Project Review Comments

Back to List


Project Name
Upland Flats By Watermark Filing No. 1 PPR
Description
Multi-family Development PPR
Location
Parcels
5332404001 5332404001
Applicant
Jared Roberts - Kimley Horn
Jared Roberts ( jared.roberts@kimley-horn.com )
(719) 284-7273
Jared Roberts ( jared.roberts@kimley-horn.com )
(719) 284-7273
File Number
PPR217
Project Manager
John Green
Status
Closed
Created
1/28/2021 8:23:56 AM

View: Project Documents



Review Comments (63)

Link Agency Comment
View PCD Engineering Division
11/5/2021 2:28:49 PM
(Detention Basin Maintenance agreement with revisions and O&M attached) 11/5/2021 2:28:49 PM
View PCD Engineering Division
11/5/2021 2:30:32 PM
See comment memo (link at left) for reference. The following final/signed and stamped documents need to be submitted:

1. PDB-BMP Agreement (signed) in pdf format (submit as-is if the revisions are acceptable)

-- Jeff Rice - 719-520-7877
11/5/2021 2:30:32 PM
PCD Project Manager
10/27/2021 3:57:39 PM
No additional Planning Comments 10/27/2021 3:57:39 PM
View PCD Engineering Division
10/27/2021 9:31:34 AM
See comment memo (link at left) for reference. The following final/signed and stamped documents need to be submitted:

1. GEC Plan
2. FDR
3. Proof of embankment submittal to the State Engineer / Dam Permit
4. PDB-BMP Agreement (current template) in Word doc AND pdf format if signed

-- Jeff Rice - 719-520-7877
10/27/2021 9:31:34 AM
View EPC Stormwater Review
10/25/2021 2:03:29 PM
GEC_v4 10/25/2021 2:03:29 PM
EPC Stormwater Review
10/25/2021 4:46:00 PM
Review 4: EPC Stormwater comments have been provided on the following uploaded documents:
- GEC Plan (minor comments)


Reviewed by:
Christina Prete, PE
Stormwater Engineer III
christinaprete@elpasoco.com
10/25/2021 4:46:00 PM
Colorado Springs Airport Advisory Commission
10/25/2021 9:36:35 AM
Airport staff has no additional comments to provide on this item. 10/25/2021 9:36:35 AM
View County Attorney - Development Review
10/14/2021 6:45:17 PM
Proposed changes to Detention Maintenance Agreement attached. 10/14/2021 6:45:17 PM
Mountain View Electric Association, Inc.
10/14/2021 12:16:24 PM
See comment dated March 12, 2021 and letter dated June 23, 2021. No additional comments at this time. 10/14/2021 12:16:24 PM
Cherokee Metro Dist
10/7/2021 2:54:37 PM
Sheet 600 Utility Cover Sheet - Engineer to send Cover Sheet for Cherokee signature. Signed Cover Sheet to be added to EDARP review plans.

Sheet 601? (not labeled in Title Block), WATER - Add the following note: ALL ISOLATION VALVES TO OPEN CCW.

Sheets 604-607 WATER SERVCIE LINE NOTES, Note 3: replace CSU Detail B2-2 reference with Cherokee Detail References B1-9 or B1-11A
10/7/2021 2:54:37 PM
PCD Project Manager
9/2/2021 5:32:16 PM
No additional planning comments 9/2/2021 5:32:16 PM
View PCD Engineering Division
8/31/2021 2:31:30 PM
(latest access permit conditions) 8/31/2021 2:31:30 PM
View PCD Engineering Division
8/31/2021 2:28:04 PM
(PDB-BMP Agreement template) 8/31/2021 2:28:04 PM
View PCD Engineering Division
8/31/2021 2:27:31 PM
(CD redline pages) 8/31/2021 2:27:31 PM
View PCD Engineering Division
8/31/2021 2:31:49 PM
See comment memo (link at left) for reference. The following final/signed and stamped documents need to be submitted:

