5311101002 5311101002 5311101003 5311101003
Applicant
Bucher Design Studio, Inc.
Eric Watts ( olliewatts@aol.com )
(719) 593-0173
Eric Watts ( olliewatts@aol.com )
(719) 593-0173
EA Number
EA19164
File Number
PPR2010
Project Manager
Sophie Kiepe
Status
Closed
Created
1/31/2020 2:20:32 PM

View: Project Documents



Review Comments (50)

Link Agency Comment
PCD Engineering Division
3/1/2021 2:49:48 PM
No additional engineering comments. The engineering documents will be uploaded once approved by the ECM administrator.

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
3/1/2021 2:49:48 PM
EPC Stormwater Review
3/1/2021 8:52:47 AM
All Stormwater comments have been addressed. 3/1/2021 8:52:47 AM
PCD Project Manager
2/4/2021 9:15:03 AM
Planning comments have been resolved. No further comments at this time. Please submit requested documents from Stormwater & Engineer reviewers. 2/4/2021 9:15:03 AM
PCD Engineering Division
2/3/2021 3:59:06 PM
Engineering comments have been resolved. It appears that only the drainage report has been signed. Please submit all signed engineering documents identified by the stormwater engineer as well as the ESQCP for approval by the ECM Administrator.

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
2/3/2021 3:59:06 PM
EPC Stormwater Review
2/3/2021 3:22:55 PM
Review 4: All Stormwater comments have been addressed.

Please sign and resubmit the following documents:
- FAE
- PBMP Applicability Form
- GEC
- GEC Checklist
- SWMP Checklist

Reviewed by:
Christina Furchak
Stormwater Engineer III
christinafurchak@elpasoco.com
2/3/2021 3:22:55 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/14/2021 1:34:01 PM
Hey Sophie,

I have finished with the review for the subject application. CSU has no action items and approval can be recommended. Let me know if you need anything else from me.

Thanks,

Ryne Solberg
rsolberg@csu.org
1/14/2021 1:34:01 PM
View PCD Project Manager
12/30/2020 1:11:13 PM
Please see comments on attached landscape plan. 12/30/2020 1:11:13 PM
View PCD Project Manager
12/30/2020 1:10:51 PM
Please see comments on attached site development plan. 12/30/2020 1:10:51 PM
View PCD Engineering Division
12/25/2020 4:55:54 PM
Review 3 Drainage Letter redlines 12/25/2020 4:55:54 PM
View PCD Engineering Division
12/25/2020 4:55:18 PM
Review 3 GEC Plan redlines 12/25/2020 4:55:18 PM
PCD Engineering Division
12/25/2020 4:53:57 PM
Review 4: Comments from review 3 have not been addressed. Please address the comments on the following documents.
-GEC plan
-Drainage Letter: minor comments

reviewed by
Daniel Torres
danieltorres@elpasoco.com
12/25/2020 4:53:57 PM
Pikes Peak Regional Building Department
12/8/2020 8:07:12 AM
Regarding a request for approval of a site development plan, Enumerations has the following comments:

1. When submitting building plans for permit, include a copy of the recorded waiver of replat. Enumerations will not approve the plan without a copy of the waiver being included.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
12/8/2020 8:07:12 AM
PCD Engineering Division
12/7/2020 3:20:21 PM
Review 3 comments on the following documents will be uploaded by the project manager:
-GEC plan
-Drainage Letter: minor comments

PCD Engineering comments on the following documents have been resolved.
-Site Development Plan
-PBMP Applicability Form

Provided the comments on the above documents are addressed, signed engineering documents may be submitted for approval. Please be sure to coordinate with the DPW stormwater engineer for any comments they may have before submitting the signed documents.

reviewed by
Daniel Torres
danieltorres@elpasoco.com
12/7/2020 3:20:21 PM
View EPC Stormwater Review
12/7/2020 3:02:10 PM
GEC Checklist_v3 12/7/2020 3:02:10 PM
EPC Stormwater Review
12/7/2020 3:01:09 PM
Review 3: Stormwater comments have been provided on the following uploaded documents:
- GEC (to be uploaded by the Project Manager)
- GEC Checklist

