Owner has purchased land and would like to build a new 10,000 - 15,000 sf building used for office and warehouse uses. Would also like to use the remaining lot for storage of materials or vehicles.
Location
Parcels
5418001005 5418001005
Applicant
Hammers Construction
Lisa Peterson ( lpeterson@hammersconstruction.com )
(719) 570-1599 x105
Lisa Peterson ( lpeterson@hammersconstruction.com )
(719) 570-1599 x105
EA Number
EA21110
File Number
PPR2234
Project Manager
Kylie Bagley
Status
Closed
Created
6/11/2021 10:45:08 AM

View: Project Documents



Review Comments (53)

Link Agency Comment
PCD Engineering Division
12/6/2023 1:31:12 PM
Engineering Review Ver.6

Update FAE received and routed for approval.
No further engineer comments.

Road Impact Category = Industrial. 17,000sqft facility
$3,651 per 1,000 sf
Fee to be paid at time of building permit. Total $62,067
https://publicworks.elpasoco.com/road-impact-fees/

Thank you
Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
12/6/2023 1:31:12 PM
View PCD Engineering Division
11/20/2023 1:41:11 PM
Engineering Review Ver.5

Please correct the FAE V5 to account for common area development stormwater infrastructure.
Please update the FAE and restamp/sign.

Road Impact Category = Industrial. 17,000sqft facility
$3,651 per 1,000 sf
Fee to be paid at time of building permit. Total $62,067
https://publicworks.elpasoco.com/road-impact-fees/

Thank you
Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
11/20/2023 1:41:11 PM
EPC Stormwater Review
9/7/2023 12:17:26 PM
All Stormwater comments have been addressed.

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
9/7/2023 12:17:26 PM
PCD Engineering Division
9/6/2023 6:05:13 PM
Engineering Review Ver.4

No further engineer comments.
Please submit signed documents with both Engineer and Owner/Developer Signature. Following docs need signatures.
Please address any remaining Stormwater comments prior to submittal.

1. GEC Plan-V4- Need owner/developer signature.
2. Final Drainage Report-V4. Need owner/developer signature.
3. FAE-V4 Need owner/developer signature.
4. Road CDs-V3 Need owner/developer signature.

PCD Planner to program a 3-day re-review for approval of documents.

Road Impact Category = Industrial. Fee to be paid at time of building permit. Total $62,067

Thank you
Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
9/6/2023 6:05:13 PM
PCD Project Manager
9/6/2023 2:04:46 PM
No further comments from Planning. 9/6/2023 2:04:46 PM
Colorado Department of Transportation - Pueblo Office
8/29/2023 3:30:51 PM
CDOT Access Comments:
• Access Permit will be required for this development for vehicular access from SH24G/Platte Ave. to Motel Rd. east. Please coordinate with CDOT Access - Arthur Gonzales at arthur.gonzales@state.co.us .
• Please refer to HCD Drilling Access Permit for details and Traffic Planning Comments.

CDOT Traffic Operations Comments:
• The westernmost right in / out is required to be closed and the easternmost right in / out deceleration lane is required to be lengthened on US24 if not already completed by others. The TIS refers to HDC Drilling vs. WireNut, page 11 for example. The improvements will be assigned to the first development constructed.
8/29/2023 3:30:51 PM
View EPC Health Department
8/4/2023 4:49:45 PM
8/4/2023 4:49:45 PM
PCD Project Manager
7/19/2023 12:56:56 PM
No further comments from Planning. 7/19/2023 12:56:56 PM
View PCD Engineering Division
7/19/2023 11:29:51 AM
FDR V3 7/19/2023 11:29:51 AM
View PCD Engineering Division
7/19/2023 11:04:14 AM
GEC PLAN V3 7/19/2023 11:04:14 AM
View PCD Engineering Division
7/19/2023 11:03:45 AM
TIS V3 Comments 7/19/2023 11:03:45 AM
Pikes Peak Regional Building Department
7/19/2023 7:41:22 AM
No further comments.

Becky Allen
PPRBD
719-799-2707
7/19/2023 7:41:22 AM
PCD Engineering Division
7/19/2023 11:32:07 AM
Engineering Review Ver.3

Please see engineering comments on the following review documents.
-Drainage report V3
-GEC plan V3
-TIS V3 (First Submission Review)
- Note a CDOT Access Permit Application will be required to be submitted and approved prior to Site Plan Approval. Please contact CDOT Arthur Gonzales, Access Manager 719-546-5750, arthur.gonzales@state.co.us

-Road Impact Fees are applicable: Please rectify discrepancy between TIS and Letter of Intent for fees to be paid. TIS has industrial Use while LOI indicated Office and Warehouse. General Commercial is applicable. The secondary use does not account for more than 25% of total GSF, so the fee cannot be split into two uses. Please contact for further information.
- A separate developer agreement for CDOT required HWY24 improvements may be required to be submitted with CDOT or County to address HWY24 improvements identified in the TIS.

