Project Review Comments

Back to List


Project Name
Meadow Lake Industrial & Commercial Park GA-O
Description
A request for an GA-O District
Location
Parcels
4300000548 4300000548 4300000551 4300000551 4300000552 4300000552 4300000553 4300000553
Applicant
William Guman & Associates, Ltd.
Bill Guman ( bill@guman.net )
(719) 633-9700
Bill Guman ( bill@guman.net )
(719) 633-9700
EA Number
19-129
File Number
GA-O191
Project Manager
Ryan Howser
Status
Closed
Created
11/5/2019 1:59:38 PM

View: Project Documents



Review Comments (36)

Link Agency Comment
PCD Engineering Division
4/20/2021 5:30:39 PM
Review 3: Engineering comments have been resolved.

- Resubmit the Master Traffic Impact Study with stamped and signed traffic engineer's statement and developer's statement for final approval



Note: Per the email correspondence from Daniel Torres to Jeff Hodsdon on 4/19/21, the deviation request for a second access onto Curtis Rd will be denied. One access to the east onto Curtis Rd and one to the south onto Falcon Hwy will be permitted. The Traffic Impact Study associated with the subsequent preliminary plan application shall reflect the permitted number of access.

Reviewed by:
Gilbert LaForce
gilbertlaforce@elpasoco.com
4/20/2021 5:30:39 PM
PCD Project Manager
4/20/2021 4:23:14 PM
Planning Division has no further comments at this time. 4/20/2021 4:23:14 PM
911 Authority - El Paso/Teller County
4/20/2021 8:06:55 AM
Comments for E911 as follows:

We understand that this project is in the rezone phase and is not yet making final decisions on street names and layout.
Our purpose in commenting on the rezone phase is to clarify and possibly resolve issues early on, so that any possible delays can be avoided.

The Meadow Lake Industrial project was submitted without a distinct site plan, but included a site plan on pg 29 of the Traffic Impact Study.
This site plan depicts several street names, some of which have been previously approved for this project and some that have been declined.

My comments are directed toward these in the hope that they will be corrected before further submittals.

Minden Dr – Not acceptable, existing streetname
Longview Dr – Not acceptable, existing streetname

Pullman Dr - Available
Aventura Dr – Available
Sunriver Dr – Available
Reston Dr – Available

Thank you
Justin
4/20/2021 8:06:55 AM
View Colorado Department of Transportation - Pueblo Office
4/19/2021 12:20:40 PM
4/19/2021 12:20:40 PM
RBD Floodplain
3/30/2021 12:44:31 PM
Project has exposure to A zone FEMA floodplain.
Any work in the A zone will require a less than one foot rise certification letter.
subdivision must adhere to RBC313.18.5

Subdivision Proposals.
All subdivision proposals shall be consistent with the need to minimize flood damage;
All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage;
All subdivision proposals shall have adequate drainage provided to reduce exposure to flood damage;
FEMA approved base flood elevation data and 100-year floodplain boundaries shall be provided and shown on plats
for subdivision proposals and other proposed developments that contain at least fifty lots or five (5) acres, whichever is less;
All buildable lots less than two and one half (2½) acres in size are required to be located entirely outside of the 100-year floodplain. Lands within the 100-year floodplain shall be established in a tract, and require that the owner maintain the tract. Buildable lots two
and one half (2½) acres and larger, are required to have the 100-year floodplain contained in a drainage easement dedicated by plat in the name of the governing body with the restrictions of “No Build” and “No Storage of any Materials”; and
If subdivision proposals are located within three hundred (300) feet of a Zone A floodplain, FEMA approved base flood elevations and boundaries are required to be determined and shown on the plat, or provide a Floodplain Certification Letter by a professional engineer or architect licensed by the state of Colorado, stating that “Based on field verified characteristics of the property, the property is reasonably safe from flooding and to the best of the engineer’s knowledge if the 100-year floodplain were studied it would not enter the property in question”.
3/30/2021 12:44:31 PM
View PCD Project Manager
3/5/2021 7:15:36 AM
Zoning map comments attached. Includes PCD Engineering comments. 3/5/2021 7:15:36 AM
View PCD Project Manager
3/5/2021 7:15:13 AM
TIS comments attached. Includes PCD Engineering comments. 3/5/2021 7:15:13 AM
View PCD Project Manager
3/5/2021 7:14:53 AM
Letter of intent comments attached. Also includes PCD Engineering comments. 3/5/2021 7:14:53 AM
View PCD Project Manager
3/5/2021 7:14:25 AM
Deviation request comments attached. Includes PCD Engineering comments. 3/5/2021 7:14:25 AM
PCD Engineering Division
3/4/2021 9:42:27 PM
Review 2 comments on the following documents will be uploaded by the project manager:
-Traffic Study
-Letter of Intent
-Zoning Map
-Deviation Request

