Project Review Comments

Back to List


Project Name
Matika CDR
Description
Construction Drawings and new SIA for infrastructure that was never completed with original final plat
Location
Parcels
5132001061 5132001061 5132001062 5132001062 5132001063 5132001063 5132001064 5132001064 5132001065 5132001065 5132001066 5132001066 5132001067 5132001067
Applicant
Jordan Savage
Jordan Savage ( jsavage@goodwinknight.com )
(719) 649-5266
Jordan Savage ( jsavage@goodwinknight.com )
(719) 649-5266
EA Number
EA2129
File Number
CDR213
Project Manager
Ryan Howser
Status
Closed
Created
3/2/2021 4:13:23 PM

View: Project Documents



Review Comments (19)

Link Agency Comment
County Attorney - Development Review
7/11/2021 4:06:00 PM
Proposed changes to SIA are acceptable, and no further changes are requested. 7/11/2021 4:06:00 PM
PCD Engineering Division
7/8/2021 4:43:04 PM
PCD Engineering comments have been resolved. The engineering documents will be uploaded onto EDARP once approved by the ECM administrator.

Daniel Torres on behalf of Lupe Packman
danieltorres@elpasoco.com
7/8/2021 4:43:04 PM
PCD Project Manager
7/6/2021 3:57:58 PM
Planning Division has no comments at this time. 7/6/2021 3:57:58 PM
Mountain View Electric Association, Inc.
7/6/2021 12:12:54 PM
See comment letter dated May 12, 2021. No additional comments at this time. 7/6/2021 12:12:54 PM
EPC Stormwater Review
6/30/2021 9:48:24 AM
Review 2: EPC Stormwater comments have been resolved on the following documents:
- Drainage Letter
- ESQCP
- GEC Plan
- GEC Checklist
- PBMP Applicability Form
- SWMP Checklist
- SWMP

EPC Stormwater has no further comments at this time. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
6/30/2021 9:48:24 AM
View PCD Project Manager
5/20/2021 3:38:36 PM
PCD Engineering - letter of intent comments attached. 5/20/2021 3:38:36 PM
View PCD Project Manager
5/20/2021 3:38:19 PM
EPC Stormwater - GEC plan comments attached. 5/20/2021 3:38:19 PM
View PCD Project Manager
5/20/2021 3:37:05 PM
PCD Engineering - FAE comments attached. 5/20/2021 3:37:05 PM
View PCD Project Manager
5/20/2021 3:36:40 PM
EPC Stormwater - ESQCP comments attached. 5/20/2021 3:36:40 PM
View PCD Project Manager
5/20/2021 3:34:24 PM
PCD Engineering & EPC Stormwater - comments on drainage letter attached. 5/20/2021 3:34:24 PM
View PCD Project Manager
5/20/2021 3:31:52 PM
PCD Engineering - Construction drawing comments attached. 5/20/2021 3:31:52 PM
PCD Engineering Division
5/20/2021 9:46:35 AM
Review 1 comments will be uploaded by the project manager. Comments on the following documents should be addressed:

-Construction drawings
-FAE
-Letter of intent
-Drainage letter

Reviewed by:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
5/20/2021 9:46:35 AM
View EPC Stormwater Review
5/14/2021 11:03:34 AM
SWMP_V1 5/14/2021 11:03:34 AM
View EPC Stormwater Review
5/14/2021 11:02:57 AM
SWMP Checklist_V1 5/14/2021 11:02:57 AM
View EPC Stormwater Review
5/14/2021 11:02:44 AM
PBMP Applicability Form_V1 5/14/2021 11:02:44 AM
View EPC Stormwater Review
5/14/2021 11:02:26 AM
GEC Checklist_V1 5/14/2021 11:02:26 AM
EPC Stormwater Review
5/14/2021 11:02:09 AM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Letter....(to be uploaded by PM with PCD comments)
- ESQCP...................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- PBMP Applicability Form
- SWMP Checklist
- SWMP

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
5/14/2021 11:02:09 AM
View Mountain View Electric Association, Inc.
5/13/2021 11:35:22 AM
See attached comments 5/13/2021 11:35:22 AM
View County Attorney - Development Review
5/5/2021 1:42:06 PM
Comments to SIA attached. 5/5/2021 1:42:06 PM