Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
5/3/2022 5:22:52 PM |
The engineering documents are ready for approval and will be uploaded to EDARP when available. -- Jeff Rice - 719-520-7877 |
5/3/2022 5:22:52 PM | |
View |
EPC Stormwater Review
4/11/2022 8:30:00 AM |
PDB-BMP Maintenance Agreement_V5 | 4/11/2022 8:30:00 AM |
EPC Stormwater Review
4/11/2022 8:29:32 AM |
EPC Stormwater Review of Submittal #5: pond calcs in PDR and SDI Form cannot be reviewed without detail drawings for pond and pond structures (outlet, spillway, etc). Comments have been provided on: - PDB-BMP Maintenance Agreement Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
4/11/2022 8:29:32 AM | |
View |
PCD Engineering Division
4/8/2022 3:04:54 PM |
(PDB-BMP Agreement redlines) Please provide Word and PDF versions if all changes are accepted. |
4/8/2022 3:04:54 PM |
View |
PCD Engineering Division
4/8/2022 3:03:55 PM |
(O&M redlines) | 4/8/2022 3:03:55 PM |
View |
PCD Engineering Division
4/8/2022 3:03:33 PM |
(GEC Plan redlines) | 4/8/2022 3:03:33 PM |
View |
PCD Engineering Division
4/8/2022 3:03:11 PM |
See comment memo (link at left) and redlines. The following items need to be revised and resubmitted: - GEC Plan (with updates per redlines and PDR/FDR) - PDB-BMP agreement (see comment memo and redlines) - O&M manual (see redlines) - All items highlighted in blue on the Engineering Final Submittal Checklist (including those listed above) are needed prior to issuance of the EGP. -- Jeff Rice - 719-520-7877 |
4/8/2022 3:03:11 PM |
County Attorney - Development Review
4/7/2022 1:51:20 PM |
Not all proposed edits to DMA dated Feb. 8 have been accepted or addressed. If there are any objections or concerns, please contact Lori Seago at the County Attorney's Office to discuss. If not, please accept all changes and resubmit for final review. | 4/7/2022 1:51:20 PM | |
PCD Project Manager
2/16/2022 3:59:56 PM |
Ms. Ruiz is processing the PUDSP. I understand this is stand alone application to be scheduled before the BoCC prior than the PUDSP. Is that still the case? | 2/16/2022 3:59:56 PM | |
View |
PCD Engineering Division
2/16/2022 2:53:51 PM |
See comment memo (link at left) and redlines. The following items need to be submitted: - GEC Plan (with updates per PDR/FDR) - MS4 Form and SDI worksheet (with updates per PDR/FDR) - PDB-BMP agreement (see comment memo) - Exhibits and an O&M manual are needed to attach to the PDB-BMP maintenance agreement prior to recording the agreement. - All items highlighted in blue on the Engineering Final Submittal Checklist (9, including those listed above) are needed prior to issuance of the EGP. -- Jeff Rice - 719-520-7877 |
2/16/2022 2:53:51 PM |
View |
County Attorney - Development Review
2/8/2022 1:11:57 PM |
Proposed changes to Detention Maintenance Agreement attached. | 2/8/2022 1:11:57 PM |
View |
PCD Engineering Division
1/12/2022 4:51:23 PM |
(PDSG-ROA Form) | 1/12/2022 4:51:23 PM |
View |
PCD Engineering Division
1/12/2022 4:50:43 PM |
(GEC sheet re: Note #28) | 1/12/2022 4:50:43 PM |
View |
PCD Engineering Division
1/12/2022 4:49:41 PM |
See comment memo (link at left) and redlines. The following items need to be submitted: - Pre-Development Site Grading/ROA Acknowledgement, signed - MS4 Form and SDI worksheet - PDB-BMP agreement (see comment memo) - Exhibits and an O&M manual are needed to attach to the PDB-BMP maintenance agreement prior to recording the agreement. -- Jeff Rice - 719-520-7877 |
1/12/2022 4:49:41 PM |
PCD Project Manager
1/12/2022 7:17:26 AM |
Nina Ruiz has taken over the corresponding PUDSP review. | 1/12/2022 7:17:26 AM | |
Cherokee Metro Dist
1/11/2022 8:41:30 AM |
Letter of Intent Page 3 - 4th paragraph, next to the last sentence: Cherokee has no formal assumptions on the Denver Basin water supply. Delete this sentence. - ii: The District is pursuing a reuse plan (Replacement Plan) but currently has no approved plan or water rights to reuse water discharged into the Upper Black Squirrel alluvial ground water aquifer. Reword this paragraph to refer to a planned Replacement Plan or delete. |
1/11/2022 8:41:30 AM | |
EPC Stormwater Review
12/27/2021 7:40:12 PM |
Review 3: EPC Stormwater comments have been resolved on the following documents: - Drainage Report - ESQCP - GEC Checklist - GEC Plan - SWMP Checklist - SWMP EPC has no further comments at this time. Thanks. Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
