Project Review Comments

Back to List


Project Name
Meadow Lake Industrial Park
Description
A request for a rezone fro RR5 to I-2
Location
Parcels
4300000548 4300000548 4300000552 4300000552 4300000553 4300000553
Applicant
William Guman & Associates, Ltd.
Bill Guman ( bill@guman.net )
(719) 633-9700
Bill Guman ( bill@guman.net )
(719) 633-9700
EA Number
19-129
File Number
I201
Project Manager
Ryan Howser
Status
Closed
Created
11/5/2019 12:54:03 PM

View: Project Documents



Review Comments (28)

Link Agency Comment
PCD Engineering Division
4/20/2021 5:15:57 PM
Review 3: Engineering comments have been resolved.

- Resubmit the Master Traffic Impact Study with stamped and signed traffic engineer's statement and developer's statement for final approval



Note: Per the email correspondence from Daniel Torres to Jeff Hodsdon on 4/19/21, the deviation request for a second access onto Curtis Rd will be denied. One access to the east onto Curtis Rd and one to the south onto Falcon Hwy will be permitted. The Traffic Impact Study associated with the subsequent preliminary plan application shall reflect the permitted number of access.

Reviewed by:
Gilbert LaForce
gilbertlaforce@elpasoco.com
4/20/2021 5:15:57 PM
PCD Project Manager
4/20/2021 4:22:40 PM
Planning Division has no further comments at this time. 4/20/2021 4:22:40 PM
View EPC Environmental Services
4/6/2021 11:44:05 AM
4/6/2021 11:44:05 AM
View PCD Project Manager
3/5/2021 7:20:17 AM
Zoning map comments attached. Includes PCD Engineering comments. 3/5/2021 7:20:17 AM
View PCD Project Manager
3/5/2021 7:19:46 AM
TIS comments attached. Includes PCD Engineering comments. 3/5/2021 7:19:46 AM
View PCD Project Manager
3/5/2021 7:19:56 AM
Letter of intent comments attached. 3/5/2021 7:19:56 AM
View PCD Project Manager
3/5/2021 7:19:07 AM
Deviation request comments attached. Includes PCD Engineering comments. 3/5/2021 7:19:07 AM
PCD Engineering Division
3/4/2021 4:01:10 PM
Review 2 comments on the following documents will be uploaded by the project manager:
-Traffic Study
-Zoning Map
-Deviation request

Engineering comments on the following documents have been resolved:
-Letter of intent

Reviewed by:
Daniel Torres
danieltorres@elpasoco.com
3/4/2021 4:01:10 PM
County Attorney - Development Review
3/2/2021 9:27:42 AM
No comments at this time. 3/2/2021 9:27:42 AM
View EPC Environmental Services
1/28/2021 12:26:01 PM
1/28/2021 12:26:01 PM
RBD Floodplain
1/28/2021 8:10:39 AM
It was noted in the letter of intent that "Future site specific I-2 Development
Plan submittals will further define lot sizes.....ect". The developer should consider RBC 313 which would include doing a detailed study of the A zone, onsite and nearby, as well as specifying that area no build no storage. A conditional letter of map revision , CLOMR may be submitted to FEMA if alterations to the SFHA are desired.
1/28/2021 8:10:39 AM
County Attorney - Water
1/27/2021 3:16:21 PM
It does not appear that a review of water sufficiency is necessary at this time. County Attorney's Office will await future submittals. Thank you. 1/27/2021 3:16:21 PM
County Attorney - Water
6/4/2020 2:59:46 PM
Please resubmit to County Attorney for review at next review period. Thank you! 6/4/2020 2:59:46 PM
County Attorney - Development Review
6/1/2020 9:47:13 AM
County Attorney's Office will review during the next review period. 6/1/2020 9:47:13 AM
View EPC Health Department
5/22/2020 9:21:22 AM
5/22/2020 9:21:22 AM
View PCD Project Manager
5/21/2020 9:12:22 AM
Zoning map comments attached. Includes PCD Engineering comments. 5/21/2020 9:12:22 AM
View PCD Project Manager
5/21/2020 9:12:01 AM
Water supply report comments attached. 5/21/2020 9:12:01 AM
View PCD Project Manager
5/21/2020 9:11:43 AM
Traffic study comments attached. Includes PCD engineering comments. 5/21/2020 9:11:43 AM
View PCD Project Manager
5/21/2020 9:11:23 AM
Letter of intent comments attached. Also includes PCD engineering comments. 5/21/2020 9:11:23 AM
View PCD Project Manager
5/21/2020 9:10:36 AM
Application comments attached. Please provide a new application. 5/21/2020 9:10:36 AM
View PCD Project Manager
5/21/2020 9:09:54 AM
Adjacent Owner notification comments attached. Please provide a copy of the new letter and new mailings for all adjacent neighbors. This letter should ONLY refer to the action of rezoning to I-2. 5/21/2020 9:09:54 AM
PCD Engineering Division
5/20/2020 10:03:03 PM
Review 1 comments on the following documents will be uploaded by the project manager:
-Traffic Study
-Letter of Intent
-Zoning Map

Reviewed by:
Daniel Torres
danieltorres@elpasoco.com
5/20/2020 10:03:03 PM
PCD Project Manager
5/20/2020 10:04:09 AM
Please see comments for the rezoning application CS201. All comments will also apply for this application, but as they relate to the I-2 district rather than the CS district. 5/20/2020 10:04:09 AM
PCD Project Manager
5/20/2020 10:02:17 AM
Based on the level and number of comments on this submittal, your resubmittal will be reviewed as a first submittal. 5/20/2020 10:02:17 AM
View Mountain View Electric Association, Inc.
5/14/2020 12:47:31 PM
5/14/2020 12:47:31 PM
View EPC Environmental Services
5/4/2020 12:58:46 PM
5/4/2020 12:58:46 PM
Falcon Fire Protection District
5/1/2020 9:29:36 AM
Falcon Fire has no objections to this rezone request. 5/1/2020 9:29:36 AM
RBD Floodplain
4/29/2020 2:37:49 PM
FEMA approved base flood elevation data and 100-year floodplain boundaries shall be provided and shown on plats
for subdivision proposals and other proposed developments that contain at least fifty lots or five (5) acres, whichever is less;
All buildable lots less than two and one half (2½) acres in size are required to be located entirely outside of the 100-year floodplain. Lands within the 100-year floodplain shall be established in a tract, and require that the owner maintain the tract. Buildable lots two
and one half (2½) acres and larger, are required to have the 100-year floodplain contained in a drainage easement dedicated by plat in the name of the governing body with the restrictions of “No Build” and “No Storage of any Materials”; and
If subdivision proposals are located within three hundred (300) feet of a Zone A floodplain, FEMA approved base flood elevations and boundaries are required to be determined and shown on the plat, or provide a Floodplain Certification Letter by a professional engineer or architect licensed by the state of Colorado, stating that “Based on field verified characteristics of the property, the property is reasonably safe from flooding and to the best of the engineer’s knowledge if the 100-year floodplain were studied it would not enter the property in question”.
4/29/2020 2:37:49 PM