Project Review Comments

Back to List


Project Name
Aspen Ranch Filing No. 1 Final Plat and Construction Plan Submittal
Description
Location
Parcels
5604000054 5604000054
Applicant
CIty of Fountain
Gaby Serrano ( gserrano@fountaincolorado.org )
(719) 322-2017
Gaby Serrano ( gserrano@fountaincolorado.org )
(719) 322-2017
File Number
OAR2049
Project Manager
Rad Dickson
Status
Closed
Created
9/9/2020 3:42:17 PM

View: Project Documents



Review Comments (1)

Link Agency Comment
PCD Engineering Division
9/18/2020 12:39:40 PM
Engineering Division
Drainage / Erosion Control
1. Regarding the drainage outfall across Link Road and the proposed channel through a private property (Integrity Bank & Trust) within the County, any necessary drainage and construction easements need to be acquired from that property owner.
2. At this time, there is not an intergovernmental agreement between Fountain and El Paso County regarding MS4 permitting of cross-jurisdictional construction projects. The applicant will either need to submit the applicable grading and erosion control plans (separate set), ESQCP application and SWMP to the County for the proposed construction on the County parcel or have Fountain provide documentation that the City will include the County portion of work under their oversight. An example memorandum of agreement will be provided separately and discussed with City Staff.

Transportation
1. The traffic study submitted with the preliminary plat application anticipates 30% of the site traffic (775 daily trips) utilizing Kane and R E A Roads. Address the project’s contribution toward the proposed roundabout and any other necessary offsite improvements.
2. Ensure that any negative impacts caused by the project to other County-owned and maintained roadways are appropriately mitigated. The latest TIS provided (November 4, 2019) does not address any interim improvements to offsite roads necessary for this development; verify if any improvements are needed to Kane or R E A roads or existing Ohio Ave. for the proposed amount of traffic to be added.

Comments provided by Jeff Rice, PE, jeffrice@elpasoco.com in consultation with the County Engineer.