Project Review Comments
- Project Name
- Falcon Karate Studio - Site Development Plan
- Description
- Applicant proposes to construct two 60x90 ft buildings for karate studio.
- Location
- Parcels
- 5312111006 5312111006
- Applicant
-
DREXEL, BARRELL & CO.
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219 Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219 - File Number
- PPR2167
- Project Manager
- Ashlyn Mathy
- Status
- Closed
- Created
- 3/8/2021 3:51:11 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
7/3/2023 3:06:07 PM |
No further engineer comments. Routed for County Engineer signature. -Road Impacts fee will be paid at time of building permit. Bldg 1 (General. Commercial) Bldg 2 (Warehouse) -Work in the Right of Permit will be required. -License agreement for xeriscaping landscaping in the ROW to be completed (signed) concurrently with site dev plan approval. -A condition of approval is required for any future change in use of Bldg 2 (warehouse) to include a new TIS, parking plan, and shared parking plan agreement as applicable. Road Impact fees assessed between previous (original) and new use type. Thank you Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
7/3/2023 3:06:07 PM | |
PCD Engineering Division
6/21/2023 7:12:01 AM |
Engineer Review Ver.5 Signed documents received on 6/20/23. No further engineer comments. Routed for County Engineer signature. -Road Impacts fee will be paid at time of building permit. Bldg 1 (General. Commercial) Bldg 2 (Warehouse) -Work in the Right of Permit will be required. -License agreement for xeriscaping landscaping in the ROW to be completed (signed) concurrently with site dev plan approval. -A condition of approval is required for any future change in use of Bldg 2 (warehouse) to include a new TIS, parking plan, and shared parking plan agreement as applicable. Road Impact fees assessed between previous (original) and new use type. Thank you Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
6/21/2023 7:12:01 AM | |
EPC Stormwater Review
6/5/2023 1:00:19 PM |
Review 5: EPC DPW Stormwater comments have been resolved on the following documents: - Drainage Report - GEC Plan Owner still needs to sign page 4 of the ESQCP Application Form. EPC DPW Stormwater has no further comments. Planner: no re-review necessary. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III glennreese@elpasoco.com 719-675-2654 |
6/5/2023 1:00:19 PM | |
View |
EPC Stormwater Review
4/27/2023 5:06:58 PM |
GEC Plan | 4/27/2023 5:06:58 PM |
View |
EPC Stormwater Review
4/27/2023 5:06:26 PM |
Drainage Report | 4/27/2023 5:06:26 PM |
PCD Project Manager
4/26/2023 3:37:32 PM |
planning comments resolved 3/16/23 | 4/26/2023 3:37:32 PM | |
PCD Engineering Division
4/27/2023 7:25:36 AM |
Engineer Review Ver.4 Please see engineer comments. Once Stormwater comments have been resolved please complete the following -Final Drainage Report V4. Please provide signatures and engineer stamp with signature and date -FAE V4 Please provide signatures and engineer stamp with signature and date -PBMP Applicability Form V4. Please provide signatures and engineer stamp with signature and date -CDs V4 Please provide signatures and engineer stamp with signature and date -GEC Plan V4. Please provide signatures and engineer stamp with signature and date -Deviations (2) (Right of Way Work and Sidewalk) Please provide signatures and engineer stamp with signature and date. Deviations are under DPW review. Road Impacts fee will be paid at time of building permit. Bldg 1 (General. Commercial) Bldg 2 (Warehouse) Work in the Right of Permit will be required License agreement for landscaping in the ROW to be completed (signed) concurrently with site dev plan approval. A condition of approval is required for any future change in use of Bldg 2 (warehouse) to include a new TIS, parking plan, and shared parking plan agreement as applicable. Road Impact fees assessed between old and new use type. Thank you Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
