Project Name
Saddlehorn Water System Site Dev plan
Description
Water System Includes- Well house, Pump Station, Booster, Treatment, and Water lines 6-12" Parcels will need to be updated after plat recordation.
Location
Parcels
4300000554 4300000554 4300000556 4300000556 4300000562 4300000562 4300000599 4300000599 4300000600 4300000600 4300000601 4300000601 4300000602 4300000602
Applicant
JDS-Hydro Consultants, Inc.
Gina Mangino ( gmangino@jdshydro.com )
(719) 227-0072 x107
Gina Mangino ( gmangino@jdshydro.com )
(719) 227-0072 x107
File Number
PPR2120
Project Manager
Mercedes Rivas
Status
Closed
Created
2/26/2021 9:31:49 AM

View: Project Documents



Review Comments (38)

Link Agency Comment
PCD Project Manager
9/9/2021 9:00:07 AM
Prepping item for approval. Site plan sent to supervisor for approval. 9/9/2021 9:00:07 AM
County Attorney - Development Review
9/8/2021 8:37:09 PM
The Detention Maintenance Agreement submitted is the one that was ultimately recorded with the final plat. If no detention basin/BMPs in addition to those included in that DMA are proposed for this site development plan, then no new DMA is needed. If additional BMPs are being proposed, then please update this draft to identify only those. 9/8/2021 8:37:09 PM
PCD Project Manager
9/8/2021 4:50:32 PM
Pending County Attorney comments. 9/8/2021 4:50:32 PM
EPC Stormwater Review
8/25/2021 10:10:54 AM
Review 2: EPC Stormwater comments have been resolved on the following documents:
- SWMP
- SWMP Checklist

For the final submittal, please remove the Soils Report from the end of the GEC Plan.

EPC Stormwater has no further comments at this time. Thank you.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
8/25/2021 10:10:54 AM
PCD Project Manager
8/18/2021 4:40:10 PM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- SWMP
- SWMP Checklist

EPC Stormwater comments have been resolved on the following documents:
- Drainage Report
- FAE
- GEC Plan
- GEC Checklist
- PBMP Applicability Form

Please note for future projects: we have revised versions of our SWMP and GEC Checklists available for download on our website linked below. The content (all checklist rows/items) are the same, but the formatting has been updated to be more user-friendly. They are now fillable PDF's.
https://publicworks.elpasoco.com/stormwater/

For the final submittal, please remove the Soils Report from the end of the GEC Plan and upload the Soils Report as a separate doc on EDARP.


Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
8/18/2021 4:40:10 PM
View PCD Project Manager
8/18/2021 4:39:27 PM
SWMP_v2 redlines 8/18/2021 4:39:27 PM
View PCD Project Manager
8/18/2021 4:39:11 PM
SWMP checklist redlines 8/18/2021 4:39:11 PM
View PCD Project Manager
8/2/2021 5:58:05 PM
Last remaining comment is from previous set of redlines. 8/2/2021 5:58:05 PM
County Attorney - Development Review
7/12/2021 10:58:07 PM
Does this application require a detention maintenance agreement separate from that needed for the subdivision final plat? If so, please make sure you are using the correct template for owner/metro district (I assume the Metro District will maintain the detention pond/bmps). Make sure the template is filled out consistently throughout (the owner identified in the agreement you uploaded is different from the one named in the signature block), and identify the number of detention basin/bmps being constructed for this site development plan. 7/12/2021 10:58:07 PM
View PCD Project Manager
7/12/2021 4:44:05 PM
Site Development Plan_v2 redlines 7/12/2021 4:44:05 PM
View PCD Project Manager
7/12/2021 4:43:34 PM
Elevation Plans_v2 redlines 7/12/2021 4:43:34 PM
View PCD Project Manager
7/12/2021 4:42:32 PM
Application-Petition Form_v2 redlines 7/12/2021 4:42:32 PM
PCD Engineering Division
7/12/2021 1:38:20 PM
There are no additional PCD Engineering comments relating to drainage or transportation. All comments have been resolved.