12/27/2021 7:40:12 PM | |
View |
PCD Engineering Division
12/3/2021 2:33:31 PM |
(FAE redlines) | 12/3/2021 2:33:31 PM |
View |
PCD Engineering Division
12/3/2021 2:33:05 PM |
(GEC redlines summary) | 12/3/2021 2:33:05 PM |
View |
PCD Engineering Division
12/3/2021 2:32:44 PM |
(GEC redlines) | 12/3/2021 2:32:44 PM |
View |
PCD Engineering Division
12/3/2021 2:32:15 PM |
See comment memo (link at left) and redlines. The following items need to be revised and resubmitted: - GEC Plan, signed - FAE, signed - Pre-Development Site Grading/ROA Acknowledgement, signed -- Jeff Rice - 719-520-7877 |
12/3/2021 2:32:15 PM |
Colorado Springs Public Works
11/24/2021 4:45:44 AM |
Traffic Engineering has no comments on this item. Zaker Alazzeh, P.E. Traffic Engineering Manager City of Colorado Springs (719) 385-5468 Zaker.Alazzeh@coloradosprings.gov |
11/24/2021 4:45:44 AM | |
Colorado Springs Public Works
11/23/2021 10:36:57 AM |
Engineering Development Review has no comments on this item. Joel Dagnillo, P.E. Engineer III Engineering Development Review City of Colorado Springs (719)385-5412 Joel.dagnillo@coloradosprings.gov |
11/23/2021 10:36:57 AM | |
View |
PCD Project Manager
11/18/2021 8:28:51 AM |
Comments on the PUDSP are forth coming. Please see the attach Code changes regarding Pre-site development grading. | 11/18/2021 8:28:51 AM |
Colorado Springs Airport Advisory Commission
11/17/2021 4:25:23 PM |
Airport staff has no comments to provide on this item. | 11/17/2021 4:25:23 PM | |
Cherokee Metro Dist
11/17/2021 8:57:55 AM |
No comment on preliminary plans - will furnish comments on water and sanitary sewer plans when provided. | 11/17/2021 8:57:55 AM | |
View |
EPC Stormwater Review
11/16/2021 3:43:02 PM |
SWMP | 11/16/2021 3:43:02 PM |
View |
EPC Stormwater Review
11/16/2021 3:42:11 PM |
SWMP Checklist | 11/16/2021 3:42:11 PM |
View |
EPC Stormwater Review
11/16/2021 3:41:55 PM |
GEC Plan | 11/16/2021 3:41:55 PM |
View |
EPC Stormwater Review
11/16/2021 3:41:16 PM |
GEC Checklist | 11/16/2021 3:41:16 PM |
View |
EPC Stormwater Review
11/16/2021 3:40:52 PM |
ESQCP | 11/16/2021 3:40:52 PM |
View |
EPC Stormwater Review
11/16/2021 3:40:37 PM |
Drainage Report | 11/16/2021 3:40:37 PM |
EPC Stormwater Review
11/16/2021 3:44:05 PM |
Review 2: EPC Stormwater comments have been provided on the following uploaded documents: - Drainage Report - ESQCP (one minor comment and also sign and date for next submittal) - GEC Checklist (all major comments resolved, but sign and date for next submittal) - GEC Plan (some minor comments remain and also sign and date cover page with next submittal) - SWMP Checklist (all major comments resolved, but sign and date for next submittal) - SWMP Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
11/16/2021 3:44:05 PM | |
View |
PCD Engineering Division
9/30/2020 9:17:38 AM |
(PBMP Applicability Form redlines) | 9/30/2020 9:17:38 AM |
View |
PCD Engineering Division
9/30/2020 9:16:36 AM |
See comment letter and redlines. -- Jeff Rice - 520-7877 |
9/30/2020 9:16:36 AM |
View |
Colorado Springs Airport Advisory Commission
9/17/2020 2:41:11 PM |
The attached summary with comments will be presented at the September 23, 2020 Airport Advisory Commission meeting. | 9/17/2020 2:41:11 PM |
View |
EPC Stormwater Review
9/17/2020 9:12:24 AM |
SWMP V_1 | 9/17/2020 9:12:24 AM |
View |
EPC Stormwater Review
9/17/2020 9:11:27 AM |
SWMP Check V_1 | 9/17/2020 9:11:27 AM |
View |
EPC Stormwater Review
9/17/2020 9:11:10 AM |
GEC V_1 | 9/17/2020 9:11:10 AM |
View |
EPC Stormwater Review
9/17/2020 9:10:26 AM |
GEC Checklist V_1 | 9/17/2020 9:10:26 AM |
View |
EPC Stormwater Review
9/17/2020 9:10:12 AM |
ESQCP V_1 | 9/17/2020 9:10:12 AM |
EPC Stormwater Review
9/17/2020 9:09:47 AM |
Review 1: EPC Stormwater comments have been provided on the following uploaded documents: - ESQCP - GEC Checklist - GEC Plan - SWMP Checklist - SWMP Reviewed by: Glenn Reese, P.E. Stormwater Engineer I glennreese@elpasoco.com |
9/17/2020 9:09:47 AM | |
Cherokee Metro Dist
9/16/2020 10:19:06 AM |
Fill cover over existing 8" Cherokee sanitary sewer located along Constitution shall be a maximum of 14'. Submitted plan shows 16'. Modify grading plan to limit cover to 14'. | 9/16/2020 10:19:06 AM |