Project Review Comments

Back to List


Project Name
Dwire Minor Sub
Description
A request for a final plat to legalize a lot
Location
East of Marksheffel off of Capital Drive
Parcels
5300000552 5300000552
Applicant
Dwire Excavating
Georgianne Willard ( georgiannew@mscivil.com )
(719) 955-5485
Georgianne Willard ( georgiannew@mscivil.com )
(719) 955-5485
EA Number
EA19185 EA18136
File Number
MS202
Project Manager
Nina Ruiz
Status
Closed
Created
11/5/2019 7:41:37 AM

View: Project Documents



Review Comments (75)

Link Agency Comment
View County Attorney - Water
4/29/2021 8:03:14 AM
Applicant - please remove from eDARP the commitment letter from water service provider dated December 30, 2019 and upload June 1, 2020, as it is outdated. Thank you. 4/29/2021 8:03:14 AM
PCD Engineering Division
4/15/2021 5:57:15 PM
The dollar amount in the SIA needs to match the FAE.

The staff report for the May 6th Planning Commission is being drafted.

-- Jeff Rice - 719-520-7877
4/15/2021 5:57:15 PM
View PCD Engineering Division
3/18/2021 7:40:23 PM
See comment letter. Engineering documents have been signed by the ECM Administrator.

The SIA needs to include reference to the escrow agreement; staff will coordinate with the County Attorney’s Office to ensure this is covered.
3/18/2021 7:40:23 PM
View PCD Engineering Division
3/2/2021 11:34:21 AM
(CD redline sheet) 3/2/2021 11:34:21 AM
View PCD Engineering Division
3/2/2021 11:33:49 AM
(FDR redline pages) 3/2/2021 11:33:49 AM
View PCD Engineering Division
3/2/2021 11:29:28 AM
(Engineering Plat redlines) 3/2/2021 11:29:28 AM
View PCD Engineering Division
3/2/2021 11:28:55 AM
(Engineering LOI redlines) 3/2/2021 11:28:55 AM
View PCD Engineering Division
3/3/2021 10:33:37 AM
See comment letter and redlines.

Additional Planning comments and redlines are pending.

-- Jeff Rice - 719-520-7877
3/3/2021 10:33:37 AM
EPC Stormwater Review
1/20/2021 1:51:30 PM
All Stormwater comments have been addressed. 1/20/2021 1:51:30 PM
View PCD Engineering Division
12/31/2020 3:30:56 PM
(SWMP redlined page) 12/31/2020 3:30:56 PM
View PCD Engineering Division
12/31/2020 3:30:10 PM
(FDR redlined pages) 12/31/2020 3:30:10 PM
View PCD Engineering Division
12/31/2020 3:29:31 PM
(GEC redlines) 12/31/2020 3:29:31 PM
View PCD Engineering Division
12/31/2020 3:28:58 PM
(Plat redlines) 12/31/2020 3:28:58 PM
View PCD Engineering Division
12/31/2020 3:28:23 PM
See comment letter and redlines. Address the comments in the letter.

The following final, signed documents need to be submitted:
- Drainage Report (signed)
- PBMP Applicability Form
- Traffic Impact Study (signed)
- Grading & Erosion Control Plan and checklist (signed)
- Construction Plans (signed)
- MS4 Post Construction Form
- SDI worksheet
- ESQCP (signed)
- Financial Assurance Estimate, SIA (signed)
- Pond/BMP Maint. Agreement and Easement (signed - done with Timberline)
- Operation & Maintenance Manual with final GEC Plan and PDB/BMP Agreement
12/31/2020 3:28:23 PM
PCD Project Manager
12/20/2020 1:24:33 PM
The letter of intent still does not address the review criteria for a minor subdivision. It is your responsibility as the applicant to justify why the request should be approved. If you do not provide adequate justification the request could be denied. Please revise accordingly. 12/20/2020 1:24:33 PM
PCD Project Manager
12/20/2020 1:09:50 PM
additional redlines and comments will be provided upon completion of the PCD engineering division review. 12/20/2020 1:09:50 PM
View Colorado Parks and Wildlife
12/10/2020 8:22:48 AM
12/10/2020 8:22:48 AM
View Colorado Division of Water Resources
10/6/2020 10:34:29 AM
10/6/2020 10:34:29 AM
View Colorado Department of Transportation - Pueblo Office
9/17/2020 11:19:00 AM
9/17/2020 11:19:00 AM
View PCD Project Manager
8/19/2020 3:33:48 PM
Water Supply Information Summary Redliens 8/19/2020 3:33:48 PM
View PCD Project Manager
8/19/2020 3:33:22 PM
Water Resources Report Redlines 8/19/2020 3:33:22 PM
View PCD Project Manager
8/19/2020 3:33:02 PM
Water Supply Information Summary Redlines 8/19/2020 3:33:02 PM
View PCD Project Manager
8/19/2020 3:32:42 PM
Plat Redlines 8/19/2020 3:32:42 PM
View PCD Project Manager
8/19/2020 3:32:08 PM
Mineral Rights Cert_V1 Redlines 8/19/2020 3:32:08 PM
View PCD Project Manager
8/19/2020 3:31:46 PM
Letter of Intent Redlines 8/19/2020 3:31:46 PM
EPC Stormwater Review
8/19/2020 7:40:39 AM
Review 2: Stormwater comments have been provided on the following uploaded documents:
- GEC
- GEC Checklist
- SWMP
- SWMP Checklist

