Project Review Comments

Back to List


Project Name
Forest Lakes Filing No. 6
Description
Final Plat within PUDSP-19-6
Location
Parcels
7100000443 7100000443
Applicant
Classic Consulting Engineers & Surveyors, LLC
kyle campbell ( KCampbell@classicconsulting.net )
(719) 492-1219
kyle campbell ( KCampbell@classicconsulting.net )
(719) 492-1219
File Number
CON2121
Project Manager
Spencer Pirzadeh
Status
Active
Created
5/13/2021 3:45:55 PM

View: Project Documents



Review Comments (4)

Link Agency Comment
View EPC Stormwater Review
2/14/2023 5:45:45 PM
Certification Letters 2/14/2023 5:45:45 PM
View EPC Stormwater Review
2/14/2023 5:45:12 PM
As-Built CDs 2/14/2023 5:45:12 PM
EPC Stormwater Review
2/14/2023 5:44:04 PM
Review 1: EPC DPW Stormwater comments have been provided on the following uploaded documents:
- As-Built CDs
- Certification Letters

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
2/14/2023 5:44:04 PM
PCD Engineering Division
2/14/2023 9:56:09 AM
Review 1 comments on the following documents will be uploaded by the stormwater engineer:
- As-built drawings
- Engineering Certification letter


reviewed by:
Daniel Torres
danieltorres@elpasoco.com
2/14/2023 9:56:09 AM