PCD Engineering Division
9/26/2022 10:20:21 AM |
Review #4: The approved plans will be uploaded by the project manager. NOTE: A concurrent early grading request (EGP215) has been submitted. The bridge construction is located within the limits of the early grading which provides the required Financial Assurance Estimate and ESQCP. Reviewed by: Gilbert LaForce, PE gilbertlaforce@elpasoco.com |
9/26/2022 10:20:21 AM | |
PCD Project Manager
6/1/2022 9:03:32 AM |
No comments. | 6/1/2022 9:03:32 AM | |
EPC Stormwater Review
6/1/2022 8:39:35 AM |
Stormwater has no comments at this time. | 6/1/2022 8:39:35 AM | |
PCD Engineering Division
5/10/2022 2:31:06 PM |
Comments Resolved. Upload all the engineering documents with the required engineering and developer signatures for final approval. Reviewed by: Gilbert LaForce, PE gilbertlaforce@elpasoco.com Note: The Financial Assurance Estimate for the structure is included in the Winsome Fil 3 application (SF229). Update the estimate to match all the proposed improvements on the Bridge Plans prior to resubmittal of Filing 3. |
5/10/2022 2:31:06 PM | |
View |
PCD Project Manager
2/17/2022 7:24:56 AM |
Please see redline comments on Culvert Construction Drawings | 2/17/2022 7:24:56 AM |
View |
PCD Engineering Division
2/15/2022 10:44:51 AM |
Review 2 redline comments to the following document is attached. Markup Summary is located at the end of the document: * Construction Drawings Resolved: - Letter of Intent - Hydraulic Report - Culvert Design Report - Structure Selection Report Reviewed by: Gilbert LaForce, PE gilbertlaforce@elpasoco.com |
2/15/2022 10:44:51 AM |
View |
PCD Engineering Division
10/25/2021 4:22:06 PM |
Review 1 redlines: Culvert Report | 10/25/2021 4:22:06 PM |
View |
PCD Engineering Division
10/25/2021 4:20:21 PM |
Review 1 redlines: Hydraulic Report | 10/25/2021 4:20:21 PM |
View |
PCD Engineering Division
10/25/2021 4:18:25 PM |
Review 1 redlines: Structure Selection Report | 10/25/2021 4:18:25 PM |
View |
PCD Engineering Division
10/25/2021 4:15:41 PM |
Review 1 redlines: Letter of Intent | 10/25/2021 4:15:41 PM |
View |
PCD Engineering Division
10/25/2021 4:02:51 PM |
Review 1 redlines: Construction Drawings | 10/25/2021 4:02:51 PM |
PCD Engineering Division
10/25/2021 4:23:02 PM |
Review 1 redline comments to the following document will be uploaded as separate comments. Markup Summary is located at the end of the document: - Letter of Intent - Construction Drawings - Culvert Design Report - Structure Selection Report - Hydraulic Report Notice: Per the applicant, the associated geotechnical report will be provided with the resubmittal for review. Reviewed by: Gilbert LaForce, PE gilbertlaforce@elpasoco.com |
10/25/2021 4:23:02 PM | |
EPC Stormwater Review
10/21/2021 5:36:46 PM |
EPC Stormwater has no comments at this time. Reviewed by: Christina Prete, P.E. Stormwater Engineer III christinaprete@elpasoco.com |
10/21/2021 5:36:46 PM | |
PCD Project Manager
10/19/2021 7:39:27 AM |
Comments to be uploaded once PCD Engineering has completed their review. | 10/19/2021 7:39:27 AM |