Project Review Comments

Back to List


Project Name
CCMD Administration Building
Description
Site Development plan for new admin building.
Location
Parcels
5503400003 5503400003
Applicant
T-Bone Construction
Architect Marcos Cazares ( marcos.cazares@tboneconstruction.com )
(719) 570-1369
Architect Marcos Cazares ( marcos.cazares@tboneconstruction.com )
(719) 570-1369
EA Number
EA20182
File Number
PPR2151
Project Manager
Ryan Howser
Status
Closed
Created
1/21/2021 10:30:24 AM

View: Project Documents



Review Comments (48)

Link Agency Comment
View County Attorney - Development Review
7/20/2023 2:19:47 PM
My signature to the DMA is attached. I've also attached a new p.3 of the agreement. I had inadvertently deleted "shall construct on" after "Metro District" at the very beginning of paragraph 3. This new page reinserts that language. 7/20/2023 2:19:47 PM
View County Attorney - Development Review
7/11/2023 2:50:45 PM
Proposed edits to Detention Maintenance Agreement attached. 7/11/2023 2:50:45 PM
PCD Engineering Division
6/27/2023 4:54:10 PM
Engineer Review Ver.5

Please send signed GEC Plan V5 with engineer and owner signatures.
Project routed for County Engineer Approval
Email sent to applicant for signatures
No further engineer comments.

Thank you.
Edward B. Schoenheit
Engineer I Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
719-502-9659 (C)
6/27/2023 4:54:10 PM
PCD Project Manager
6/27/2023 4:11:43 PM
Planning Division has no comments. 6/27/2023 4:11:43 PM
EPC Stormwater Review
6/27/2023 12:36:41 PM
All Stormwater comments have been addressed. 6/27/2023 12:36:41 PM
View EPC Stormwater Review
5/1/2023 1:59:52 PM
GEC_v4 5/1/2023 1:59:52 PM
PCD Project Manager
4/27/2023 4:17:40 PM
Planning Division has no comments. 4/27/2023 4:17:40 PM
EPC Stormwater Review
5/1/2023 1:58:10 PM
Review 4: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- GEC Plan

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
5/1/2023 1:58:10 PM
PCD Engineering Division
4/27/2023 11:10:18 AM
Engineer Review Ver.4

- GEC Plan V4 Please provide owner signature
- FAE V4 Please provide owner signature

No further engineer comments.

Thank you.
Edward B. Schoenheit
Engineer I Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
719-502-9659 (C)
4/27/2023 11:10:18 AM
View EPC Stormwater Review
2/26/2023 7:26:01 PM
SDI_v3 2/26/2023 7:26:01 PM
View EPC Stormwater Review
2/26/2023 7:25:46 PM
FAE_v3 2/26/2023 7:25:46 PM
View EPC Stormwater Review
2/26/2023 7:25:26 PM
Drainage Report_v3 2/26/2023 7:25:26 PM
View EPC Stormwater Review
2/26/2023 7:24:30 PM
GEC_v3 2/26/2023 7:24:30 PM
EPC Stormwater Review
2/26/2023 7:24:01 PM
Review 3: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- GEC Plan.............(uploaded with PCD comments)
- Drainage Report...(uploaded with PCD comments)
- FAE.......................(uploaded with PCD comments)
- SDI

Please sign and resubmit the following documents:
- ESQCP

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
2/26/2023 7:24:01 PM
View PCD Engineering Division
2/21/2023 6:22:33 PM
Site Development Plan V3 2/21/2023 6:22:33 PM
PCD Engineering Division
2/21/2023 6:17:12 PM
Engineer Review Ver.3

Please address redline comments on the following documents.
- Site Development Plan V3 (Please correct missing signage and east ramp comments outstanding from SDP V2) Uploaded by Engineering
- GEC Plan V3 (sent/dated 17 FEB) Please address missing design detail comments outstanding from GEC V2. To be uploaded by Stormwater
- FAE V3 Please add missing signage line items from the SDP V2 and V3 comments. To be uploaded by Stormwater

-Stormwater may have additional comments on the GEC Plan, FDR, or FAE.
-Planner please allow 1 week for re-review.

Comments resolved on the following documents:
- Drainage Report V3


Thank you.
Edward B. Schoenheit
Engineer I Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
719-502-9659 (C)
2/21/2023 6:17:12 PM
Pikes Peak Regional Building Department
2/14/2023 9:02:40 AM
It appears all comments have been addressed. No further comment.

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
2/14/2023 9:02:40 AM
PCD Project Manager
2/8/2023 8:12:17 AM
Planning Division has no further comments. 2/8/2023 8:12:17 AM
View PCD Project Manager
12/13/2022 8:29:45 AM
PCD Planning and PCD Engineering comments - site development plan 12/13/2022 8:29:45 AM
View PCD Project Manager
12/13/2022 8:29:18 AM
PCD Planning comments - lighting plan 12/13/2022 8:29:18 AM
View EPC Stormwater Review
12/11/2022 2:17:13 PM
Drainage Report_v2 12/11/2022 2:17:13 PM
View EPC Stormwater Review
12/11/2022 2:16:26 PM
GEC_v2 12/11/2022 2:16:26 PM
View EPC Stormwater Review
12/11/2022 2:15:55 PM
ESQCP_v2 12/11/2022 2:15:55 PM
EPC Stormwater Review
12/11/2022 2:10:17 PM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- ESQCP (uploaded the latest version of the form for signature)
- GEC Plan
- Drainage Report

Please provide the following documents on resubmittal:
- FAE
- MS4 Post Construction Form
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement
- SDI

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
12/11/2022 2:10:17 PM
View PCD Engineering Division
12/6/2022 11:28:13 AM
Attached is a template of the pond maintenance agreement to be completed and submitted by the applicant. 12/6/2022 11:28:13 AM
PCD Engineering Division
12/7/2022 11:29:23 AM
Engineer Review Ver.2

Please address redline comments on the following documents
- Site Development Plan V2 (to be uploaded by PM)
- Drainage Report V2
- GEC V2

Please submit the following documents:
- Financial Assurance Estimate Form (missing)
- Pond Maintenance Agreement For Recording (missing)
- SDI Worksheet
- MS4 Post Construction Form
- Copy of the State non-jurisdictional water impoundment application form that needs to be submitted to the Colorado Division of Water Resources. Upload the state receipt/response once it's available.

