Project Review Comments

Back to List


Project Name
The Landings of Denmark CDR
Description
Construction drawings review for roads within Filings 1 and 2 of The Landings of Denmark. SF00028 / SF04015 / SF0415 for reference
Location
Parcels
3311001005 3311001005 3311001010 3311001010 3311003001 3311003001 3311003005 3311003005 3311003009 3311003009
Applicant
M.V.E., Inc.
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
EA Number
EA2181
File Number
CDR2212
Project Manager
Ryan Howser
Status
Active
Created
5/13/2021 11:50:08 AM

View: Project Documents



Review Comments (33)

Link Agency Comment
View PCD Engineering Division
3/16/2023 4:40:16 PM
Drainage Letter Redlines 3/16/2023 4:40:16 PM
View PCD Engineering Division
3/16/2023 4:37:33 PM
GEC Plan Redlines 3/16/2023 4:37:33 PM
View PCD Engineering Division
3/16/2023 4:35:04 PM
Letter of Intent Redlines 3/16/2023 4:35:04 PM
View PCD Engineering Division
3/16/2023 4:32:48 PM
Construction Drawings Redlines 3/16/2023 4:32:48 PM
PCD Engineering Division
3/16/2023 4:29:42 PM
Review 2: EPC Engineering comments have been provided on the following uploaded documents:

- Construction Drawings
- Drainage Letter
- Grading & Erosion Control Plan
- Letter of Intent

Review 1 comments resolved on:
- FAE

Reviewed by:
Carlos Hernandez
carloshernandez@elpasoco.com
3/16/2023 4:29:42 PM
View EPC Stormwater Review
3/15/2023 3:57:40 PM
SWMP Checklist_v2 3/15/2023 3:57:40 PM
View EPC Stormwater Review
3/15/2023 3:57:20 PM
SWMP_v2 3/15/2023 3:57:20 PM
View EPC Stormwater Review
3/15/2023 3:56:47 PM
ESQCP_v2 3/15/2023 3:56:47 PM
View EPC Stormwater Review
3/15/2023 3:56:25 PM
PBMP_v2 3/15/2023 3:56:25 PM
View EPC Stormwater Review
3/15/2023 3:56:03 PM
GEC Checklist_v2 3/15/2023 3:56:03 PM
PCD Project Manager
3/15/2023 1:18:07 PM
Planning Division has no comments at this time. 3/15/2023 1:18:07 PM
EPC Stormwater Review
3/15/2023 3:53:25 PM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs........................(to be uploaded by PM with PCD comments)
- Drainage Report....(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- PBMP Applicability Form
- ESQCP
- SWMP
- SWMP Checklist

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
3/15/2023 3:53:25 PM
View County Attorney - Development Review
3/7/2023 11:18:46 AM
Proposed edits to SIA attached. 3/7/2023 11:18:46 AM
View PCD Engineering Division
9/15/2022 10:57:42 AM
Letter of Intent Redlines 9/15/2022 10:57:42 AM
PCD Engineering Division
9/15/2022 10:57:20 AM
GEC Redlines 9/15/2022 10:57:20 AM
View PCD Engineering Division
9/15/2022 10:57:04 AM
FAE Redlines 9/15/2022 10:57:04 AM
View PCD Engineering Division
9/15/2022 10:56:41 AM
Drainage Letter Redlines 9/15/2022 10:56:41 AM
View PCD Engineering Division
9/15/2022 10:55:30 AM
Construction Drawing Redlines 9/15/2022 10:55:30 AM
PCD Engineering Division
9/15/2022 10:54:46 AM
Review 1: EPC Engineering comments have been provided on the following uploaded documents:

- Construction Drawings
- Final Drainage Report
- FAE
- Grading & Erosion Control Plan
- Letter of Intent

Due to the volume or complexity of the comments provided, the County reserves the right to make additional comments on the second review.

Reviewed by:
Charlene Durham, P.E.
charlenedurham@elpasoco.com
9/15/2022 10:54:46 AM
PCD Project Manager
9/13/2022 8:23:58 AM
Planning Division has no comments at this time. 9/13/2022 8:23:58 AM
View EPC Stormwater Review
9/12/2022 2:49:08 PM
SWMP Checklist_v1 9/12/2022 2:49:08 PM
View EPC Stormwater Review
9/12/2022 2:48:47 PM
SWMP_v1 9/12/2022 2:48:47 PM
View EPC Stormwater Review
9/12/2022 2:48:23 PM
PBMP_v1 9/12/2022 2:48:23 PM
View EPC Stormwater Review
9/12/2022 2:48:05 PM
ESQCP_v1 9/12/2022 2:48:05 PM
View EPC Stormwater Review
9/12/2022 2:47:42 PM
GEC Checklist_v1 9/12/2022 2:47:42 PM
EPC Stormwater Review
9/12/2022 2:23:18 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs........................(to be uploaded by PM with PCD comments)
- Drainage Report...(to be uploaded by PM with PCD comments)
- FAE.......................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- ESQCP
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
9/12/2022 2:23:18 PM
View El Paso County Conservation Dist
9/7/2022 10:29:26 AM
Native grass seed mix info attached as a .jpg. 9/7/2022 10:29:26 AM
View El Paso County Conservation Dist
9/7/2022 10:29:12 AM
Brief comments attached as a .docx. 9/7/2022 10:29:12 AM
Mountain View Electric Association, Inc.
8/30/2022 3:01:25 PM
Mountain View Electric Association has no comment on the CD's 8/30/2022 3:01:25 PM
Colorado Department of Transportation - Pueblo Office
8/19/2022 2:11:17 PM
No comments. No impacts to CDOT ROW. 8/19/2022 2:11:17 PM
Ellicott Fire Protection District
8/19/2022 8:38:41 AM
Please ensure all of the below are complied with.
Review Fee $100.00
Please make check payable to the Ellicott Fire Department
Please sent payments to
Ellicott Fire Station #2
75 N Ellicott Hwy,
Calhan, CO 80808

Ensure the project name is on the check.

Thank you
Mark Stanwood
Fire Marshal
8/19/2022 8:38:41 AM
View Ellicott Fire Protection District
8/19/2022 8:35:18 AM
8/19/2022 8:35:18 AM
Ellicott Fire Protection District
8/19/2022 8:33:46 AM
This project shall comply with Section 6.3.3. Fire Protection and Wildfire Mitigation of the El Paso County Land Development Code.
Including Sections 6.3.3. (C) Design Standards
(1) Water Supply
(a)General. Water supply systems used for fire protection purposes shall be installed and maintained in accordance with NFPA standards.
(d)Areas without Central Water Systems. (i)Fire Cisterns.• Fire Cisterns Required
(2)Roads.
(a)Roads Constructed to County Standards.
(b)Roads within 150 Feet of Development.
(c)Two Access Routes Required.
(d)Turnaround Required on Dead-End Roads.
(3)Non-Road Access
(a)Emergency Access Provided.
(b)Driveways Required.
(e)Width of Driveway and Emergency Vehicle Lanes.
(f)Vertical Clearance.
(g)Turns.
(j)Turnouts and Turnarounds Required.
(j)Turnouts and Turnarounds Required.
(l)Bridges or Drainage Crossings
(4)Gates.
(a)Gate Location and Dimensions.
(b)Locks.
8/19/2022 8:33:46 AM