Project Name
Grandview Reserve 1041 new water and wastewater system
Description
A 1041 for a new water and wastewater system to serve the Grandview Reserve Sketch Plan area: commercial, institutional, multi-family, and single-family development. A force main connection to Cherokee Metro District for wastewater along Curtis Road is included.
Location
Parcels
4200000396 4200000396 4200000464 4200000464 4200000465 4200000465 4200000466 4200000466 4200000471 4200000471 4200000472 4200000472 4200000473 4200000473
Applicant
HR Green
Phil Stuepfert ( pstuepfert@hrgreen.com )
(630) 220-7936
Phil Stuepfert ( pstuepfert@hrgreen.com )
(630) 220-7936
EA Number
EA20175
File Number
AASI213
Project Manager
Kari Parsons
Status
Closed
Created
3/5/2021 8:16:12 AM

View: Project Documents



Review Comments (84)

Link Agency Comment
PCD Engineering Division
2/28/2024 1:44:37 PM
Engineering has no further comments.

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
2/28/2024 1:44:37 PM
PCD Project Manager
2/27/2024 9:20:24 AM
resubmitted docs 2/27/2024. Planning doing final check on these docs. 2/27/2024 9:20:24 AM
Colorado Geological Survey
2/26/2024 10:19:50 AM
CGS has no comments in regards to the new referral documents. 2/26/2024 10:19:50 AM
Colorado Geological Survey
2/26/2024 10:18:37 AM
CGS has no comments in regards to the new referral documents. 2/26/2024 10:18:37 AM
PCD Engineering Division
2/26/2024 9:38:36 AM
Engineering Comments:

- Exhibit X - TIS in the "Full Document Compiled with Appendices" needs to be replaced with the newer TIS provided as a standalone document.

Charlene Durham
719-520-7951
2/26/2024 9:38:36 AM
EPC Stormwater Review
2/26/2024 7:44:13 AM
EPC DPW Stormwater does not have comments on any of the submitted documents. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
2/26/2024 7:44:13 AM
County Attorney - Development Review
2/22/2024 1:25:02 PM
No further comments at this time. Please advise if legal review of specific items is needed. 2/22/2024 1:25:02 PM
Cherokee Metro Dist
2/22/2024 1:06:31 PM
No comments 2/22/2024 1:06:31 PM
EPC Stormwater Review
2/21/2024 4:07:05 PM
EPC DPW Stormwater does not have comments on any of the submitted documents. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
2/21/2024 4:07:05 PM
View EPC Environmental Services
2/20/2024 1:03:22 PM
2/20/2024 1:03:22 PM
View EPC Environmental Services
2/20/2024 1:01:45 PM
2/20/2024 1:01:45 PM
County Attorney - Development Review
2/20/2024 9:58:18 AM
This appears to be a duplicate referral. 2/20/2024 9:58:18 AM
EPC Sheriff's Department
2/8/2024 12:57:53 PM
No concerns from EPSO 2/8/2024 12:57:53 PM
Colorado Department of Transportation - Pueblo Office
1/29/2024 9:20:32 AM
Previous comments still apply (listed below):

CDOT Access: A CDOT Access Permit exist for this development and is awaiting the document submittal for the Notice to Proceed to construct.

CDOT Traffic: No comments

CDOT Hydraulics: No Comments

CDOT Environmental: Noise analysis does not explicitly say the developer would be constructing the noise mitigation measures. CDOT does not mitigate noise this is the responsibility of the developer to design and construct if needed.