Comments are resolved on the following documents:
- Letter of Intent
- Lighting Plans


NOTE:
- The 2022 Financial Assurance Estimate (FAE) Form is available for download at https://planningdevelopment.elpasoco.com/planning-development-forms/#1584029763943-19bc4c03-3586.
The FAE will need to be updated to the 2023 FAE form if final approval of the application occurs after January 1, 2023. The 2023 FAE should be available by mid December. Contact the review engineer for a copy of the 2023 FAE document at that time.

- MS4 Post Construction Form is available for download at https://publicworks.elpasoco.com/stormwater/

Thank you.
Edward B. Schoenheit
Engineer I Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
719-502-9659 (C)
12/7/2022 11:29:23 AM
Pikes Peak Regional Building Department
12/2/2022 11:00:18 AM
1. Please change all site development plan pages to show the address for the admin building, it appears they still show the address of the existing building. The admin building address is 9686 Flagstone Street.
2. Trash enclosure is under 7’ in height and will not require a separate address and permit.
3. Please email Becky Allen (beckya@pprbd.org) clarifying if the existing fence (9676 Flagstone Street) will remain.

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
12/2/2022 11:00:18 AM
View EPC Health Department
11/13/2021 9:22:20 PM
11/13/2021 9:22:20 PM
View EPC Stormwater Review
10/28/2021 7:25:52 PM
ESQCP_v1 10/28/2021 7:25:52 PM
View EPC Stormwater Review
10/28/2021 7:24:55 PM
O&M_v1 10/28/2021 7:24:55 PM
View EPC Stormwater Review
10/28/2021 7:24:36 PM
SWMP Checklist_v1 10/28/2021 7:24:36 PM
View EPC Stormwater Review
10/28/2021 7:24:07 PM
SWMP_v1 10/28/2021 7:24:07 PM
View EPC Stormwater Review
10/28/2021 7:23:37 PM
GEC Checklist_v1 10/28/2021 7:23:37 PM
View EPC Stormwater Review
10/28/2021 7:23:15 PM
GEC_v1 10/28/2021 7:23:15 PM
EPC Stormwater Review
10/28/2021 7:22:20 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- GEC Plan
- GEC Checklist
- SWMP
- SWMP Checklist
- ESQCP
- O&M Manual

Please provide the following documents on resubmittal:
- FAE
- MS4 Post Construction Form
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement
- SDI

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
10/28/2021 7:22:20 PM
PCD Project Manager
10/28/2021 10:09:58 AM
Please note that additional comments on engineering documents may be provided pursuant to EPC Stormwater review. 10/28/2021 10:09:58 AM
View PCD Project Manager
10/28/2021 10:09:35 AM
PCD Planning and PCD Engineering comments - site development plan 10/28/2021 10:09:35 AM
View PCD Project Manager
10/28/2021 10:09:13 AM
PCD Engineering comments - PBMP Applicability form 10/28/2021 10:09:13 AM
View PCD Project Manager
10/28/2021 10:08:51 AM
PCD Planning and PCD Engineering comments - lighting plan 10/28/2021 10:08:51 AM
View PCD Project Manager
10/28/2021 10:08:30 AM
PCD Planning and PCD Engineering comments - letter of intent 10/28/2021 10:08:30 AM
View PCD Project Manager
10/28/2021 10:08:12 AM
PCD Planning comments - landscape plan 10/28/2021 10:08:12 AM
View PCD Project Manager
10/28/2021 10:07:58 AM
PCD Engineering comments - drainage report 10/28/2021 10:07:58 AM
PCD Engineering Division
10/27/2021 1:03:30 PM
Review 1 redline comments to the following documents will be uploaded by the project manager:
- Letter of Intent
- Site Development Plan
- Lighting Plan
- Drainage Report
- PBMP Applicability Form

Per comments to the drainage report and Grading & Erosion Control Plan submit the following documents:
- Financial Assurance Estimate Form
- Pond O&M for the full spectrum detention pond to be constructed
- Pond Maintenance Agreement

Edward B. Schoenheit
Engineer I Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
719-502-9659 (C)
10/27/2021 1:03:30 PM
Pikes Peak Regional Building Department
10/21/2021 2:09:07 PM
1. There is a 16’ fence which has been addressed as 9676 Flagstone Street, is the fence still part of this project?
2. How tall is the trash enclosure? If over 7’ in height a separate address will need to be assigned and permit issued.
3. It appears the building will be a single tenant, if this is not the case please let us know, and secondary addressing will need to be added to the plans.
4. The address for the proposed building will be 9686 Flagstone Street.


Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
10/21/2021 2:09:07 PM
View El Paso County Conservation Dist
10/21/2021 8:19:53 AM
10/21/2021 8:19:53 AM
View El Paso County Conservation Dist
10/21/2021 8:19:22 AM
10/21/2021 8:19:22 AM
View Mountain View Electric Association, Inc.
10/18/2021 9:11:14 AM
See attached comments 10/18/2021 9:11:14 AM
View Widefield SD 3
10/8/2021 2:38:12 PM
10/8/2021 2:38:12 PM