Comments have been resolved on the following documents:
- SWMP

Please sign and resubmit the following documents:
- SWMP Checklist

Reviewed by:
Christina Furchak
Stormwater Engineer III
christinafurchak@elpasoco.com
12/7/2020 3:01:09 PM
PCD Project Manager
12/4/2020 5:37:20 PM
No further comments from Planning. Any additional redlines from other agencies will be uploaded after the comment deadline. Site plan cannot be approved until after special use and vacate/replat. 12/4/2020 5:37:20 PM
View EPC Health Department
10/6/2020 3:29:30 PM
10/6/2020 3:29:30 PM
View PCD Project Manager
9/21/2020 9:07:08 AM
Landscape redlines 9/21/2020 9:07:08 AM
View PCD Project Manager
9/21/2020 9:06:48 AM
PBMP Form Redlines 9/21/2020 9:06:48 AM
View PCD Project Manager
9/21/2020 9:06:12 AM
Site Plan Redlines 9/21/2020 9:06:12 AM
View PCD Project Manager
9/21/2020 9:05:51 AM
Drainage Letter Redlines 9/21/2020 9:05:51 AM
View PCD Project Manager
9/21/2020 9:05:28 AM
GEC Redlines 9/21/2020 9:05:28 AM
PCD Engineering Division
9/17/2020 10:13:37 AM
Review 2 comments on the following documents will be uploaded by the project manager:
-GEC
-Drainage Letter
-Site Development Plan
-PBMP Applicability Form

Engineering comments on the following documents have been resolved.
-FAE

reviewed by
Daniel Torres
danieltorres@elpasoco.com
9/17/2020 10:13:37 AM
PCD Project Manager
9/16/2020 12:37:47 AM
Redlines will be uploaded after PCD Engineering completes their review. 9/16/2020 12:37:47 AM
View EPC Stormwater Review
9/15/2020 4:07:10 PM
SWMP Checklist_v2 9/15/2020 4:07:10 PM
View EPC Stormwater Review
9/15/2020 4:05:48 PM
SWMP_v2 9/15/2020 4:05:48 PM
View EPC Stormwater Review
9/15/2020 4:04:56 PM
GEC Checklist_v2 9/15/2020 4:04:56 PM
View EPC Stormwater Review
9/15/2020 4:02:04 PM
GEC_v2 9/15/2020 4:02:04 PM
EPC Stormwater Review
9/15/2020 3:56:30 PM
Review 2: Stormwater comments have been provided on the following uploaded documents:
- GEC
- GEC Checklist
- SWMP
- SWMP Checklist

Reviewed by:
Christina Furchak
Stormwater Engineer III
christinafurchak@elpasoco.com
9/15/2020 3:56:30 PM
Pikes Peak Regional Building Department
9/15/2020 8:52:08 AM
1. Will this be a waiver to replat to remove the lot line? Which address would you like to keep, 10634 or 10658 Maltese Point? There will only be one address to the building with suite numbers.
2. Will there be 5 tenant spaces at max or 10? The building should be broken down into the maximum amount the building can hold at core & shell. Then suite numbers can be eliminated as needed. Please utilize or secondary addressing guide on our website to assign the secondary addressing. Enumerations will review and approve. Please provide this information prior to plan submittal to Regional Building. https://www.pprbd.org/File/Resources/Downloads/Addressing/SECONDARY_ADDRESS_REQUEST_FORM.pdf
3. The trash enclosure does not require an address assigned or permit pulled based on height.


thank you
Amy Vanderbeek
9/15/2020 8:52:08 AM
County Attorney - Development Review
9/8/2020 1:38:47 PM
No further comments from County Attorney's Office at this time. 9/8/2020 1:38:47 PM
Falcon Fire Protection District
9/4/2020 8:05:15 AM
Fire has no objections or additional comments on this redesign DP. 9/4/2020 8:05:15 AM
Mountain View Electric Association, Inc.
9/3/2020 11:48:41 AM
Thank you for the opportunity to review this project. No additional comments at this time.
Cathy
Mountain View Electric Association, Inc.
9/3/2020 11:48:41 AM
View PCD Project Manager
5/11/2020 9:57:07 PM
See redlines on drainage report. 5/11/2020 9:57:07 PM
View PCD Project Manager
5/11/2020 9:56:46 PM
See redlines on Site Plan. 5/11/2020 9:56:46 PM
View PCD Project Manager
5/11/2020 9:56:24 PM
See redlines on GEC plan. 5/11/2020 9:56:24 PM
View PCD Project Manager
5/11/2020 9:56:03 PM
See redlines on FAE 5/11/2020 9:56:03 PM
PCD Project Manager
5/11/2020 12:18:41 AM
Landscaping can only serve to fulfill one requirement. Please revise the drawing to indicate the internal landscaping without counting landscaping that was provided to fulfill other requirements such as parking lot landscaping and roadway landscaping.