We are not given a clear response that this project will not impact CDOT wetland resources within the US 24 ROW.
1/29/2024 9:20:32 AM
View El Paso County Conservation Dist
1/24/2024 11:03:17 AM
Brief comments attached as a .pdf. 1/24/2024 11:03:17 AM
View Upper Black Squirrel Creek GWMD
1/23/2024 5:15:34 PM
1/23/2024 5:15:34 PM
View Peyton 23
1/18/2024 9:52:28 AM
1/18/2024 9:52:28 AM
View PCD Project Manager
1/17/2024 5:56:19 PM
Full document part 1 review 4 1/17/2024 5:56:19 PM
View PCD Project Manager
1/17/2024 5:16:32 PM
full document redlines w summary sheet part 2 review 4 1/17/2024 5:16:32 PM
PCD Project Manager
1/17/2024 6:00:26 PM
Please break the whole 1041 document into 2 or 3 sections, as it is to large to upload as one pdf. Comments were discussed in meeting held 1-17-24 1/17/2024 6:00:26 PM
View PCD Engineering Division
1/17/2024 4:39:59 PM
See comment letter (link at left) and below.

- Exhibit HH Haul Route Redlines - Label roads
- Replace current TIS with document approved September 16, 2020 under SKP201.

Charlene Durham
719-520-7951
1/17/2024 4:39:59 PM
Colorado Geological Survey
1/17/2024 11:28:56 AM
No new/relevant documents. See previous comments. 1/17/2024 11:28:56 AM
View EPC Parks Department
1/12/2024 11:50:22 AM
El Paso County Parks and Community Services Final Comments, 3rd Submittal - Please See Attached Document (Administrative Comments Only - No PAB Endorsement Necessary for 1041 Permit Reviews) 1/12/2024 11:50:22 AM
County Attorney - Development Review
1/9/2024 4:36:54 PM
No further comments at this time. Please advise if legal review of specific items is needed. 1/9/2024 4:36:54 PM
EPC Stormwater Review
1/9/2024 10:58:18 AM
EPC DPW Stormwater does not have comments on any of the submitted documents. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
1/9/2024 10:58:18 AM
View Falcon Fire Protection District
1/8/2024 1:29:05 PM
1/8/2024 1:29:05 PM
View EPC Environmental Services
1/8/2024 12:28:46 PM
1/8/2024 12:28:46 PM
Colorado Parks and Wildlife
12/28/2023 1:49:34 PM
CPW appreciates the opportunity to comment on the Grandview Reserve 1041 new water and wastewater project plan. CPW is familiar with the site and has commented in the past about the project. CPW wants to recognize and appreciate that many of our comments have been taken into consideration, and have been adapted to the project plan. CPW feels, with the consideration of previous comments, that the impacts to wildlife will be minimal.

We appreciate being given the opportunity to comment. Please feel free to contact District Wildlife Manager, Aaron Berscheid, should you have any questions or require additional information at 719-439-9601 or via email at aaron.berscheid@state.co.us
12/28/2023 1:49:34 PM
Black Forest Land Use Committee
12/27/2023 9:39:19 PM
This project is outside of the area of interest for the Black Forest Land Use Committee so we will not be submitting any comments on it. Thank you for letting us review it. 12/27/2023 9:39:19 PM
Meadow Lake Airport Association
12/25/2023 9:32:26 AM
MLAA has no comments at this time ... 12/25/2023 9:32:26 AM
View Colorado Division of Water Resources
12/21/2023 6:49:07 PM
See attached letter. 12/21/2023 6:49:07 PM
Cherokee Metro Dist
12/20/2023 11:04:12 AM
Grandview Metropolitan District withdrew from the Cherokee IGA and does not currently have reserved wastewater treatment capacity. Please remove the Cherokee IGA and wastewater routes to Cherokee's water reclamation facility from future applications. 12/20/2023 11:04:12 AM
Mountain View Electric Association, Inc.
12/20/2023 8:40:46 AM
Mountain View Electric Association has no objection to the current plan. No comment at this time. 12/20/2023 8:40:46 AM
County Attorney - Development Review
4/11/2023 12:45:32 PM
County Attorney's Office takes the position that the 1041 application is not complete without the materials required by Section 4.201 (1) of the AASI regulations and does not recommend approval of the application without this information. 4/11/2023 12:45:32 PM
PCD Project Manager
3/30/2023 2:54:54 PM
Engineering comments are in blue; planning comments in green. 3/30/2023 2:54:54 PM
View PCD Project Manager
3/30/2023 2:54:24 PM
Haul Route Comment by Engineering 3/30/2023 2:54:24 PM
View PCD Project Manager
3/30/2023 2:52:50 PM
Chapter 2.301 comments minor 3/30/2023 2:52:50 PM
View PCD Project Manager
3/30/2023 2:52:16 PM
Chapter 4.201 comments minor 3/30/2023 2:52:16 PM
View PCD Engineering Division
3/27/2023 1:02:27 PM
Exhibit HH - Haul Route Exhibit Redlines 3/27/2023 1:02:27 PM
View PCD Engineering Division
3/28/2023 10:01:02 AM
See comment letter (link at left) and redlines.