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
3/4/2021 9:42:27 PM
View Colorado Department of Transportation - Pueblo Office
3/1/2021 11:19:57 AM
3/1/2021 11:19:57 AM
County Attorney - Development Review
2/24/2021 2:38:10 PM
No comments at this time. 2/24/2021 2:38:10 PM
Colorado Department of Transportation - Pueblo Office
2/5/2021 2:19:48 PM
Comments will be forthcoming. 2/5/2021 2:19:48 PM
911 Authority - El Paso/Teller County
2/2/2021 9:21:15 AM
No new streetnames requested on this submittal.
Comments for E911 reserved until internal development layout is submitted.
Thank you
Justin
2/2/2021 9:21:15 AM
County Attorney - Water
1/27/2021 3:13:10 PM
It does not appear that a review of water sufficiency is necessary at this time. County Attorney's Office will await future submittals. Thank you. 1/27/2021 3:13:10 PM
View Colorado Department of Transportation - Pueblo Office
6/24/2020 1:28:56 PM
6/24/2020 1:28:56 PM
View PCD Project Manager
6/11/2020 9:34:20 AM
FAA master plan comments attached. 6/11/2020 9:34:20 AM
County Attorney - Water
6/4/2020 2:59:00 PM
Please resubmit to County Attorney for review at next review period. Thank you! 6/4/2020 2:59:00 PM
County Attorney - Development Review
6/1/2020 9:47:46 AM
County Attorney's Office will review during the next review period. 6/1/2020 9:47:46 AM
View PCD Project Manager
5/21/2020 9:17:47 AM
Zoning map comments attached. Also includes PCD Engineering comments. 5/21/2020 9:17:47 AM
View PCD Project Manager
5/21/2020 9:17:22 AM
Water supply report comments attached. 5/21/2020 9:17:22 AM
View PCD Project Manager
5/21/2020 9:17:02 AM
Traffic study comments attached. Includes PCD engineering comments. 5/21/2020 9:17:02 AM
View PCD Project Manager
5/21/2020 9:16:34 AM
Letter of intent comments attached. Also includes PCD Engineering comments. 5/21/2020 9:16:34 AM
View PCD Project Manager
5/21/2020 9:16:03 AM
Application comments attached. Please provide a new application. 5/21/2020 9:16:03 AM
View PCD Project Manager
5/21/2020 9:15:43 AM
Adjacent Owner notification comments attached. Please provide a copy of the new letter and new mailings for all adjacent neighbors. This letter should ONLY refer to the action of applying the GA-O overlay to the property. 5/21/2020 9:15:43 AM
PCD Engineering Division
5/20/2020 10:26:14 PM
Review 1 comments on the following documents will be uploaded by the project manager:
-Traffic Study
-Letter of Intent
-Zoning Map

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
5/20/2020 10:26:14 PM
PCD Project Manager
5/20/2020 10:13:25 AM
Please see comments for the rezoning application CS201. All comments will also apply for this application, but as they relate to the GA-O overlay district rather than the CS zoning district. There are additional comments on the Letter of Intent for the GA-O overlay, as the criteria is different for an application for an overlay district than for an application for a standard rezoning. Please note that all comments relating to the application, neighbor notice, and water report from the CS201 project will apply to this project as well. 5/20/2020 10:13:25 AM
PCD Project Manager
5/20/2020 10:05:30 AM
Please note that approval of this application is subject to approval of applications for CS201 and I201. This application may be subject to change should either of the previosu applications be denied or abandoned. 5/20/2020 10:05:30 AM
PCD Project Manager
5/20/2020 10:04:20 AM
Based on the level and number of comments on this submittal, your resubmittal will be reviewed as a first submittal. 5/20/2020 10:04:20 AM
Pikes Peak Regional Building Department
5/19/2020 6:40:37 PM
No comments at this time. 5/19/2020 6:40:37 PM
View Mountain View Electric Association, Inc.
5/14/2020 12:46:28 PM
5/14/2020 12:46:28 PM
911 Authority - El Paso/Teller County
5/12/2020 10:54:42 AM
The map indicating intended ROW throughout this development appears to have road names associated that are unreadable.
These are not necessary for the rezone portion of the process.

Comments for E911 reserved until road names and layouts for this development are provided.

Thank you
Justin
5/12/2020 10:54:42 AM
Colorado Springs Airport Advisory Commission
5/11/2020 11:01:30 AM
This project is outside of the commercial airport overlay district and outside the jurisdiction for Airport Staff and the Airport Advisory Commission to provide comments. 5/11/2020 11:01:30 AM
View EPC Environmental Services
5/4/2020 1:50:41 PM
5/4/2020 1:50:41 PM
Falcon Fire Protection District
5/1/2020 9:32:35 AM
Falcon Fire has reviewed this General Aviation Overlay request and has no objections or additional comments at this time. 5/1/2020 9:32:35 AM
RBD Floodplain
4/29/2020 2:39:02 PM
FEMA approved base flood elevation data and 100-year floodplain boundaries shall be provided and shown on plats
for subdivision proposals and other proposed developments that contain at least fifty lots or five (5) acres, whichever is less;
All buildable lots less than two and one half (2½) acres in size are required to be located entirely outside of the 100-year floodplain. Lands within the 100-year floodplain shall be established in a tract, and require that the owner maintain the tract. Buildable lots two
and one half (2½) acres and larger, are required to have the 100-year floodplain contained in a drainage easement dedicated by plat in the name of the governing body with the restrictions of “No Build” and “No Storage of any Materials”; and
If subdivision proposals are located within three hundred (300) feet of a Zone A floodplain, FEMA approved base flood elevations and boundaries are required to be determined and shown on the plat, or provide a Floodplain Certification Letter by a professional engineer or architect licensed by the state of Colorado, stating that “Based on field verified characteristics of the property, the property is reasonably safe from flooding and to the best of the engineer’s knowledge if the 100-year floodplain were studied it would not enter the property in question”.
4/29/2020 2:39:02 PM