4/27/2023 7:25:36 AM | |
EPC Stormwater Review
4/27/2023 5:05:26 PM |
Review 4: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report - GEC Plan For the following documents, see previous Review 2 comments. You did not upload revised versions of these docs with Submittal 3 or 4. - SWMP - SWMP Checklist Please give me a call if you have any questions/comments about my comments. My comments on all docs are very minor. So go ahead and sign/stamp all documents and resubmit them for final approval. This includes GEC Checklist, SWMP Checklist, PBMP Applicability Form, Drainage Report, GEC Plan, FAE, and ESQCP. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III glennreese@elpasoco.com 719-675-2654 |
4/27/2023 5:05:26 PM | |
PCD Project Manager
3/16/2023 3:15:53 PM |
planning comments have been resolved at this time. | 3/16/2023 3:15:53 PM | |
View |
PCD Engineering Division
3/16/2023 10:55:24 AM |
CDs V3 | 3/16/2023 10:55:24 AM |
View |
PCD Engineering Division
3/16/2023 10:36:00 AM |
PBMP Applicability Form V3 | 3/16/2023 10:36:00 AM |
View |
PCD Engineering Division
3/16/2023 10:35:35 AM |
FAE V3 | 3/16/2023 10:35:35 AM |
View |
PCD Engineering Division
3/16/2023 10:35:14 AM |
Final Drainage Report V3 | 3/16/2023 10:35:14 AM |
PCD Engineering Division
3/16/2023 10:34:17 AM |
Engineer Review Ver.3 Please see engineer redline comments on the following documents. -Final Drainage Report V3 -FAE V3 -GEC Plan Version 3 not submitted. Please upload with V2 corrections -PBMP Applicability Form V3. -CDs V3 (first review) -Deviation Request is required for road cut on Old Meridian. See comments on Letter of Intent V1 for specifics. Missing submission unresolved. Please submit. See CDs for sidewalk deviation. Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
3/16/2023 10:34:17 AM | |
EPC Stormwater Review
3/15/2023 8:50:18 AM |
Review 3: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report....(to be uploaded by Edward with both of our comments) For the following documents, see previous Review 2 comments. You did not upload revised versions of these docs with Submittal 3. - GEC Plan (you did upload a never before seen set of CDs for Review 3, but they did not include the GEC Plan) - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer III glennreese@elpasoco.com |
3/15/2023 8:50:18 AM | |
View |
PCD Project Manager
12/14/2022 3:39:55 PM |
landscape plan | 12/14/2022 3:39:55 PM |
View |
PCD Project Manager
12/14/2022 3:39:04 PM |
Letter of intent | 12/14/2022 3:39:04 PM |
View |
PCD Project Manager
12/14/2022 3:38:29 PM |
Sign plan | 12/14/2022 3:38:29 PM |
View |
PCD Project Manager
12/14/2022 3:38:08 PM |
SDP | 12/14/2022 3:38:08 PM |
View |
PCD Project Manager
12/14/2022 3:37:48 PM |
lighting plan | 12/14/2022 3:37:48 PM |
View |
PCD Engineering Division
12/12/2022 5:58:41 PM |
Deviation Request Form | 12/12/2022 5:58:41 PM |
View |
PCD Engineering Division
12/12/2022 5:51:47 PM |
PBMP Applicability Form V2 | 12/12/2022 5:51:47 PM |
View |
PCD Engineering Division
12/12/2022 5:51:24 PM |
GEC Plan V2 | 12/12/2022 5:51:24 PM |
View |
PCD Engineering Division
12/12/2022 5:50:55 PM |
FAE V2 | 12/12/2022 5:50:55 PM |
View |
PCD Engineering Division
12/12/2022 5:50:33 PM |
Final Drainage Report (FDR) V2 | 12/12/2022 5:50:33 PM |
Pikes Peak Regional Building Department
12/9/2022 11:11:03 AM |
1. It appears a different address for the north building has been assigned by this office. The previous address (9009 Chicago Ave) was assigned in December 2021; however, since another address was given to the submitter, please use 9005 Chicago Ave for the north building and the south building will remain 9015 Chicago Avenue. Please use these addresses when submitting plans for permit. 2. Per the floor plans, it appears these buildings will be single tenant buildings. Secondary Addressing is not needed. 3. No further comment. Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
12/9/2022 11:11:03 AM | |
PCD Engineering Division
12/12/2022 5:33:09 PM |
