Project Review Comments

Back to List


Project Name
4815 Yucatan Gas Station
Description
Proposal to add gas station use to food mart property. Permitted principle use in CC district.
Location
Parcels
6501205016 6501205016
Applicant
BBKern DESIGNS LLC
Mitchell Hess ( Mitchell.Hess@kimley-horn.com ) Mitchell Hess ( Mitchell.Hess@kimley-horn.com )
File Number
PPR2217
Project Manager
HR Green EPC Consultant
Status
Active
Created
2/4/2021 3:54:40 PM

View: Project Documents



Review Comments (29)

Link Agency Comment
View EPC Stormwater Review
5/24/2022 8:53:32 AM
SWMP Checklist_v1 5/24/2022 8:53:32 AM
View EPC Stormwater Review
5/24/2022 8:52:40 AM
GEC Checklist_v1 5/24/2022 8:52:40 AM
View PCD Project Manager
5/23/2022 12:40:56 PM
Traffic Impact Study Redline 5/23/2022 12:40:56 PM
View PCD Project Manager
5/23/2022 12:40:19 PM
SWMP Checklist Redline 5/23/2022 12:40:19 PM
View PCD Project Manager
5/23/2022 12:39:48 PM
PBMP Applicability Form redline 5/23/2022 12:39:48 PM
View PCD Project Manager
5/23/2022 12:39:01 PM
Letter of Intent Redline 5/23/2022 12:39:01 PM
View PCD Project Manager
5/23/2022 12:38:22 PM
Landscape Plan Drawings Redline 5/23/2022 12:38:22 PM
View PCD Project Manager
5/23/2022 12:36:44 PM
Grading & Erosion Control Plan Redline 5/23/2022 12:36:44 PM
View PCD Project Manager
5/23/2022 12:36:00 PM
Grading and Erosion Control Checklist Redline 5/23/2022 12:36:00 PM
View PCD Project Manager
5/23/2022 12:34:57 PM
Erosion and Sediment Control Redline 5/23/2022 12:34:57 PM
View PCD Project Manager
5/23/2022 12:34:11 PM
Drainage Report redline 5/23/2022 12:34:11 PM
View PCD Project Manager
5/23/2022 12:33:28 PM
Site Development Redline 5/23/2022 12:33:28 PM
EPC Stormwater Review
5/24/2022 8:53:43 AM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- PBMP Applicability Form....(to be uploaded by PM with PCD comments)
- Drainage Report.................(to be uploaded by PM with PCD comments)
- GEC Plan...........................(to be uploaded by PM with PCD comments)
- GEC Checklist
- SWMP Checklist

Please include the following documents upon resubmittal:
- FAE
- O&M Manual
- MS4 Post Construction Form

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
5/24/2022 8:53:43 AM
View PCD Engineering Division
5/18/2022 5:30:27 PM
Please see engineer redlines and comments Traffic Impact Study Ver.1 5/18/2022 5:30:27 PM
View PCD Engineering Division
5/18/2022 5:29:50 PM
Please see engineer redlines and comments Site Dev Plan Ver.1 5/18/2022 5:29:50 PM
View PCD Engineering Division
5/23/2022 11:13:17 AM
Please see engineer redlines and comments PMBP Applicability Ver.1 5/23/2022 11:13:17 AM
View PCD Engineering Division
5/18/2022 5:28:43 PM
Please see engineer redlines and comments Letter of Intent Ver.1 5/18/2022 5:28:43 PM
View PCD Engineering Division
5/18/2022 5:28:10 PM
Please see engineer redlines and comments Landscape Drawings Ver.1 5/18/2022 5:28:10 PM
View PCD Engineering Division
5/23/2022 11:13:59 AM
Please see engineer redlines and comments GEC Plan Ver.1 5/23/2022 11:13:59 AM
View PCD Engineering Division
5/23/2022 11:12:44 AM
Please see engineer redlines and comments GEC Checklist Ver.1 5/23/2022 11:12:44 AM
View PCD Engineering Division
5/18/2022 5:26:18 PM
Please see engineer redlines and comments ESQCP Ver.1 5/18/2022 5:26:18 PM
View PCD Engineering Division
5/23/2022 11:11:39 AM
Please see engineer redlines and comments Drainage Report Ver.1 5/23/2022 11:11:39 AM
View PCD Engineering Division
5/18/2022 5:24:32 PM
Engineer Review Ver.1

Please see engineer redlines and comments on the following documents
Due to the nature and extent of the comments the resubmittal may need to be considered a first review and additional comments provided:

-Drainage Report
-ESQCP
-GEC Checklist
-GEC Plan
-FAE (requires the complete separate form)
-Landscape Drawings
-Letter of Intent
-PMPB Applicability Form
-Site Development Plan
-Traffic Report

Thank you
Edward B. Schoenheit
Engineer I Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
5/18/2022 5:24:32 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/4/2022 3:05:11 PM
Ryan, the customer will need to submit a Preliminary Utility and Public Facility Plan on the next submittal CSU has no water or wastewater to this site but we do have gas and electric to this site. I also made this comment on the website for thanks Al 5/4/2022 3:05:11 PM
Pikes Peak Regional Building Department
5/3/2022 11:56:24 AM
1. How tall is the new dumpster enclosure? If over 7’ in height a separate address and permit will be required.
2. Please use the following addresses when submitting plans to PPRBD for permit, 4805 Yucatan Drive (diesel fuel canopy) and 4809 Yucatan Drive (fuel gas Canopy)
3. No further comments.

Thank you,

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
5/3/2022 11:56:24 AM
View Widefield SD 3
4/29/2022 8:27:46 AM
4/29/2022 8:27:46 AM
Colorado Springs Planning & Community Development
4/26/2022 12:23:59 PM
City Planning has no comments 4/26/2022 12:23:59 PM
View El Paso County Conservation Dist
4/25/2022 3:59:57 PM
EPCCD grass seed native shotgun mix info attached as a .jpg. 4/25/2022 3:59:57 PM
View El Paso County Conservation Dist
4/25/2022 3:59:33 PM
EPCCD brief comments attached as a .docx. 4/25/2022 3:59:33 PM