Engineering comments on the following documents have been resolved:
Road CDs V3

Thank you

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
7/19/2023 11:32:07 AM
RBD Floodplain
7/18/2023 2:18:15 PM
storm outfalls shown in the floodplain will need a floodplain permit coordinated through
Keith Curtis, PE, CFM, LEED AP
Floodplain Administrator
Pikes Peak Regional Building Department
2880 International Circle
Colorado Springs CO, 80910
O: 719-327-2898 E: keith@pprbd.org W: pprbd.org
7/18/2023 2:18:15 PM
EPC Stormwater Review
7/13/2023 1:32:18 PM
Review 3: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- FAE

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
7/13/2023 1:32:18 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/30/2023 3:08:05 PM
Good afternoon Kylie,
Please see the attached CSU 1st review comments for the Wirenut development plan project to be located at 6365 E. Platte Avenue submitted under PPR2234.
Best,

Matthew Alcuran, MPA| Engineering Support Specialist Sr.
Utilities Development Services | Colorado Springs Utilities
1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903
O: 719-668-8261 |malcuran@csu.org
6/30/2023 3:08:05 PM
View Cimarron Hills Fire
6/28/2023 1:56:25 PM
CHFD has reviewed the Site Development plan for Wire Nut. These are approved and a commitment letter has been uploaded. We have also included a fire protection report for future reference. JT McLeod, Fire Inspector III. 6/28/2023 1:56:25 PM
EPC Stormwater Review
10/23/2022 4:54:23 PM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs........................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
10/23/2022 4:54:23 PM
View PCD Engineering Division
10/24/2022 9:27:49 AM
PDB BMP Operations and Maintenance Manual 10/24/2022 9:27:49 AM
View PCD Engineering Division
10/24/2022 9:27:27 AM
Roadway plans/construction drawings redlines 10/24/2022 9:27:27 AM
View PCD Engineering Division
10/24/2022 9:25:50 AM
GEC Plan redlines 10/24/2022 9:25:50 AM
View PCD Engineering Division
10/24/2022 9:23:54 AM
Drainage Report Redlines 10/24/2022 9:23:54 AM
PCD Engineering Division
10/20/2022 5:51:28 PM
Review 2 PCD engineering comments on the following documents will be uploaded:
-Drainage report
-GEC plan
-Roadway plans/construction drawings
-PDB BMP Operations and Maintenance Manual

-Please submit the traffic study for review.


PCD Engineering comments on the following documents have been resolved:
-Site Development Plan
-Letter of intent
-MS4 Post Construction Form
-Financial Assurance Estimate Form