- Exhibit HH Haul Route Redlines
- 1041 Documents Related to 2.303 Redlines (to be uploaded by PM)

Charlene Durham / Jeff Rice
719-520-7951 / 719-520-7877
3/28/2023 10:01:02 AM
View El Paso County Conservation Dist
3/19/2023 5:14:46 PM
Brief comments attached as a .pdf. 3/19/2023 5:14:46 PM
Colorado Department of Transportation - Pueblo Office
3/14/2023 8:49:12 AM
CDOT Access: A CDOT Access Permit exist for this development and is awaiting the document submittal for the Notice to Proceed to construct.

CDOT Traffic: No comments

CDOT Hydraulics: No Comments

CDOT Environmental: Noise analysis does not explicitly say the developer would be constructing the noise mitigation measures. CDOT does not mitigate noise this is the responsibility of the developer to design and construct if needed.

We are not given a clear response that this project will not impact CDOT wetland resources within the US 24 ROW.

Thank you,

Arthur Gonzales - CDOT Access
3/14/2023 8:49:12 AM
Colorado Geological Survey
3/13/2023 1:37:21 PM
No updated geologic hazards or geotechnical report was provided with this submittal. Per our 1/27/2022 comments, provided CTL Thompson's recommendations (December 23, 2020) are adhered to and subsurface soil investigations are performed for proposed structures associated with the new water and wastewater facility (lift stations, water storage tanks, treatment facilities, etc.), CGS has no objection to the project as planned.

A geotechnical report prepared by Entech Engineering (January 15, 2019) is referenced in HR Green's 1041 Permit Application dated February 18, 2023. This report was not included with the project referral documents.

Submitted 3/13/2023 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu)
3/13/2023 1:37:21 PM
US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
3/9/2023 12:45:17 PM
Hello,

Thank you for contacting the U.S. Fish and Wildlife Service (Service). The Service has reviewed the Grandview Reserve project and has no concerns with this project resulting in impacts to species listed as candidate, proposed, threatened, or endangered.

We appreciate your efforts to ensure the conservation of threatened and endangered species. Thank you for contacting us and please let me know if you have any further questions.

