Project Review Comments

Back to List


Project Name
Cherokee TDS Reduction Project
Description
Improvements include three new structures
Location
Parcels
3500000275 3500000275
Applicant
Garney Construction on Behalf of Cherokee Metropolitan District
David Staats ( dstaats@garney.com )
(661) 803-8784
David Staats ( dstaats@garney.com )
(661) 803-8784
EA Number
EA20135
File Number
PPR2044
Project Manager
Ryan Howser
Status
Closed
Created
10/12/2020 2:14:47 PM

View: Project Documents



Review Comments (23)

Link Agency Comment
PCD Project Manager
12/18/2020 7:12:01 AM
Planning Division has no further comments at this time. 12/18/2020 7:12:01 AM
EPC Stormwater Review
12/15/2020 12:55:16 PM
Review 2: EPC Stormwater comments have been resolved on the following documents:
- ESQCP
- FAE
- GEC Plan
- GEC Checklist
- MS4 Post Construction Form
- PBMP Applicability Form
- SWMP Checklist
- SWMP

Accordingly, EPC Stormwater has no further comments at this time.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
12/15/2020 12:55:16 PM
County Attorney - Development Review
12/3/2020 10:29:05 PM
Please re-refer after Detention Maintenance Agreement has been submitted. 12/3/2020 10:29:05 PM
View El Paso County Conservation Dist
12/1/2020 7:37:32 AM
12/1/2020 7:37:32 AM
View El Paso County Conservation Dist
12/1/2020 7:36:59 AM
12/1/2020 7:36:59 AM
View PCD Project Manager
12/1/2020 7:23:47 AM
Lighting plan comments attached. Note the following:
Chemical building south side: Per LDC Sec. 6.2.3(B)(1)(d), lighting levels cannot exceed 10 foot candles except in loading and unloading platforms.
SE corner of development area: Per LDC Sec. 6.2.3(B)(2), max height of freestanding fixtures is 15 ft.

Two options to address would be:
1. Revise lighting plan to meet above Code requirements
2. Include alternative lighting request in letter of intent if there is another regulatory agency requiring the lighting to be as proposed, pursuant to LDC Sec. 6.2.3(E).
12/1/2020 7:23:47 AM
View PCD Project Manager
12/1/2020 7:23:01 AM
Grading & Erosion Control Plan comments attached. Includes comments from PCD Engineering and EPC Stormwater. 12/1/2020 7:23:01 AM
View PCD Project Manager
12/1/2020 7:22:14 AM
Financial assurance form comments attached. Includes comments from PCD Engineering and EPC Stormwater. 12/1/2020 7:22:14 AM
View PCD Project Manager
12/1/2020 7:21:35 AM
ESQCP comments attached. Includes comments from PCD Engineering and EPC Stormwater. 12/1/2020 7:21:35 AM
View PCD Project Manager
12/1/2020 7:21:08 AM
Drainage report comments attached. Includes comments from PCD Engineering. 12/1/2020 7:21:08 AM
View EPC Stormwater Review
11/30/2020 1:39:36 PM
SWMP_V1 11/30/2020 1:39:36 PM
View EPC Stormwater Review
11/30/2020 1:36:36 PM
SWMP Checklist_V1 11/30/2020 1:36:36 PM
View EPC Stormwater Review
11/30/2020 1:36:22 PM
PBMP Applicability Form_V1 11/30/2020 1:36:22 PM
View EPC Stormwater Review
11/30/2020 1:36:07 PM
MS4 Post Construction Form_V1 11/30/2020 1:36:07 PM
View EPC Stormwater Review
11/30/2020 1:35:39 PM
GEC Checklist_v1 11/30/2020 1:35:39 PM
EPC Stormwater Review
11/30/2020 1:34:56 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- ESQCP...................(to be uploaded by PM with PCD comments)
- FAE........................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- MS4 Post Construction Form
- PBMP Applicability Form
- SWMP Checklist
- SWMP

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
11/30/2020 1:34:56 PM
Pikes Peak Regional Building Department
11/30/2020 9:21:45 AM
Regarding a request for approval of a site development plan, Enumerations has the following comments:

1. Each of the new proposed structures will require a unique address. Once this development plan is approved, the applicant should contact Enumerations to establish addresses to be used when submitting building plans for review/permit.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
11/30/2020 9:21:45 AM
PCD Engineering Division
11/28/2020 4:56:25 PM
Engineering comments have been provided in Blue. Please contact Elizabeth (719) 237-7206 or Daniel if you have any questions.

comments have been provided in the form of redlines on the following documents, and will be uploaded by the EPC project manager:
Drainage Report
ESQCP
FAE
GEC plan
11/28/2020 4:56:25 PM
PCD Project Manager
11/24/2020 3:20:37 PM
Provide a detention maintenance agreement for review. 11/24/2020 3:20:37 PM
Ellicott Fire Protection District
11/20/2020 3:59:25 PM
The Ellicott Fire Protection District has no objections to this site development plans as described. Fees pending. Please confirm the location of the non-potable water hydrant. 11/20/2020 3:59:25 PM
View Colorado Department of Public Health and Environment
11/20/2020 2:44:15 PM
CDPHE Comments attached 11/20/2020 2:44:15 PM
View EPC Environmental Services
11/18/2020 11:14:14 AM
11/18/2020 11:14:14 AM
View Mountain View Electric Association, Inc.
11/17/2020 12:19:49 PM
11/17/2020 12:19:49 PM