Reviewed by:
Christina Furchak
Stormwater Engineer III
christinafurchak@elpasoco.com
8/19/2020 7:40:39 AM
View EPC Stormwater Review
8/19/2020 7:39:44 AM
SWMP Checklist_v2 8/19/2020 7:39:44 AM
View EPC Stormwater Review
8/19/2020 7:38:28 AM
SWMP_v2 8/19/2020 7:38:28 AM
View EPC Stormwater Review
8/19/2020 7:37:01 AM
GEC Checklist_v2 8/19/2020 7:37:01 AM
View EPC Stormwater Review
8/19/2020 7:36:19 AM
GEC_v2 8/19/2020 7:36:19 AM
View PCD Engineering Division
8/13/2020 12:31:48 PM
(O&M redlines) 8/13/2020 12:31:48 PM
View PCD Engineering Division
8/13/2020 12:31:16 PM
(CD redlines summary) 8/13/2020 12:31:16 PM
View PCD Engineering Division
8/13/2020 12:30:40 PM
(PBMP-Applicability Form redlines) 8/13/2020 12:30:40 PM
View PCD Engineering Division
8/13/2020 12:29:56 PM
(SDI redlines) 8/13/2020 12:29:56 PM
View PCD Engineering Division
8/13/2020 12:29:20 PM
(FAE redlines) 8/13/2020 12:29:20 PM
View PCD Engineering Division
8/13/2020 12:28:46 PM
(FDR redlines summary) 8/13/2020 12:28:46 PM
View PCD Engineering Division
8/13/2020 12:28:07 PM
(FDR redlines) 8/13/2020 12:28:07 PM
View PCD Engineering Division
8/13/2020 12:27:28 PM
(Plat redlines) 8/13/2020 12:27:28 PM
View PCD Engineering Division
8/13/2020 12:14:37 PM
(LOI redlines) 8/13/2020 12:14:37 PM
View PCD Engineering Division
8/13/2020 12:13:45 PM
See comment letter and redlines. 8/13/2020 12:13:45 PM
View PCD Engineering Division
4/3/2020 3:39:52 PM
(redlines summary) 4/3/2020 3:39:52 PM
View PCD Engineering Division
4/3/2020 3:39:05 PM
(PBMP App redlines -- additional clarification to Stormwater redlines) 4/3/2020 3:39:05 PM
View PCD Engineering Division
4/3/2020 3:37:52 PM
(CD redlines) 4/3/2020 3:37:52 PM
View PCD Engineering Division
4/3/2020 3:37:17 PM
(FDR redlines) 4/3/2020 3:37:17 PM
View PCD Engineering Division
4/3/2020 3:36:42 PM
(Plat redlines) 4/3/2020 3:36:42 PM
View PCD Engineering Division
4/3/2020 3:34:58 PM
(TIS redlines) 4/3/2020 3:34:58 PM
View PCD Engineering Division
4/3/2020 3:32:45 PM
See comment letter and redlines. 4/3/2020 3:32:45 PM
PCD Project Manager
4/2/2020 4:51:32 PM
Conference call needs to be scheduled. Please email planner with available dates going a few weeks out.
This application is not a minor subdivision, see EA19185. A minor subdivision was only recommended for legalizing 1 lot, not creating 4 new lots.
Jeff Rice will be providing general direction as to what the engineers will be looking for on the project.
If applicant wishes to proceed with 4 lots then a preliminary plan and final plat will be required.
Based on the comments from engineering, the applicant may want to refocus on only legalizing the current lot, and at a later date work on a vacation and replat. If that is the case, the applicant can resume the minor subdivision application update documents for a 1 lot subdivision and resubmit in its entirety.
4/2/2020 4:51:32 PM
View EPC Health Department
3/28/2020 2:02:48 PM
3/28/2020 2:02:48 PM
View County Attorney - Development Review
3/26/2020 3:31:31 PM
1. Proposed changes to SIA are attached. If they are acceptable, please accept through track changes and resubmit a final draft.
2. I have sought clarification from the Project Manager regarding the detention maintenance agreements. I will review during the next referral cycle.
3/26/2020 3:31:31 PM
View EPC Stormwater Review
3/26/2020 2:53:28 PM
SWMP Checklist_V1 Stormwater Comments 3/26/2020 2:53:28 PM
View EPC Stormwater Review
3/26/2020 2:52:52 PM
SWMP_V1 Stormwater Comments 3/26/2020 2:52:52 PM
View EPC Stormwater Review
3/26/2020 2:41:54 PM
GEC Checklist_V1 Stormwater Comments 3/26/2020 2:41:54 PM
View EPC Stormwater Review
3/26/2020 2:41:17 PM
GEC Plan_V1 Stormwater Comments 3/26/2020 2:41:17 PM
View EPC Stormwater Review
3/26/2020 2:38:33 PM
FAE_V1 Stormwater Comments 3/26/2020 2:38:33 PM
View EPC Stormwater Review
3/26/2020 2:37:39 PM
PBMP Applicability Form_V1 Stormwater Comments 3/26/2020 2:37:39 PM
EPC Stormwater Review
3/26/2020 2:36:10 PM
Review 1:
- O&M: Please use the approved Timberline O&M for this project (PPR1942)
- Construction Drawings: The pond access ramp shall be a minimum of 15 ft wide, in accordance with DCM Vol. 1 Section 11.2.2
- ESQCP: Add PCD Project Numbers: MS-20-002 & PPR-20-004