Engineer Review Ver.2 Please see engineer redlines and comments on the following reviewed documents. -Final Drainage Report (FDR) V2 -FAE (Form will need to be updated to 2022 or 2023 version based on approval date -Deviation Request is required for road cut on Meridian. See comments on Letter of Intent V1 for specifics. Missing submission. -Site Development Plan V2 (Comments to be uploaded by PM) -GEC Plan V2 -Landscape Plan V2 (Comments to be uploaded by PM) -Letter of Intent V2 (Comments to be uploaded by PM) -PBMP Applicability Form V2. Please see comment in FDR V2. -Road Construction Plans are required for Chicago Ave. Missing Please submit. NOTE: - The 2022 Financial Assurance Estimate (FAE) Form is available for download at https://planningdevelopment.elpasoco.com/planning-development-forms/#1584029763943-19bc4c03-3586. The FAE will need to be updated to the 2023 FAE form if final approval of the application occurs after January 1, 2023. The 2023 FAE should be available by mid December. Contact the review engineer for a copy of the 2023 FAE document at that time. |
12/12/2022 5:33:09 PM | |
View |
EPC Stormwater Review
12/5/2022 4:40:51 PM |
SWMP Checklist | 12/5/2022 4:40:51 PM |
View |
EPC Stormwater Review
12/5/2022 4:40:30 PM |
SWMP | 12/5/2022 4:40:30 PM |
EPC Stormwater Review
12/5/2022 4:40:00 PM |
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report....(to be uploaded by PM with PCD comments) - GEC Plan...............(to be uploaded by PM with PCD comments) - SWMP - SWMP Checklist EPC Stormwater comments have been resolved on the following documents: - ESQCP - GEC Checklist - PBMP Applicability Form Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
12/5/2022 4:40:00 PM | |
View |
PCD Project Manager
1/13/2022 5:50:31 PM |
Please see redline comments on TIS | 1/13/2022 5:50:31 PM |
View |
PCD Project Manager
1/13/2022 5:50:12 PM |
Please see redline comments on SWMP Checklist | 1/13/2022 5:50:12 PM |
View |
PCD Project Manager
1/13/2022 5:49:48 PM |
Please see redline comments on SDP | 1/13/2022 5:49:48 PM |
View |
PCD Project Manager
1/13/2022 5:49:27 PM |
Please see redline comments on Lighting Plan | 1/13/2022 5:49:27 PM |
View |
PCD Project Manager
1/13/2022 5:49:02 PM |
Please see redline comments on LOI | 1/13/2022 5:49:02 PM |
View |
PCD Project Manager
1/13/2022 5:48:39 PM |
Please see redline comments on Landscape Plans | 1/13/2022 5:48:39 PM |
View |
PCD Project Manager
1/13/2022 5:48:17 PM |
Please see redline comments on GEC Plan | 1/13/2022 5:48:17 PM |
View |
PCD Project Manager
1/13/2022 5:47:56 PM |
Please see redline comments on GEC Checklist | 1/13/2022 5:47:56 PM |
View |
PCD Project Manager
1/13/2022 5:47:34 PM |
Please see redline comments on Floor Plans | 1/13/2022 5:47:34 PM |
View |
PCD Project Manager
1/13/2022 5:47:15 PM |
Please see redline comments on FAE | 1/13/2022 5:47:15 PM |
View |
PCD Project Manager
1/13/2022 5:46:52 PM |
Please see redline comments on ESQCP | 1/13/2022 5:46:52 PM |
View |
PCD Project Manager
1/13/2022 5:46:29 PM |
Please see redline comments on Easement Letter | 1/13/2022 5:46:29 PM |
View |
PCD Project Manager
1/13/2022 5:46:09 PM |
Please see redline comments on Drainage Report | 1/13/2022 5:46:09 PM |
View |
EPC Health Department
1/1/2022 6:10:40 PM |
1/1/2022 6:10:40 PM | |
Upper Black Squirrel Creek GWMD
12/21/2021 2:54:38 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time. We respectfully reserve to comment in the future if necessary. | 12/21/2021 2:54:38 PM | |
PCD Engineering Division
12/16/2021 1:53:01 PM |
Engineer Review Ver.1 Please see engineer redline comments on the following documents: Letter of Intent (LOI) Drainage Report Easement Letter ESQCP Financial Assurance Estimate (FAE) GEC Checklist GEC Plan Landscape Design Plan Site Development Plan Traffic Impact Study (TIS) Project Manager will prepare and send documents for review. Edward B. Schoenheit Engineer I Reviewer El Paso County Planning & Community Development EdwardSchoenheit@elpasoco.com 719-520-6813 (O) 719-502-9659 (C) |