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
10/20/2022 5:51:28 PM
PCD Project Manager
10/20/2022 1:24:57 PM
No further comments from Planning. 10/20/2022 1:24:57 PM
Colorado Springs Planning & Community Development
9/20/2022 4:01:08 PM
If water is requested from the City, annexation would be required. There appears to be contiguity on the west side of this parcel to City property in which annexation may occur, however, please note that any request for annexation would need a pre-application and further research on if there will be streamside overlay implications and stream improvements. Please contact Gabe Sevigny, gabe.sevigny@coloradosprings.gov if further conversation is requested. 9/20/2022 4:01:08 PM
View EPC Health Department
7/23/2022 10:41:04 PM
7/23/2022 10:41:04 PM
View PCD Project Manager
7/21/2022 11:42:03 AM
SWMP Plan_V1_Summary REDLINES; could not upload summary, please remove all document security on V2 submission 7/21/2022 11:42:03 AM
View PCD Project Manager
7/21/2022 11:40:48 AM
SWMP Checklist_V1 7/21/2022 11:40:48 AM
View PCD Project Manager
7/21/2022 11:40:24 AM
Site Development Plan_V1 REDLINES 7/21/2022 11:40:24 AM
View PCD Project Manager
7/21/2022 11:39:48 AM
Roadway Plans_V1 REDLINES 7/21/2022 11:39:48 AM
View PCD Project Manager
7/21/2022 11:38:31 AM
PDB BMP Operations and Maintenance Manual_V1 REDLINES 7/21/2022 11:38:31 AM
View PCD Project Manager
7/21/2022 11:38:01 AM
PBMP Applicability Form_V1 REDLINES 7/21/2022 11:38:01 AM
View PCD Project Manager
7/21/2022 11:37:29 AM
MS4 Post Construction Form_V1 REDLINES 7/21/2022 11:37:29 AM
View PCD Project Manager
7/21/2022 11:37:06 AM
Lighting Plan_V1 REDLINES 7/21/2022 11:37:06 AM
View PCD Project Manager
7/21/2022 11:36:37 AM
Letter of Intent_V1 REDLINES 7/21/2022 11:36:37 AM
View PCD Project Manager
7/21/2022 11:34:40 AM
Landscape Plan Drawings_V1 REDLINES 7/21/2022 11:34:40 AM
View PCD Project Manager
7/21/2022 11:34:00 AM
Grading and Erosion Control Plan_V1 REDLINES 7/21/2022 11:34:00 AM
View PCD Project Manager
7/21/2022 11:32:58 AM
Grading and Erosion Control Checklist_V1 7/21/2022 11:32:58 AM
View PCD Project Manager
7/21/2022 11:32:35 AM
Financial Assurance Forms_V1 REDLINES 7/21/2022 11:32:35 AM
View PCD Project Manager
7/21/2022 11:32:08 AM
Erosion and Stormwater Quality Control Permit_V1 REDLINES 7/21/2022 11:32:08 AM
View PCD Project Manager
7/21/2022 11:31:38 AM
Drainage Report Final_V1 REDLINES 7/21/2022 11:31:38 AM
View PCD Project Manager
7/21/2022 11:30:50 AM
Application Petition Form_V1 REDLINES 7/21/2022 11:30:50 AM
View EPC Stormwater Review
7/20/2022 5:44:45 PM
PBMP_v1 7/20/2022 5:44:45 PM
View EPC Stormwater Review
7/20/2022 5:44:22 PM
ESQCP_v1 7/20/2022 5:44:22 PM
View EPC Stormwater Review
7/20/2022 5:43:30 PM
SWMP Checklist_v1 7/20/2022 5:43:30 PM
View EPC Stormwater Review
7/20/2022 5:40:12 PM
SWMP_v1 7/20/2022 5:40:12 PM
View EPC Stormwater Review
7/20/2022 5:37:33 PM
GEC Checklist_v1 7/20/2022 5:37:33 PM
EPC Stormwater Review
7/20/2022 5:29:36 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs........................(to be uploaded by PM with PCD comments)
- Drainage Report...(to be uploaded by PM with PCD comments)
- FAE.......................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- SWMP
- SWMP Checklist
- ESQCP
- PBMP Applicability Form

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
7/20/2022 5:29:36 PM
PCD Engineering Division
7/19/2022 7:56:53 AM
Review 1 comments on the following documents will be uploaded by the project manager:
-Drainage report
-Financial Assurance Estimate Form
-GEC plan
-Site Development plan
-Roadway plans/construction drawings
-Letter of Intent
-MS4 Post Construction Form
-PDB BMP Operations and Maintenance Manual

Per Chapter 11, section 11.3.3 of the El Paso County Drainage Criteria Manual a geotechnical analysis and report with recommendations for the foundation preparation and embankment construction shall be submitted with the complete design analysis for all permanent detention facilities.


reviewed by:
Daniel Torres
danieltorres@elpasoco.com
7/19/2022 7:56:53 AM
Pikes Peak Regional Building Department
7/12/2022 11:36:53 AM
1. It appears both the fence and the trash enclosure are under 7’ in height, no separate address or permit required.
2. It appears this office/warehouse building is for a single tenant, if this is not the case, please provide secondary addressing for the building. Link to our secondary addressing guide https://www.pprbd.org/File/Resources/Downloads/Addressing/SECONDARY_ADDRESS_REQUEST_FORM.pdf
3. The lot address of 6365 E Platte Avenue is available, please use this address when submitting plans to PPRBD for permit.

Thank you,

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
7/12/2022 11:36:53 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/8/2022 9:18:21 AM
CSU has no water or wastewater in this area, however if you plan to be served by CSU gas and electric please reach out to Tim Wendt at 719-668-4962 7/8/2022 9:18:21 AM
View Cimarron Hills Fire
6/23/2022 2:07:10 PM
6/23/2022 2:07:10 PM
View Cimarron Hills Fire
6/23/2022 2:06:40 PM
CHFD has reviewed the Wirenut site development plans and they are approved. A commitment letter and fire protection report have been uploaded with this approval. JT McLeod, Division Chief/Fire Inspector III. 6/23/2022 2:06:40 PM