Attorney - Water
11/29/2023 3:32:21 PM |
1. Please correctly identify the project as the Wyoming Estates Preliminary Plan on all water documentation. 2. Please correct the WSIS to address the 6 lots of the preliminary plan as a whole, without breaking it down into filings. Please insert the proposed amount of acreage to be irrigated. 3. The Water Resources Report contains no indication of who prepared it. As previously noted, the Water Resources Report must be prepared by a professional identified in LDC § 8.4.7 (B)(1)(c). |
11/29/2023 3:32:21 PM | |
View |
El Paso County Conservation Dist
11/14/2023 9:31:22 AM |
11/14/2023 9:31:22 AM | |
County Attorney - Water
11/9/2023 3:44:10 PM |
The following must be identified before the County Attorney's Office review for sufficiency: 1. Please correctly identify the project name on all documents and whether this is a preliminary plan or final 2. Please identify if the review is for 4 lots or 6 lots and make sure all required documentation is consistent 3. On the Water Supply Information Summary, please identify household use in acre feet, and include any demand for stock watering and irrigation consistent with other documentation 4. The Water Resources Report needs to meet the standards within LDC 8.4.7(B)(1)(c). Also include information on the calculation of water demand consistent with the Water Supply Information Summary according to LDC 8.4.7(B)(3)(b) |
11/9/2023 3:44:10 PM | |
Upper Black Squirrel Creek GWMD
11/8/2023 2:14:23 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. Thank you. | 11/8/2023 2:14:23 PM | |
View |
Colorado Parks and Wildlife
10/30/2023 9:58:26 AM |
10/30/2023 9:58:26 AM | |
View |
EPC Stormwater Review
10/28/2023 12:39:00 PM |
Drainage Letter_v1 | 10/28/2023 12:39:00 PM |
EPC Stormwater Review
10/28/2023 12:38:26 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Letter......(uploaded with PCD comments) Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
10/28/2023 12:38:26 PM | |
View |
Mountain View Electric Association, Inc.
10/26/2023 3:09:33 PM |
See attached comments | 10/26/2023 3:09:33 PM |
County Attorney - Development Review
10/25/2023 10:27:07 PM |
No comments from County Attorney - Development Review. | 10/25/2023 10:27:07 PM | |
Colorado Geological Survey
10/25/2023 2:01:12 PM |
Our previous concerns have been addressed. Therefore, CGS has no objection to approving the proposed four-lot minor subdivision (SP237 and SF2322, located at 38.8768, -104.5556). Submitted 10/25/2023 by Jonathan R. Lovekin, Senior Engineering Geologist, Colorado Geological Survey jlovekin@mines.edu |
10/25/2023 2:01:12 PM | |
View |
PCD Project Manager
10/25/2023 12:37:50 PM |
V1 Water Supply Information Summary | 10/25/2023 12:37:50 PM |
View |
PCD Project Manager
10/25/2023 12:37:30 PM |
V1 Water Resources Report | 10/25/2023 12:37:30 PM |
View |
PCD Project Manager
10/25/2023 12:37:12 PM |
V1 Letter of Intent | 10/25/2023 12:37:12 PM |
View |
PCD Project Manager
10/25/2023 12:36:20 PM |
V1 Fire Protection Report | 10/25/2023 12:36:20 PM |
View |
PCD Project Manager
10/25/2023 12:36:01 PM |
V1 Electric Provider Commitment Letter | 10/25/2023 12:36:01 PM |
View |
PCD Project Manager
10/25/2023 12:35:44 PM |
V1 Combined OWTS Report and Soils & Geology Report | 10/25/2023 12:35:44 PM |
View |
PCD Project Manager
10/25/2023 12:35:22 PM |
V1 Application | 10/25/2023 12:35:22 PM |
View |
PCD Project Manager
10/25/2023 12:34:47 PM |
V1 Preliminary Plan (includes Planning and Engineering comments) | 10/25/2023 12:34:47 PM |
PCD Project Manager
10/25/2023 3:12:10 PM |
Review 1: PCD Planning Division comments have been provided (in green) on the following uploaded documents: - Preliminary Plan - Application - OWTS / Soils & Geology Report - Electric Provider Commitment Letter - Fire Protection Report - Letter of Intent - Water Resources Report - Water Supply Information Summary EPC Stormwater will upload the following documents with Engineering (in blue) comments: - Drainage Report |
10/25/2023 3:12:10 PM | |
PCD Engineering Division
10/25/2023 11:25:10 AM |
Review 1 comments on the following documents will be uploaded by the project manager. -Drainage report -Prelim plan Reviewed By: Lupe Packman lupepackman@elpasoco.com Daniel Torres danieltorres@elpasoco.com |
10/25/2023 11:25:10 AM | |
Pikes Peak Regional Building Department
10/25/2023 8:20:01 AM |
Enumerations has no comment or objection to this plan. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org |
10/25/2023 8:20:01 AM | |
View |
Falcon School District 49
10/24/2023 12:24:16 PM |
Please see attached correspondence | 10/24/2023 12:24:16 PM |
View |
Falcon Fire Protection District
10/16/2023 2:17:50 PM |
10/16/2023 2:17:50 PM | |
View |
Colorado Division of Water Resources
10/12/2023 4:42:45 PM |
See attached letter. | 10/12/2023 4:42:45 PM |
View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/12/2023 10:26:24 AM |
Good morning Ryan, Please see the attached pdf copy of CSU's 1st review comments for SP237. * If easements for public utilities are to be dedicated by this plat, please include this note: ALL EASEMENTS SHOWN OR DEDICATED HEREON FOR PUBLIC UTILITY PURPOSES SHALL BE SUBJECT TO THOSE TERMS AND CONDITIONS AS SPECIFIED IN THE INSTRUMENT RECORDED AT RECEPTION NO. 212112548 OF THE RECORDS OF EL PASO COUNTY, COLORADO. ALL OTHER EASEMENTS OR INTERESTS OF RECORD AFFECTING ANY OF THE PLATTED PROPERTY DEPICTED HEREON SHALL NOT BE AFFECTED AND SHALL REMAIN IN FULL FORCE AND EFFECT. * Show and label all easements encumbering the site including reception number or book and page. * Please show and label front lot and side lot easements (5’) rear lot easements (7’) Best, Matthew Alcuran, MPA| Engineering Support Specialist Sr. Utilities Development Services | Colorado Springs Utilities 1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903 O: 719-668-8261 |malcuran@csu.org |
10/12/2023 10:26:24 AM |
View |
Parks Advisory Board
10/9/2023 3:06:30 PM |
See Parks comments attached. | 10/9/2023 3:06:30 PM |
View |
EPC Parks Department
10/9/2023 3:05:24 PM |
See Parks comments attached. | 10/9/2023 3:05:24 PM |
911 Authority - El Paso/Teller County
10/9/2023 8:02:40 AM |
Logical extension of Teleo Ct is acceptable. No action for E911 on this submittal. Thank you. Justin. |
10/9/2023 8:02:40 AM | |
View |
EPC Environmental Services
10/6/2023 10:41:47 AM |
10/6/2023 10:41:47 AM | |
Colorado Department of Transportation - Pueblo Office
10/5/2023 9:50:30 AM |
CDOT has no comment | 10/5/2023 9:50:30 AM | |
RBD Floodplain
10/4/2023 4:49:32 PM |
project area not in the SFHA, no comment | 10/4/2023 4:49:32 PM |