EPC Code Enforcement
10/14/2021 7:20:40 AM |
10/14/2021 7:20:40 AM | |
View |
EPC Code Enforcement
10/14/2021 7:19:53 AM |
10/14/2021 7:19:53 AM | |
View |
PCD Project Manager
4/12/2021 1:25:45 PM |
Lighting Plan still shows foot-candles above 0.1 threshold along roadways. See attached redlines for areas on plan identified as exceeding threshold. | 4/12/2021 1:25:45 PM |
View |
PCD Project Manager
3/23/2021 4:46:36 PM |
Please see redlines for Lighting Plan | 3/23/2021 4:46:36 PM |
PCD Project Manager
3/22/2021 8:10:03 AM |
Pending Director review | 3/22/2021 8:10:03 AM | |
PCD Project Manager
3/11/2021 5:22:44 PM |
Pending Director Approval | 3/11/2021 5:22:44 PM | |
PCD Engineering Division
3/10/2021 8:46:21 AM |
The engineering documents have been approved by the ECM administrator on 3/9/21. The approved documents will be uploaded onto EDARP by the project manager. reviewed by: Daniel Torres danieltorres@elpasoco.com |
3/10/2021 8:46:21 AM | |
View |
EPC Health Department
2/17/2021 5:24:34 PM |
Comments from 05Dec2020 attached. | 2/17/2021 5:24:34 PM |
EPC Health Department
2/17/2021 5:23:38 PM |
Comments from 05Dec2020 attached. | 2/17/2021 5:23:38 PM | |
PCD Project Manager
2/9/2021 1:46:58 PM |
All Planning items addressed. Approval pending return of singed Engineering documents per submittal request. Please upload signed GEC Plan, FAE, and Drainage Report. | 2/9/2021 1:46:58 PM | |
PCD Engineering Division
1/25/2021 3:54:18 PM |
All engineering comments have been addressed. No additional comments at this time. Please submit signed engineering documents for the engineering manager's approval. Review comments by: Jack Patton jackpatton@elpasoco.com |
1/25/2021 3:54:18 PM | |
EPC Stormwater Review
1/25/2021 3:34:09 PM |
Review 3: EPC Stormwater comments have been resolved on the following documents: - Construction Documents - GEC Checklist - SWMP - SWMP Checklist EPC Stormwater does not have any further comments at this time. Reviewed by: Glenn Reese, P.E. Stormwater Engineer I glennreese@elpasoco.com |
1/25/2021 3:34:09 PM | |
View |
Falcon Fire Protection District
1/18/2021 9:43:28 AM |
1/18/2021 9:43:28 AM | |
View |
PCD Project Manager
1/14/2021 5:39:15 PM |
Please see redline comments for Site Development Plan | 1/14/2021 5:39:15 PM |
View |
PCD Project Manager
1/14/2021 5:38:48 PM |
Please see redline comments for Landscape Plan | 1/14/2021 5:38:48 PM |
View |
PCD Project Manager
1/14/2021 5:38:09 PM |
Please see redline comments for Final Drainage Report | 1/14/2021 5:38:09 PM |
PCD Project Manager
1/13/2021 5:02:52 PM |
PCD Planning staff will upload comments once PCD Engineering staff have completed their review. | 1/13/2021 5:02:52 PM | |
PCD Engineering Division
1/13/2021 2:10:42 PM |
Previous comments on the following documents have been addressed: -Letter of Intent -Traffic Memo -Site Development Plan Please see engineering comments on the following documents that will be uploaded by the project manager: -Final Drainage Letter Review comments provided by: Jack Patton jackpatton@elpasoco.com |
1/13/2021 2:10:42 PM | |
County Attorney - Development Review
1/11/2021 4:31:02 PM |
No comments at this time. | 1/11/2021 4:31:02 PM | |
Colorado Department of Transportation - Pueblo Office
1/11/2021 12:27:09 PM |
No comments in regard to this development. | 1/11/2021 12:27:09 PM | |
Pikes Peak Regional Building Department
1/11/2021 11:14:17 AM |
NO FURTHER COMMENT | 1/11/2021 11:14:17 AM | |
Upper Black Squirrel Creek GWMD
1/6/2021 11:36:13 AM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment in the future if needed. | 1/6/2021 11:36:13 AM | |
View |
EPC Stormwater Review
12/29/2020 3:10:03 PM |
SWMP_v2 | 12/29/2020 3:10:03 PM |
View |
EPC Stormwater Review
12/29/2020 3:09:51 PM |
SWMP Checklist_v2 | 12/29/2020 3:09:51 PM |
View |
EPC Stormwater Review
12/29/2020 3:09:35 PM |
GEC Checklist_v2 | 12/29/2020 3:09:35 PM |
View |
EPC Stormwater Review
12/29/2020 3:09:18 PM |
CDs_v2 | 12/29/2020 3:09:18 PM |
EPC Stormwater Review
12/29/2020 3:08:38 PM |
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Construction Documents - GEC Checklist - SWMP - SWMP Checklist EPC Stormwater comments have been resolved on the following documents: - FAE - PBMP Please provide the following documents during next submittal round: - ESQCP Reviewed by: Glenn Reese, P.E. Stormwater Engineer I glennreese@elpasoco.com |
12/29/2020 3:08:38 PM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/18/2020 11:55:41 AM |
Hey John, I have finished with CSU's review for the subject application. There are no action items and approval can be recommended. Let me know if you need anything further from me. Thanks, Ryne Solberg rsolberg@csu.org |