The planting islands at either end of the building are less than the required size specified in the code (size of one parking space.) The purpose of having islands that size is to have enough root area to support parking lot trees. Please increase the size of the islands to comply with the Code.

Label the locations of the proposed light poles on the landscape plan so we can verify that they are far enough from trees to not interfere. Usually a minimum of 15' is sufficient.
5/11/2020 12:18:41 AM
PCD Project Manager
4/28/2020 11:52:11 PM
Lighting Plan - make sure to show the photometric foot candles all the way to the property lines. The Land Development Code limits the light levels at the property lines and currently this cannot be assessed. 4/28/2020 11:52:11 PM
PCD Project Manager
5/11/2020 12:13:35 AM
Site Plan:
Parking shall be calculated for the highest of the uses proposed. 1 space/200 SF equals 37.5 spaces which rounds up to 38 required parking spaces.

No more than 15 parking spaces in a row without a planting island that is the same size as a parking space. The row of parking along Woodman does not comply.

Provide a detail for the dumpster enclosure.

Dumpster enclosure seems out of scale for the drawing. It is smaller than one parking place. Please revise.

Label the accessible path of travel from the parking space to the building entrances.

Provide Bike Parking per the Land Development Code.
5/11/2020 12:13:35 AM
View EPC Stormwater Review
4/27/2020 8:40:24 AM
GEC Plan_v1 4/27/2020 8:40:24 AM
View EPC Stormwater Review
4/27/2020 8:39:56 AM
GEC_v1 4/27/2020 8:39:56 AM
EPC Stormwater Review
4/27/2020 8:38:38 AM
Review 1: Stormwater comments have been provided on the following uploaded documents:
- GEC
- GEC Checklist

Please provide the following documents:
- ESQCP
- SWMP

Due to the remaining information required, these comments are cursory in nature. Additional detailed comments will be provided upon receipt of complete information/plans and resolution of the major issues

Reviewed by:
Christina Furchak
Stormwater Engineer III
christinafurchak@elpasoco.com
4/27/2020 8:38:38 AM
County Attorney - Development Review
4/23/2020 10:30:10 AM
Please confirm with the EPC project manager that no detention basins or stormwater quality BMPs will be required for this application in addition to those described in the Detention Basin Agreement for the subdivision. If that is the case, then no additional agreement is needed. 4/23/2020 10:30:10 AM
View Falcon Fire Protection District
4/22/2020 3:26:16 PM
4/22/2020 3:26:16 PM
View EPC Health Department
4/22/2020 8:56:16 AM
4/22/2020 8:56:16 AM
PCD Engineering Division
4/21/2020 5:55:31 PM
Review 1 comment on the following documents will be uploaded by the project manager:
-FAE
-GEC
-Drainage Letter
-Site Development Plan

See the redline comments provided by the EPC Stormwater Review Engineer.

reviewed by
Daniel Torres
danieltorres@elpasoco.com
4/21/2020 5:55:31 PM
Pikes Peak Regional Building Department
4/20/2020 9:43:09 AM
Regarding a request for approval of a development plan for Lots 2 & 3 of Rolling Thunder Business Park, Enumerations has the following comments:

1. A new address will be established as part of the final plat combining the 2 lots. This address should be used when submitting building plans for review/permit.
2. The proposed building appears to be meant to house multiple tenants. Any building plans submitted for permitting needs to include the secondary addressing which follows the RBD secondary addressing guidelines available on our website.




Floodplain has no comment or objection.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
4/20/2020 9:43:09 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
4/10/2020 8:47:58 AM
No apparent conflicts - recommend approval.
-Kyle Schelhaas, 719-668-8126, kschelhaas@csu.org
4/10/2020 8:47:58 AM
View Mountain View Electric Association, Inc.
4/1/2020 12:49:53 PM
4/1/2020 12:49:53 PM