1. GEC Plan
2. FAE
3. CDs
4. SDI Data Sheets
5. Proof of embankment submittal to the State Engineer / Dam Permit
6. PDB-BMP Agreement (current template) in Word doc AND pdf format if signed
7. Escrow agreement
8. CAD base drawing of public improvements/storm drain in ROW with 2 survey ties

-- Jeff Rice - 719-520-7877
8/31/2021 2:31:49 PM
View EPC Stormwater Review
8/26/2021 5:26:19 PM
FAE_v3 8/26/2021 5:26:19 PM
View EPC Stormwater Review
8/26/2021 5:23:58 PM
GEC_v3 8/26/2021 5:23:58 PM
EPC Stormwater Review
8/26/2021 5:22:44 PM
Review 3: EPC Stormwater comments have been provided on the following uploaded documents:
- GEC Plan
- FAE

Stormwater comments have been resolved on the following document:
- Construction Drawings

Reviewed by:
Christina Prete, PE
Stormwater Engineer III
christinaprete@elpasoco.com
8/26/2021 5:22:44 PM
PCD Project Manager
7/20/2021 9:30:43 AM
No additional Planning comments. Application is pending approval. 7/20/2021 9:30:43 AM
View PCD Project Manager
6/30/2021 5:46:20 PM
Please see redline comments on Lighting Plan 6/30/2021 5:46:20 PM
View PCD Project Manager
6/30/2021 5:45:45 PM
Please see redline comments on Noise Study 6/30/2021 5:45:45 PM
View PCD Project Manager
6/30/2021 5:43:34 PM
Please see redline comments on GEC Plan 6/30/2021 5:43:34 PM
View PCD Project Manager
6/30/2021 5:42:38 PM
Please see redline comments on FAE 6/30/2021 5:42:38 PM
View PCD Project Manager
6/30/2021 5:42:04 PM
Please see redline comments on Drainage Report 6/30/2021 5:42:04 PM
View PCD Project Manager
6/30/2021 5:41:26 PM
Please see redline comments on Construction Drawings 6/30/2021 5:41:26 PM
PCD Project Manager
6/29/2021 10:02:42 AM
Review comments will be uploaded once PCD Engineering ahs completed their review. 6/29/2021 10:02:42 AM
View Cherokee Metro Dist
6/28/2021 11:23:32 AM
see Drawing mark up attached 6/28/2021 11:23:32 AM
EPC Stormwater Review
6/29/2021 2:18:34 PM
Review 2: EPC Stormwater comments have been provided on the following uploaded documents:
- Construction Drawings (to be uploaded by PM with PCD comments)
- GEC Plan (to be uploaded by PM with PCD comments)
- FAE (to be uploaded by PM with PCD comments)

Stormwater comments have been resolved on the following documents:
- ESQCP
- SWMP
- PBMP Applicability Form

Reviewed by:
Christina Furchak
Stormwater Engineer III
christinafurchak@elpasoco.com
6/29/2021 2:18:34 PM
View PCD Engineering Division
6/27/2021 1:18:57 PM
See comment letter for reference. The Traffic Memo and FDR have been accepted for the final plat file.

-- Jeff Rice - 719-520-7877
6/27/2021 1:18:57 PM
Pikes Peak Regional Building Department
6/25/2021 7:09:58 AM
Hello:

1. Plans for this project have been submitted.
2. It appears all comments have been addressed, no further comments.

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
6/25/2021 7:09:58 AM
View Mountain View Electric Association, Inc.
6/23/2021 3:01:03 PM
See attached comments 6/23/2021 3:01:03 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/8/2021 9:47:19 AM
Hey Sophie,

CSU has no action items and approval can be recommended.

Thanks,

Ryne Solberg
rsolberg@csu.org
6/8/2021 9:47:19 AM
Central Marksheffel Metro
4/7/2021 12:03:06 PM
Central Marksheffel Metropolitan District:
This property is located within the Central Marksheffel Metropolitan District
The District assess’ building permit fees for new development in the District, the District also assess’ a mill levy on property within the District Boundaries.

