Project Review Comments

Back to List


Project Name
Windermere Final Plat Filing No 1
Description
Final Plat Administrative to create 205 single-family residential lots
Location
Parcels
5329111002 5329111002 5329400013 5329400013
Applicant
DREXEL, BARRELL & CO.
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219
EA Number
EA18200
File Number
SF2126
Project Manager
Kari Parsons
Status
Active
Created
11/19/2020 9:09:32 AM

View: Project Documents



Review Comments (33)

Link Agency Comment
View PCD Engineering Division
8/20/2021 2:52:10 PM
(Cursory FAE redlines) 8/20/2021 2:52:10 PM
View PCD Engineering Division
8/20/2021 2:51:43 PM
(Cursory CD redlines summary) 8/20/2021 2:51:43 PM
View PCD Engineering Division
8/20/2021 2:51:24 PM
(Cursory CD redlines) 8/20/2021 2:51:24 PM
View PCD Engineering Division
8/20/2021 2:50:51 PM
(Additional GEC redline) 8/20/2021 2:50:51 PM
View PCD Engineering Division
8/20/2021 2:50:21 PM
(FDR redlines summary) 8/20/2021 2:50:21 PM
View PCD Engineering Division
8/20/2021 2:50:00 PM
(FDR redlines) 8/20/2021 2:50:00 PM
View PCD Engineering Division
8/20/2021 2:49:16 PM
See comment memo and redlines.

The following items need revisions and resubmittal:
- Letter of Intent
- Final Plat
- TIS
- Final Drainage Report
- CDs
- GEC Plan
- FAE
- SIA (See County Attorney's redlines)

Pending district formation, PDB-BMP agreement for the south detention pond.

-- Jeff Rice - 719-520-7877
8/20/2021 2:49:16 PM
PCD Project Manager
8/19/2021 5:31:19 PM
Engineering will upload comments upon completion of their review. 8/19/2021 5:31:19 PM
View PCD Project Manager
8/19/2021 5:30:49 PM
Drainage Report Stormwater only 8/19/2021 5:30:49 PM
View PCD Project Manager
8/19/2021 5:28:55 PM
Grading and Erosion Control Plan- Stormwater 8/19/2021 5:28:55 PM
View PCD Project Manager
8/19/2021 5:28:13 PM
Plat Planning Comments only 8/19/2021 5:28:13 PM
View PCD Project Manager
8/19/2021 5:26:41 PM
FAE Planning and Stormwater comments only 8/19/2021 5:26:41 PM
View PCD Project Manager
8/19/2021 5:25:18 PM
Letter of Intent Comments 8/19/2021 5:25:18 PM
View PCD Project Manager
8/19/2021 12:39:16 PM
Final Plat checklist 8/19/2021 12:39:16 PM
View PCD Project Manager
8/19/2021 12:38:38 PM
LOI Final Plat checklist 8/19/2021 12:38:38 PM
View PCD Project Manager
8/19/2021 12:37:54 PM
Preliminary plan for reference to address plat notes 8/19/2021 12:37:54 PM
View EPC Stormwater Review
8/16/2021 4:59:12 PM
PBMP_v1 8/16/2021 4:59:12 PM
View EPC Stormwater Review
8/16/2021 4:58:48 PM
O&M Manual_v1 8/16/2021 4:58:48 PM
View EPC Stormwater Review
8/16/2021 4:58:20 PM
GEC Checklist_v1 8/16/2021 4:58:20 PM
EPC Stormwater Review
8/16/2021 4:50:48 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report...(to be uploaded by PM with PCD comments)
- FAE.......................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- O&M Manual
- PBMP Applicability Form

Please provide the following documents:
- Signed ESQCP (SP193)
- MS4 Post Construction Form

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
8/16/2021 4:50:48 PM
View Colorado Springs Airport Advisory Commission
8/10/2021 3:29:56 PM
The attached summary with comments will be presented at the August 25, 2021 Airport Advisory Commission meeting. 8/10/2021 3:29:56 PM
Cherokee Metro Dist
8/10/2021 11:17:08 AM
Cherokee - No further comments 8/10/2021 11:17:08 AM
View Colorado Division of Water Resources
8/9/2021 5:37:22 PM
8/9/2021 5:37:22 PM
Pikes Peak Regional Building Department
8/9/2021 3:08:29 PM
1. This area was addressed in 2014, with the reconfiguration we will be changing a readdressing fee of $50.00. To have the area addressed, contact Enumerations once the development plan is approved. The project will be placed on a list to be addressed, in the order it was received.
2. Again, North Marksheffel Road should be shown on the plat.
3. Was Keith Curtis, the Floodplain Administrator added to this project? The map number and effective date is incorrect. Please contact keith. keith@pprbd.org
4. FINAL PLAT:
A. Enumerations will review the mylar prior to plat for address placement, street names, and title block.
B. A $10.00 per lot and tract platting fee will be due at the time of the review of the mylar, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. An additional over the phone transaction fee of $3.50 will apply for any credit card payment.
C. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org (Please email the Enumerations staff that reviewed your project)

*New standard comment*: All mylar reviews will be reviewed via “pdf”. The mylar will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations receiving payment. If you would like an in person review, you will have to make an appointment on our website.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org W: 719-327-2953
8/9/2021 3:08:29 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
8/5/2021 3:46:10 PM
Recommend approval. Please coordinate with CSU field engineering for gas meter and service line locations. Contact Nate DeKock at 719-668-1737 or ndekock@csu.org. FYI the contact information listed for Todd Sturtevant needs to be updated to Nate. 8/5/2021 3:46:10 PM
Colorado Springs Public Works
8/5/2021 12:35:49 PM
Traffic Engineering has the following comment:

Please add the following note to the development plan "Prior to construction plans approval, the developer is required to remit the amount of $75,000 for the future anticipated traffic signal at the intersection of Marksheffel Road and North Carefree Circle.”

Zaker Alazzeh, P.E.
Traffic Engineering Manager
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
8/5/2021 12:35:49 PM
Upper Black Squirrel Creek GWMD
8/4/2021 2:09:13 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment in the future if needed. 8/4/2021 2:09:13 PM
Mountain View Electric Association, Inc.
8/4/2021 9:20:21 AM
Note #15/Easements is approved. Note #14 - update to add MVEA for electric provider. 8/4/2021 9:20:21 AM
County Attorney - Development Review
7/28/2021 1:16:17 PM
1. Proposed changes to SIA attached.
2. It is my understanding that the Detention Pond Maintenance Agreement is being reviewed in connection with the Preliminary Plan. Please advise if this is not the case.
7/28/2021 1:16:17 PM
View Parks Advisory Board
7/26/2021 11:06:22 AM
See final Parks comments attached.

Greg
7/26/2021 11:06:22 AM
View EPC Parks Department
7/26/2021 11:05:10 AM
See final Parks comments attached.

Greg
7/26/2021 11:05:10 AM
View EPC Environmental Services
7/23/2021 2:04:20 PM
7/23/2021 2:04:20 PM
911 Authority - El Paso/Teller County
7/22/2021 6:31:53 AM
Street naming previously approved under sperate correspondence.
No Action required be E911

G West
7/22/2021 6:31:53 AM