Project Review Comments

Back to List


Project Name
Panda Express - Falcon Marketplace
Description
Panda Express drive-thru restaurant - Falcon Marketplace Lot 8 - approx. 1.37 acres
Location
Parcels
5301403004 5301403004
Applicant
HC Klover Architect
Abby Ehrler ( abby.ehrler@klover.net )
(913) 320-2171
Abby Ehrler ( abby.ehrler@klover.net )
(913) 320-2171
EA Number
EA20144
File Number
PPR2137
Project Manager
Ryan Howser
Status
Active
Created
10/28/2020 1:02:49 PM

View: Project Documents



Review Comments (25)

Link Agency Comment
View PCD Project Manager
9/16/2021 4:09:56 PM
PCD Engineering - traffic impact study comments 9/16/2021 4:09:56 PM
View PCD Project Manager
9/16/2021 4:09:19 PM
PCD Planning & PCD Engineering - site development plan comments 9/16/2021 4:09:19 PM
View PCD Project Manager
9/16/2021 4:08:59 PM
PCD Planning - lighting plan comments 9/16/2021 4:08:59 PM
View PCD Project Manager
9/16/2021 4:08:28 PM
PCD Planning - landscape plan comments 9/16/2021 4:08:28 PM
View PCD Project Manager
9/16/2021 4:08:10 PM
PCD Engineering & EPC Stormwater - Grading and erosion control plan comments 9/16/2021 4:08:10 PM
View PCD Project Manager
9/16/2021 4:07:47 PM
PCD Engineering & EPC Stormwater - financial assurance form comments 9/16/2021 4:07:47 PM
View PCD Project Manager
9/16/2021 4:07:22 PM
PCD Engineering - drainage letter comments 9/16/2021 4:07:22 PM
PCD Engineering Division
9/16/2021 3:58:56 PM
Review 1 comments on the following documents will be uploaded by the project manager:
-Drainage Report
-Site Development plan
-Grading and Erosion Control Plan
-FAE (comments by stormwater engineer)
-TIS

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
9/16/2021 3:58:56 PM
View EPC Stormwater Review
9/3/2021 1:06:25 PM
PBMP_v1 9/3/2021 1:06:25 PM
View EPC Stormwater Review
9/3/2021 1:05:59 PM
SWMP Checklist_v1 9/3/2021 1:05:59 PM
View EPC Stormwater Review
9/3/2021 1:04:50 PM
SWMP_v1 9/3/2021 1:04:50 PM
View EPC Stormwater Review
9/3/2021 1:03:41 PM
GEC Checklist_v1 9/3/2021 1:03:41 PM
EPC Stormwater Review
9/3/2021 12:56:59 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- GEC Plan...............(to be uploaded by PM with PCD comments)
- FAE.......................(to be uploaded by PM with PCD comments)
- GEC Checklist
- SWMP
- SWMP Checklist
- PBMP Applicability Form

Please provide the following documents:
- ESQCP

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
9/3/2021 12:56:59 PM
View EPC Health Department
8/27/2021 10:28:22 PM
8/27/2021 10:28:22 PM
View Mountain View Electric Association, Inc.
8/26/2021 2:32:43 PM
See attached comments 8/26/2021 2:32:43 PM
Pikes Peak Regional Building Department
8/26/2021 8:29:40 AM
Regarding a request for approval of a site development plan at 7545 Falcon Market Place, Enumerations has the following comments:

1. The site plan on page C2.0 shows a trash enclosure, but no elevations are provided. If this enclosure is over 7 feet in height, then it will require a separate address and permit. If needed, this address will be assigned at the time of plan review.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
8/26/2021 8:29:40 AM
Upper Black Squirrel Creek GWMD
8/24/2021 1:21:05 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment in the future. 8/24/2021 1:21:05 PM
View El Paso County Conservation Dist
8/24/2021 11:44:30 AM
8/24/2021 11:44:30 AM
View El Paso County Conservation Dist
8/24/2021 11:36:51 AM
8/24/2021 11:36:51 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
8/19/2021 5:06:49 PM
Please ensure the gas service line will have 3' clearance from trees.

Ensure the gas meter has 3' radial separation from operable windows, doors and sources of ignition. Provide building elevations and show the location of the gas meter.

Coordinate with CSU field engineering on final location of the gas meter and routing of the gas service line. Field engineer: Nate DeKock, 719-668-7858, ndekock@csu.org

Contact me with any questions regarding these comments.
Caleb Savage, 719-668-1855, cjsavage@csu.org
Utilities Development Services
8/19/2021 5:06:49 PM
County Attorney - Development Review
8/18/2021 8:36:05 PM
Please confirm with EPC Planner whether an escrow agreement is needed in connection with this application. 8/18/2021 8:36:05 PM
Woodmen Hills Metro
8/16/2021 2:41:22 PM
Woodmen Hills Metropolitan District will review and approve construction plans for the installation of water, sanitary sewer and any related appurtenances. Tap fees must be paid and all inspections passed in order to have a meter installed. WHMD recommends approval of this project. 8/16/2021 2:41:22 PM
911 Authority - El Paso/Teller County
8/16/2021 7:26:22 AM
No new streetnames requested on this submittal.
No action for E911.
Thank you.
Justin
8/16/2021 7:26:22 AM
Woodmen Road Metro
8/13/2021 8:57:08 AM
This property is located within the Woodmen Road Metropolitan District or its service area.
The District assess platting and building permit fees for new development in the District and requires developed parcels to be included in the Metro District boundaries through an Inclusion process; the District assess a mill levy on property in the District.

The fees for 2020 are:
Platting Fees:
Commercial- $1540/ACRE
Residential- $385.00/LOT

Building Permit Fees:
Commercial:
Destination/hotel- $1.37/SQUARE FOOT
Convenience Commercial- $5.51/SQUARE FOOT
All Other Uses- $1.10/SQUARE FOOT
Residential-
Single Family- $550/UNIT
Multi Family- $385/UNIT
8/13/2021 8:57:08 AM
RBD Floodplain
8/13/2021 8:19:20 AM
per plat note no building permits will be issued for lot 8 until after the associated 'LOMR is approved and "effective" typical lag between approved and effective is 4.5 months per FEMA. 8/13/2021 8:19:20 AM