The Fees for 2020 are:
Building Permit Fees:
Commercial:
Industrial/ Agricultural - $1.50/ square foot
Lodging/ Land - $200/ Room
Recreational/ institutional/ medical/ Office/ Retail - $2.00/ square foot
Residential:
Single Family - $$1,914/ Unit
Multi Family - $1,172/ Unit
Pronghorn Meadows Filings 2 & 3 - $246.70/ Unit
4/7/2021 12:03:06 PM
View PCD Project Manager
3/26/2021 4:45:29 PM
Please see attached comments to construction drawings. 3/26/2021 4:45:29 PM
View PCD Project Manager
3/26/2021 4:44:29 PM
Please see attached comments to application. 3/26/2021 4:44:29 PM
View PCD Project Manager
3/26/2021 4:43:48 PM
Please see attached comments to drainage report. 3/26/2021 4:43:48 PM
View PCD Project Manager
3/26/2021 4:42:51 PM
Please see attached comments to elevations. 3/26/2021 4:42:51 PM
View PCD Project Manager
3/26/2021 4:40:47 PM
Please see attached comments to GEC plan. 3/26/2021 4:40:47 PM
View PCD Project Manager
3/26/2021 4:38:56 PM
Please see attached comments to landscape plans. 3/26/2021 4:38:56 PM
View PCD Project Manager
3/26/2021 4:38:25 PM
Please see attached comments to LOI. 3/26/2021 4:38:25 PM
View PCD Project Manager
3/26/2021 4:38:07 PM
Please see attached comments to lighting plan. 3/26/2021 4:38:07 PM
View PCD Project Manager
3/26/2021 4:37:38 PM
Please see attached comments to mineral rights cert. 3/26/2021 4:37:38 PM
View PCD Project Manager
3/26/2021 4:36:06 PM
Please see attached comments to noise study. 3/26/2021 4:36:06 PM
View PCD Project Manager
3/26/2021 4:35:29 PM
Please see attached comments to sign plan. 3/26/2021 4:35:29 PM
View PCD Project Manager
3/26/2021 4:34:58 PM
Please see attached comments to SDP. 3/26/2021 4:34:58 PM
View PCD Project Manager
3/26/2021 4:32:52 PM
Please see attached comments to title commitment. 3/26/2021 4:32:52 PM
View PCD Engineering Division
3/26/2021 2:05:59 PM
(O&M redlines) 3/26/2021 2:05:59 PM
View PCD Engineering Division
3/26/2021 2:02:06 PM
(FAE redlines) 3/26/2021 2:02:06 PM
View PCD Engineering Division
3/26/2021 2:00:28 PM
(ESQCP redlines) 3/26/2021 2:00:28 PM
View PCD Engineering Division
3/26/2021 1:59:07 PM
See comment letter and redlines.
Resubmittal items include:
- Site Development Plan
- CDs
- GEC Plan
- GEC Checklist
- SWMP
- SWMP Checklist
- ESQCP
- PBMP Applicability Form
- O&M Manual
- FAE

-- Jeff Rice - 719-520-7877
3/26/2021 1:59:07 PM
PCD Project Manager
3/19/2021 5:05:45 PM
Planning comments will be provided pending completing of Engineering review. 3/19/2021 5:05:45 PM
Mountain View Electric Association, Inc.
3/12/2021 12:36:46 PM
Mountain View Electric Association (MVEA) has existing facilities within this parcel of land. MVEA requests that all existing easements are included in the plat. The Association will serve this area according to our extension policy. Information concerning connection requirements, fees, and upgrades under the Association’s line extension policy can be obtained by contacting the Association’s Engineering Department.