12/16/2021 1:53:01 PM | |
View |
EPC Stormwater Review
12/15/2021 6:27:59 PM |
SWMP Checklist | 12/15/2021 6:27:59 PM |
View |
EPC Stormwater Review
12/15/2021 6:27:38 PM |
SWMP | 12/15/2021 6:27:38 PM |
View |
EPC Stormwater Review
12/15/2021 6:27:16 PM |
PBMP Applicability Form | 12/15/2021 6:27:16 PM |
View |
EPC Stormwater Review
12/15/2021 6:26:59 PM |
GEC Checklist | 12/15/2021 6:26:59 PM |
EPC Stormwater Review
12/15/2021 5:52:34 PM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report...(to be uploaded by PM with PCD comments) - ESQCP...................(to be uploaded by PM with PCD comments) - GEC Plan...............(to be uploaded by PM with PCD comments) - GEC Checklist - PBMP Applicability Form - SWMP - SWMP Checklist Please provide the following documents on resubmittal for the grass swale that will be used as a PBMP for runoff reduction: - MS4 Post Construction Form - O&M Manual - Private Detention Basin / Stormwater Quality BMP Maintenance Agreement Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
12/15/2021 5:52:34 PM | |
View |
Falcon Fire Protection District
12/7/2021 2:37:51 PM |
12/7/2021 2:37:51 PM | |
Pikes Peak Regional Building Department
12/6/2021 3:35:00 PM |
1. The site appears to be accessed off of Chicago Avenue, the address for the northern building will be 9009 Chicago Avenue and the southern building will be 9015 Chicago Avenue. When submitting building plans to RBD, please submit separate plans under each address for each building. 2. The section portion and the section are incorrect on the title block on the first page of the site plan. Please correct. 3. The Lot to the south east of the proposed project is labeled incorrectly on the site plan. It should read Lot 1 High Prairie Brand Library not unplatted. The lot to the northeast is LOTS 1-8 BLK 20 & LOTS 14-16 BLK 19. Please correct both legal descriptions on the site plan (page USP). 4. It appears both buildings top and bottom floors are for a single tenant, if this is not the case, please provide secondary addressing for the two buildings. See our secondary addressing guide link here for more information: https://www.pprbd.org/File/Resources/Downloads/Addressing/SECONDARY_ADDRESS_REQUEST_FORM.pdf Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
12/6/2021 3:35:00 PM | |
View |
Mountain View Electric Association, Inc.
12/6/2021 12:22:07 PM |
See attached comments | 12/6/2021 12:22:07 PM |
County Attorney - Development Review
12/3/2021 8:59:47 PM |
No comments from County Attorney - Development Review at this time. | 12/3/2021 8:59:47 PM | |
View |
EPC Parks Department
12/3/2021 12:22:48 PM |
See Parks comments attached. Greg |
12/3/2021 12:22:48 PM |
View |
Colorado Department of Transportation - Pueblo Office
12/2/2021 3:43:32 PM |
12/2/2021 3:43:32 PM | |
View |
El Paso County Conservation Dist
11/29/2021 10:31:18 AM |
11/29/2021 10:31:18 AM | |
View |
El Paso County Conservation Dist
11/29/2021 10:30:52 AM |
11/29/2021 10:30:52 AM | |
911 Authority - El Paso/Teller County
11/29/2021 9:12:07 AM |
No new streetnames requested on this submittal. No action for E911. Thank you. Justin |
11/29/2021 9:12:07 AM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/24/2021 1:34:14 PM |
The review has been completed. For this project, CSU only provides gas service. The DP plans do not depict the gas lines or the gas meter location. A gas meter must be located at least 3 feet away from any openings. Nate De Kock (719-668-7858) will be your main point of contact for future questions on gas. I have no comments. I recommend approval. ____________________________________________ Corey Masoumi | Engineering Support Coordinator Colorado Springs Utilities | Utilities Development Services PHYSICAL: 1521 S Hancock Expressway, Colorado Springs, CO 80903 MAILING: PO BOX 1103, MC 1812, Colorado Springs, CO 80947-0010 Direct (719) 668-1856 | Main (719) 668-8259 www.csu.org • www.csu.org/Pages/BuildingDevelopment.aspx |
11/24/2021 1:34:14 PM |