Project Review Comments

Back to List


Project Name
11595 WATER TANK HTS
Description
Project: Tank Site Improvements Objective: Erection of a covered storage area at an existing water storage tank site (parcel has already been approved as tank site). The storage area will serve as a water operations maintenance area. The covered storage will consist of marine shipping containers covered by a structurally engineered plate arch. Cover is approximately 40’ x 30’. I am told the containers are 40’ long. I will confirm the overall planned height. Color will be painted to match adjacent storage tanks.
Location
Parcels
4219201027 4219201027
Applicant
JDS-Hydro Consultants, Inc.
Gina Mangino ( gmangino@jdshydro.com )
(719) 227-0072 x107
Gina Mangino ( gmangino@jdshydro.com )
(719) 227-0072 x107
File Number
COM2061
Project Manager
Petra Rangel
Status
Closed
Created
7/27/2020 3:29:05 PM

View: Project Documents



Review Comments (3)

Link Agency Comment
View PCD Project Manager
10/19/2020 7:56:12 AM
Official landscape plan with landscape detail is required. 10/19/2020 7:56:12 AM
View PCD Project Manager
10/15/2020 4:10:41 PM
Landscaping is different than original approved plan. Please provide a landscape plan showing existing landscaping. 10/15/2020 4:10:41 PM
PCD Engineering Division
10/15/2020 2:15:17 PM
Review comments provided by:
Jack Patton
jackpatton@elpasoco.com
(719) 520-7951

- No engineering comments at this time.