MVEA also requests all open space, drainage, and landscape tracts designed in this subdivision be listed to include utility easements, along with a twenty (20) foot boundary utility easement on plat. Additional easements may be required once a review of civil drawings with grading and erosion plan is provided to MVEA in order to serve.
3/12/2021 12:36:46 PM
View EPC Stormwater Review
3/11/2021 4:09:30 PM
PBMP Applicability Form_v1 3/11/2021 4:09:30 PM
View EPC Stormwater Review
3/11/2021 4:04:05 PM
SWMP Checklist_v1 3/11/2021 4:04:05 PM
View EPC Stormwater Review
3/11/2021 4:02:13 PM
SWMP_v1 3/11/2021 4:02:13 PM
View EPC Stormwater Review
3/11/2021 3:59:44 PM
GEC Checklist_v1 3/11/2021 3:59:44 PM
EPC Stormwater Review
3/11/2021 3:58:56 PM
Review 1: EPC Stormwater comments have been provided on the following uploaded documents:
- Construction Drawings (to be uploaded by PM with PCD comments)
- GEC Plan (to be uploaded by PM with PCD comments)
- Drainage Report (to be uploaded by PM with PCD comments)
- ESQCP (to be uploaded by PM with PCD comments)
- FAE (to be uploaded by PM with PCD comments)
- GEC Checklist
- SWMP
- SWMP Checklist
- PBMP Applicability Form

Reviewed by:
Christina Furchak
Stormwater Engineer III
christinafurchak@elpasoco.com
3/11/2021 3:58:56 PM
View Colorado Springs Airport Advisory Commission
3/9/2021 6:44:01 PM
The attached land use summary with comments will be presented at the March 24, 2021 Airport Advisory Commission meeting. 3/9/2021 6:44:01 PM
Pikes Peak Regional Building Department
3/9/2021 3:37:12 PM
1. When submitting a copy of this plan to Enumerations for addressing, we will need each secondary structure location such as, garages, carports, trash enclosures, (over 7’ in height), maintenance garages, mail kiosk, clubhouses etc to be highlighted/clouded. We need some kind of locator showing secondary structures as these structures will require a separate address and permit issued.
2. Is the mail kiosk in the clubhouse? Please clarify, also it appears there are two other buildings in the vicinity of the clubhouse, northwest side of site. Please show what the buildings are on the site plan, office and ??
3. When submitting the plans for review/permit issuance, the site plan will need to show the addressing for all buildings, with the buildings included in the submittal highlighted/clouded.
4. Secondary addressing; the floor plan for building type B and C are missing two unit numbers on second floor (206 and 208)
5. 3-Internal street names will be required for this type of development. Please have the street names approved by 911 Authority – El Paso/Teller County Street naming department, when resubmitting show the approved street names on the site plan. Once approved by E911, Enumerations will also need an approved street name list emailed to us beckya@pprbd.org


STANDARD DEVELOPMENT PLAN COMMENTS:
1. For assignment of addressing for lots and tracts, place addressing marker (xxx) where they are intended to be utilized. Lot marker placement to be front door.
2. Provide a 100 scale copy or larger of the entire APPROVED development to this department so that addressing can be assigned. Once received, the DP will be placed on a list to be addressed.

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 E: beckya@pprbd.org
3/9/2021 3:37:12 PM
View Falcon Fire Protection District
3/9/2021 2:50:37 PM
3/9/2021 2:50:37 PM
View Cherokee Metro Dist
3/3/2021 9:29:55 AM
Cherokee comments on Drawings C3.1 through C3.6 3/3/2021 9:29:55 AM
View Cherokee Metro Dist
2/26/2021 5:05:25 PM
The Upland Flats By Watermark Filing No. 1 development is included in Cherokee Metro District's service area and Cherokee has adequate water and wastewater treatment capacity to serve this customer.

Comments on Water and Sanitary Drawings on the attached file.
2/26/2021 5:05:25 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/19/2021 1:39:08 PM
Hey Sophie,

Attached is the review memo for the subject application. There is one action item. Let me know if you need anything else from me.

Thanks,

Ryne Solberg
rsolberg@csu.org
2/19/2021 1:39:08 PM