Sincerely,
Emily Berchem
3/9/2023 12:45:17 PM
County Attorney - Development Review
3/7/2023 8:08:36 PM
No comments at this time. 3/7/2023 8:08:36 PM
Falcon Fire Protection District
3/6/2023 11:02:21 AM
Falcon Fire has reviewed the proposed Grandview Reserve 1041 new water and wastewater system. Falcon Fire has no objection or concerns with this plan. All future hydrant and water distribution designs will be reviewed by Falcon Fire prior to final plat approvals. All fire flow and hydrant distribution shall meet the minimum fire code as adopted and amended at time of installation. 3/6/2023 11:02:21 AM
Cherokee Metro Dist
3/2/2023 3:53:13 PM
CMD appreciates the opportunity to review regional water and wastewater projects but has no comments at this time. 3/2/2023 3:53:13 PM
Colorado Parks and Wildlife
3/2/2023 2:51:52 PM
CPW appreciates the opportunity to comment on the Grandview Reserve 1041 new water and wastewater project plan. CPW is familiar with the site and has commented in the past about the project. CPW wants to recognize and appreciate that many of our comments have been taken into consideration, and have been adapted to the project plan. CPW feels, with the consideration of previous comments, that the impacts to wildlife will be minimal. 3/2/2023 2:51:52 PM
View Colorado Department of Public Health and Environment
3/1/2023 11:17:15 AM
See attached auto responder from CDPHE 3/1/2023 11:17:15 AM
View EPC Parks Department
2/28/2023 3:50:27 PM
El Paso County Parks and Community Services Administrative Final Comments, 2nd Submittal - Please See Attached Document (No PAB Necessary for 1041 Permit Reviews) 2/28/2023 3:50:27 PM
View Colorado Division of Water Resources
2/27/2023 4:25:45 PM
See attached letter. 2/27/2023 4:25:45 PM
Black Forest Land Use Committee
2/25/2023 9:33:48 AM
Grandview Reserve is outside the Black Forest Land Use Committee area of interest so we will not be providing any inputs to this application. 2/25/2023 9:33:48 AM
View EPC Environmental Services
2/22/2023 3:02:05 PM
2/22/2023 3:02:05 PM
Mountain View Electric Association, Inc.
2/21/2023 4:26:07 PM
Mountain View Electric Association has no objection to the current plan. No comment at this time. 2/21/2023 4:26:07 PM
View Colorado Department of Public Health and Environment
2/14/2022 11:46:44 AM
Standard Comments from CDPHE apply. Comments attached. 2/14/2022 11:46:44 AM
PCD Project Manager
2/14/2022 9:26:49 AM
Planning AND Engineering Staff have determined that section 6.201 Flood Plain is NOT applicable because the 50% impervious surface thresh hold is NOT met; calculations are about 43% . 2 14 2022 9 : 26 am 2/14/2022 9:26:49 AM
PCD Project Manager
2/14/2022 7:21:59 AM
Please revise the noted exhibits within the comment letters and the sections of the 1041. 2/14/2022 7:21:59 AM
View PCD Project Manager
2/14/2022 8:04:22 AM
Section 2.301 comments review 2 2/14/2022 8:04:22 AM
View PCD Project Manager
2/14/2022 7:18:07 AM
MDDP comments 2/14/2022 7:18:07 AM
View PCD Project Manager
2/14/2022 7:17:34 AM
Traffic report comments 2/14/2022 7:17:34 AM
View PCD Project Manager
2/14/2022 8:03:59 AM
Section 3.201 Comments review 2 2/14/2022 8:03:59 AM
View PCD Project Manager
2/14/2022 7:16:04 AM
Section 4.201 Comments review 2 2/14/2022 7:16:04 AM
View PCD Project Manager
2/14/2022 7:15:27 AM
Planning Comment letter review 2 2/14/2022 7:15:27 AM
View PCD Project Manager
2/14/2022 7:14:10 AM
Application Exhibit B _V2 comments 2/14/2022 7:14:10 AM
View PCD Engineering Division
2/11/2022 3:35:51 PM
(1041 Report redlines) 2/11/2022 3:35:51 PM
View PCD Engineering Division
2/11/2022 3:35:03 PM
See comment letter and redlines.

Charlene Durham / Jeff Rice
719-520-7951 / 719-520-7877
2/11/2022 3:35:03 PM
Woodmen Hills Metro
2/3/2022 8:07:44 AM
Woodmen Hills has no comments. 2/3/2022 8:07:44 AM
Falcon Fire Protection District
2/2/2022 12:51:48 PM
no comments provided by fire. 2/2/2022 12:51:48 PM
County Attorney - Development Review
2/1/2022 11:14:08 AM
No comments from County Attorney's Office at this time. 2/1/2022 11:14:08 AM
Colorado Parks and Wildlife
1/31/2022 4:42:02 PM
CPW appreciates the opportunity to comment. CPW has previously commented on the Sketch Plan of the project and mentioned our suggestions for construction around riparian areas. Please reference our comments there.

