Project Review Comments

Back to List


Project Name
Colorado Springs Utilities NE Gravel Staging Area - Site Development Plan
Description
Location
Parcels
5329400005 5329400005
Applicant
Burns & McDonnell
Erin Neil ( enneil@burnsmcd.com )
(720) 879-4039
Erin Neil ( enneil@burnsmcd.com )
(720) 879-4039
File Number
PPR2150
Project Manager
Ryan Howser
Status
Closed
Created
5/26/2021 8:17:08 AM

View: Project Documents



Review Comments (26)

Link Agency Comment
PCD Engineering Division
1/20/2022 7:57:14 AM
There are no further engineering comments relating to engineering. The project manager will upload any approved documents.

Reviewed By:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
1/20/2022 7:57:14 AM
EPC Stormwater Review
1/19/2022 4:57:33 PM
Review 3: EPC Stormwater comments have been resolved on the following documents:
- Drainage Report

EPC Stormwater has no further comments at this time. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
1/19/2022 4:57:33 PM
View PCD Project Manager
12/22/2021 11:03:31 AM
PCD Planning comment - site development plan 12/22/2021 11:03:31 AM
View PCD Project Manager
12/22/2021 11:03:13 AM
PCD Planning comment - lighting plan 12/22/2021 11:03:13 AM
View PCD Project Manager
12/22/2021 11:02:59 AM
Please see attached for a markup summary on the drainage report. 12/22/2021 11:02:59 AM
View PCD Project Manager
12/22/2021 11:02:38 AM
PCD Engineering and EPC Stormwater comments - drainage report 12/22/2021 11:02:38 AM
PCD Engineering Division
12/16/2021 4:22:03 PM
Review 2 comments will be uploaded by the project manager. Please address comments on the following documents:

-Please submit an FAE. A copy of the R-waiver will not cover the FAE.
-Drainage report

Comments have been resolved on:

-Site development plan
-Letter of intent

Reviewed by:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
12/16/2021 4:22:03 PM
View EPC Health Department
12/6/2021 9:04:56 PM
12/6/2021 9:04:56 PM
EPC Stormwater Review
12/13/2021 9:38:11 AM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report...(to be uploaded by PM with PCD comments)

Please re-submit the following documents after making revisions per EPC comments from Review 1. Both forms are still needed even though the site is excluded from needing an ESQCP per the R-Factor Waiver.
- FAE or Letter of Responsibility
- PBMP Applicability Form (to document that permanent WQ treatment is provided. ESQCP related docs are generally for temporary BMPs).

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
12/13/2021 9:38:11 AM
Falcon Fire Protection District
10/25/2021 9:31:15 AM
Falcon Fire has reviewed this request and has no concerns or other comments at this time. 10/25/2021 9:31:15 AM
View PCD Project Manager
10/21/2021 11:32:41 AM
Site development plan comments 10/21/2021 11:32:41 AM
View PCD Project Manager
10/21/2021 11:32:27 AM
Lighting plan comments 10/21/2021 11:32:27 AM
View PCD Project Manager
10/21/2021 11:32:10 AM
Letter of intent comments 10/21/2021 11:32:10 AM
View PCD Project Manager
10/21/2021 11:31:44 AM
Landscape plan comments 10/21/2021 11:31:44 AM
View PCD Project Manager
10/21/2021 11:31:17 AM
PCD Engineering and EPC Stormwater - comments - grading and erosion control plan 10/21/2021 11:31:17 AM
View PCD Project Manager
10/21/2021 11:30:39 AM
PCD Engineering comments - financial assurance forms 10/21/2021 11:30:39 AM
View PCD Project Manager
10/21/2021 11:30:17 AM
PCD Engineering comments - drainage report 10/21/2021 11:30:17 AM
PCD Engineering Division
10/20/2021 10:59:50 AM
The project manager will upload comments. Please address comments on the following documents:

-Financial assurance form
-Drainage report
-Grading and erosion control plan
-Letter of intent
-Site development plan

Reviewed by:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
10/20/2021 10:59:50 AM
Pikes Peak Regional Building Department
10/19/2021 2:19:23 PM
Regarding a request for approval of a site development plan, Enumerations has the following comments:

1. This parcel does currently have an address assigned. The applicant should contact Enumerations once this development plan is approved to establish an address for use when submitting plans for the scale house and associated electric service.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
10/19/2021 2:19:23 PM
View EPC Stormwater Review
10/17/2021 8:56:08 PM
Storm Water Management Plan (SWMP)_V1 10/17/2021 8:56:08 PM
View EPC Stormwater Review
10/17/2021 8:55:24 PM
PBMP Applicability Form_V1 10/17/2021 8:55:24 PM
View EPC Stormwater Review
10/17/2021 8:54:53 PM
Grading & Erosion Control checklist_V1 10/17/2021 8:54:53 PM
EPC Stormwater Review
10/17/2021 8:52:21 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report...(to be uploaded by PM with PCD comments)
- FAE.......................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Due to the volume or complexity of the comments provided on the Drainage Report, EPC Stormwater reserves the right to make additional comments during the next review round. Additional detailed comments will be provided upon receipt of complete report and resolution of the major issues.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
10/17/2021 8:52:21 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/14/2021 9:35:32 AM
No review comments, approval recommended.
____________________________________________
Corey Masoumi | Engineering Support Coordinator
Colorado Springs Utilities | Utilities Development Services
PHYSICAL: 1521 S Hancock Expressway, Colorado Springs, CO 80903
MAILING: PO BOX 1103, MC 1812, Colorado Springs, CO 80947-0010
Direct (719) 668-1856 | Main (719) 668-8259
www.csu.org • www.csu.org/Pages/BuildingDevelopment.aspx
10/14/2021 9:35:32 AM
Cherokee Metro Dist
10/7/2021 1:37:27 PM
No water or wastewater utility additions or modifications are included in this project. 10/7/2021 1:37:27 PM
View EPC Environmental Services
10/5/2021 12:46:08 PM
10/5/2021 12:46:08 PM