Reviewed by:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
7/12/2021 1:38:20 PM
Mountain View Electric Association, Inc.
7/12/2021 1:09:37 PM
See comment letter dated April 22, 2021. No additional comments at this time 7/12/2021 1:09:37 PM
Pikes Peak Regional Building Department
7/12/2021 11:53:22 AM
No further comment.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
7/12/2021 11:53:22 AM
View EPC Stormwater Review
7/6/2021 12:09:37 PM
SWMP_v2 7/6/2021 12:09:37 PM
View EPC Stormwater Review
7/6/2021 12:09:19 PM
SWMP Checklist_v2 7/6/2021 12:09:19 PM
EPC Stormwater Review
7/6/2021 12:20:29 PM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- SWMP
- SWMP Checklist

EPC Stormwater comments have been resolved on the following documents:
- Drainage Report
- FAE
- GEC Plan
- GEC Checklist
- PBMP Applicability Form

Please note for future projects: we have revised versions of our SWMP and GEC Checklists available for download on our website linked below. The content (all checklist rows/items) are the same, but the formatting has been updated to be more user-friendly. They are now fillable PDF's.
https://publicworks.elpasoco.com/stormwater/

For the final submittal, please remove the Soils Report from the end of the GEC Plan and upload the Soils Report as a separate doc on EDARP.

Mercedes - please request the Soils Report through the EDARP system.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
7/6/2021 12:20:29 PM
Falcon Fire Protection District
4/28/2021 10:11:39 AM
no fire objections or concerns with this development plan. One new hydrant to be located on site. 4/28/2021 10:11:39 AM
View PCD Project Manager
4/28/2021 8:13:39 AM
SWMP checklist_V1 redlines 4/28/2021 8:13:39 AM
View PCD Project Manager
4/28/2021 8:13:21 AM
Grading & Erosion Control checklist_V1 stormwater redlines 4/28/2021 8:13:21 AM
View PCD Project Manager
4/28/2021 8:12:52 AM
PBMP Applicability Form_V1 4/28/2021 8:12:52 AM
View PCD Project Manager
4/28/2021 8:12:22 AM
Site Development Plan_V1 redlines 4/28/2021 8:12:22 AM
View PCD Project Manager
4/28/2021 8:11:50 AM
Letter of Intent_V1 redlines 4/28/2021 8:11:50 AM
View PCD Project Manager
4/28/2021 8:11:26 AM
Landscape Plan drawings_V1 redlines 4/28/2021 8:11:26 AM
View PCD Project Manager
4/28/2021 8:10:56 AM
Grading & Erosion Control Plan_V1 redlines 4/28/2021 8:10:56 AM
View PCD Project Manager
4/28/2021 8:10:22 AM
Financial Assurance Forms_V1 redlines 4/28/2021 8:10:22 AM
View PCD Project Manager
4/28/2021 8:09:52 AM
Elevation Plans_V1 redlines 4/28/2021 8:09:52 AM
View PCD Project Manager
4/28/2021 8:09:27 AM
Drainage Report - Final_V1 redlines 4/28/2021 8:09:27 AM
View PCD Project Manager
4/28/2021 8:08:54 AM
Application-Petition Form_V1 redlines 4/28/2021 8:08:54 AM
View Mountain View Electric Association, Inc.
4/22/2021 2:33:41 PM
See attached comments 4/22/2021 2:33:41 PM
PCD Engineering Division
4/21/2021 9:05:54 AM
Review 1 comments will be uploaded by the project manager. The following documents have pending comments:

-Letter of intent
-Site development plan

Reviewed by:
Lupe Packman
lupepackman@elpasoco.com
4/21/2021 9:05:54 AM
Pikes Peak Regional Building Department
4/19/2021 11:52:14 AM
1. Zaragozan Trail street name has been eliminated. Oscuro Trail runs from the point of Curtis Road east into the development running east to south. From the north of this project is street name Truchas Trail to Curtis Road.
The address that has been assigned to the Saddlehorn Water Systems- treatment facility building is 14821 Oscuro Trail and the water tank is addressed as 14825 Oscuro Trail.
2. Fencing is 7’ no address or permit required based on height.

Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
4/19/2021 11:52:14 AM
View EPC Stormwater Review
4/19/2021 8:33:10 AM
PBMP Applicability Form_V1 4/19/2021 8:33:10 AM
View EPC Stormwater Review
4/19/2021 8:32:52 AM
GEC Checklist_V1 4/19/2021 8:32:52 AM
EPC Stormwater Review
4/20/2021 1:11:21 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report....(to be uploaded by PM with PCD comments)
- FAE........................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- PBMP Applicability Form

Per email sent to applicant on 4/15, please complete and upload a SWMP. Be sure to address every line item listed in the SWMP Checklist.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
4/20/2021 1:11:21 PM
County Attorney - Development Review
4/14/2021 10:36:02 PM
It appears that this site is now identified as Tract A of Filing No. 1, and that that tract will be conveyed to the Metro District. Please use the Detention Maintenance Agreement template for District maintenance and resubmit. 4/14/2021 10:36:02 PM
911 Authority - El Paso/Teller County
4/8/2021 8:24:38 AM
No new street names request. No action required by E911

G West
4/8/2021 8:24:38 AM