12/18/2020 11:55:41 AM | |
View |
PCD Project Manager
12/7/2020 4:32:38 PM |
Please see redlines for SWMP Checklist | 12/7/2020 4:32:38 PM |
View |
PCD Project Manager
12/7/2020 4:32:01 PM |
Please see redlines for PBMP Form | 12/7/2020 4:32:01 PM |
View |
PCD Project Manager
12/7/2020 4:31:14 PM |
Please see redlines for GEC Checklist | 12/7/2020 4:31:14 PM |
View |
PCD Project Manager
12/7/2020 4:30:27 PM |
Please see redlines for Traffic Memo | 12/7/2020 4:30:27 PM |
View |
PCD Project Manager
12/7/2020 4:29:45 PM |
Please see redlines for Site Development Plan | 12/7/2020 4:29:45 PM |
View |
PCD Project Manager
12/7/2020 4:29:06 PM |
Please see redlines for Letter of Intent | 12/7/2020 4:29:06 PM |
View |
PCD Project Manager
12/7/2020 4:28:36 PM |
Please see redlines for Landscape Plan Drawings | 12/7/2020 4:28:36 PM |
View |
PCD Project Manager
12/7/2020 4:27:58 PM |
Please see redlines for Grading and Erosion Control Plan | 12/7/2020 4:27:58 PM |
View |
PCD Project Manager
12/7/2020 4:27:20 PM |
Please see redlines for Financial Assurance Forms | 12/7/2020 4:27:20 PM |
View |
PCD Project Manager
12/7/2020 4:26:40 PM |
Please see redlines for Drainage Report | 12/7/2020 4:26:40 PM |
View |
EPC Stormwater Review
12/7/2020 8:13:59 AM |
PBMP Applicability Form_v1 (and ESQCP) | 12/7/2020 8:13:59 AM |
View |
EPC Stormwater Review
12/7/2020 8:13:43 AM |
GEC Checklist_v1 | 12/7/2020 8:13:43 AM |
EPC Stormwater Review
12/7/2020 8:12:54 AM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - ESQCP...................(to be uploaded by PM with PCD comments) - FAE........................(to be uploaded by PM with PCD comments) - GEC Checklist - GEC Plan...............(to be uploaded by PM with PCD comments) - PBMP Applicability Form / ESQCP (applicant - please upload these two documents separately for next submittal round) Please provide the following documents during next submittal round: - SWMP Reviewed by: Glenn Reese, P.E. Stormwater Engineer I glennreese@elpasoco.com |
12/7/2020 8:12:54 AM | |
View |
EPC Health Department
12/5/2020 3:39:15 PM |
12/5/2020 3:39:15 PM | |
County Attorney - Development Review
12/3/2020 10:35:23 PM |
No comments from County Attorney's Office at this time. | 12/3/2020 10:35:23 PM | |
PCD Engineering Division
12/1/2020 4:28:51 PM |
Review comments provided by: Jack Patton jackpatton@elpasoco.com (719) 520-7951 Please see engineering comments on the following documents uploaded by the project manager: -Letter of Intent -Drainage Letter -Site Development Plan -Traffic Memo Please call me to discuss the engineering comments prior to resubmittal. |
12/1/2020 4:28:51 PM | |
Pikes Peak Regional Building Department
12/1/2020 10:05:04 AM |
How tall is the fencing around the grease interceptor and the trash enclosure for the dumpster? If over 7’1 an address and permit will be issued. No further comment. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org W: 719-327-2953 |
12/1/2020 10:05:04 AM | |
Colorado Department of Transportation - Pueblo Office
11/30/2020 3:51:42 PM |
CDOT staff does not have any comments for this development. | 11/30/2020 3:51:42 PM | |
View |
Falcon Fire Protection District
11/24/2020 1:30:19 PM |
11/24/2020 1:30:19 PM | |
Falcon Highlands Metro
11/19/2020 3:56:42 PM |
On behalf of the Falcon Highlands Metropolitan District: - Sewer and water service lines should be separated by a minimum of 10 feet (horizontally). - Sewer service line can be run further south before heading east in order to provide more separation from the water service line. - The water service line may still cross the sewer service line that runs south out of the exterior grease interceptor. - Water meter shall be located inside the facility, not in an exterior meter pit as shown on CU-101. - Dual cleanouts will be needed on the sewer service line in the same locations depicting single cleanouts. - Provide a detail of the grease interceptor that shows all required venting. Contact Ryan Mangino (rmangino@jdshydro.com) to obtain the correct grease interceptor detail. |
11/19/2020 3:56:42 PM | |
Upper Black Squirrel Creek GWMD
11/18/2020 9:23:55 AM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment in the future. | 11/18/2020 9:23:55 AM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/12/2020 9:39:54 AM |
Hey John, I have finished with CSU's review for the subject application. There are no action items and approval can be recommended. Let me know if you need anything further from me. Thanks, Ryne Solberg rsolberg@csu.org |
11/12/2020 9:39:54 AM |