Please feel free to contact District Wildlife Manager, Aaron Berscheid, should you have any questions or require additional information at 719-439-9601 or via email at aaron.berscheid@state.co.us
1/31/2022 4:42:02 PM
Mountain View Electric Association, Inc.
1/31/2022 11:24:32 AM
Mountain View Electric Association has no objection to the current plan. No comment at this time. 1/31/2022 11:24:32 AM
View EPC Parks Department
1/28/2022 12:22:38 PM
El Paso County Community Services / Parks Final Comments - Please See Attached Documents (Administrative Comments Only - No PAB Endorsement Necessary) 1/28/2022 12:22:38 PM
View Upper Black Squirrel Creek GWMD
1/28/2022 11:30:29 AM
1/28/2022 11:30:29 AM
Colorado Geological Survey
1/27/2022 8:21:37 AM
The Grandview Reserve development proposes up to 3260 residential units at varying densities, institutional use (i.e., potential church site), and parks & open space on 768 acres. In support of the development, water infrastructure is planned, consisting of source water wells, water treatment facilities, water storage tanks, and associated piping. The site does not contain any geologic hazards or unusual geotechnical constraints that preclude the proposed water and wastewater system. CTL’s Preliminary Geotechnical Investigation, Grandview Reserve (December 23, 2020), provides a valid description of surface and subsurface conditions and soil and bedrock engineering properties. CTL states on page 5, “Geologic hazards at the site include expansive soils and bedrock and areas of shallow groundwater.” Provided CTL’s recommendations are adhered to and subsurface soil investigations are performed for proposed structures associated with the new water and wastewater facility (lift stations, water storage tanks, treatment facilities, etc.), CGS has no objection to the project as planned.

Submitted 1/27/2022 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu)
1/27/2022 8:21:37 AM
Cherokee Metro Dist
1/21/2022 9:42:54 AM
1041 Documents Related to 3.201 (Items 1 - 4)
Page 1 paragraph starting with " The Arapahoe and Laramie Fox Hill Water .."
- 3rd sentence: " CMD currently has a replacement plan filed with the State." Cherokee is pursuing a Replacement Plan and will be refiling our application in the near future.
- 4th Sentence: "making the water available for use (add: subject to the conditions of the Replacement Plan).
1/21/2022 9:42:54 AM
View EPC Environmental Services
1/20/2022 9:22:31 AM
1/20/2022 9:22:31 AM
View US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
1/19/2022 2:56:38 PM
The U.S. Fish and Wildlife Service (Service) has reviewed the documents associated with the new water and wastewater system for the Grandview Reserve development. Consistent with our determinations of September 28, 2021 (attached) and April 29, 2020, the Service has no concerns with this project resulting in impacts to species listed as candidate, proposed, threatened, or endangered.. 1/19/2022 2:56:38 PM
View Colorado Division of Water Resources
1/18/2022 4:15:04 PM
See attached letter. 1/18/2022 4:15:04 PM
Black Forest Land Use Committee
1/14/2022 1:59:58 PM
Grandview Reserve is outside the Black Forest planning area so the Land Use Committee will not be providing input to this project. 1/14/2022 1:59:58 PM
View El Paso County Conservation Dist
1/11/2022 11:22:33 AM
1/11/2022 11:22:33 AM
View El Paso County Conservation Dist
1/11/2022 11:22:00 AM
1/11/2022 11:22:00 AM
View PCD Project Manager
10/19/2021 1:28:43 PM
Application Exhibit B Redlines 10/19/2021 1:28:43 PM
View PCD Project Manager
10/19/2021 1:28:09 PM
1041 chapter redlines : 2.301; 3.201; 4.201; 6.201 combines as they were submitted that way. Each chapter should be broken out and uploaded to the individual line item in EDARP for that section. 10/19/2021 1:28:09 PM
View PCD Project Manager
10/19/2021 1:26:12 PM
Preapplication Review comments 10/19/2021 1:26:12 PM