Additional Stormwater comments have been provided on the following uploaded documents:
- PBMP Applicability Form
- FAE
- GEC Plan
- GEC Checklist
- SWMP
- SWMP Checklist

Reviewed by:
Christina Furchak
Stormwater Engineer III
christinafurchak@elpasoco.com
3/26/2020 2:36:10 PM
Colorado Springs Public Works
3/26/2020 11:27:54 AM
SWENT has no comment on this project.

T.J. Gajda
3/26/2020 11:27:54 AM
Colorado Springs Public Works
3/26/2020 11:12:41 AM
Traffic Engineering has no comments on this item.

Zaker Alazzeh, P.E.
Traffic Engineering Manager
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
3/26/2020 11:12:41 AM
Pikes Peak Regional Building Department
3/25/2020 3:45:39 PM
Regarding a request for approval of a final plat for the Dwire Storage Yard Filing No. 1, Enumerations has the following comments:

1. This plat shows an access easement running along the east side of the proposed lots. Given the distances involved, Enumerations would prefer that this access easement be a named private street, assuming that there is no intention to extend Capital Dr. as a public street. Contact Justin Annan (jannan@elpasoteller911.org) or Glenn West (gwest@elpasoteller911.org) to submit a list of proposed private street names. All addresses will be assigned from this private street.
2. The applicant should submit a copy of this development to Enumerations for addressing once a street name has been approved. Indicate all lots and tracts which will require an address with (XXXX). Once addressing has been assigned, Enumerations will return them to the applicant to be placed on the mylar. Prior to recording, Enumerations will review the mylar for addressing, title block, street names and floodplain statement. An Enumerations fee of $10 per lot/tract addressed will be due at the time of mylar review.
3. Enumerations will not approve any building plans submitted for review/permit without a copy of the final plat in our records.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
3/25/2020 3:45:39 PM
Falcon Fire Protection District
3/25/2020 12:42:36 PM
Falcon Fire has reviewed this request for the Dwire Minor Subdivision and has no abjections or requests at this time. 3/25/2020 12:42:36 PM
View Colorado Springs Airport Advisory Commission
3/23/2020 2:51:07 PM
The attached land use review summary with comments was to be presented at the March 25, 2020 Airport Advisory Commission meeting prior to it being canceled. The summary will be presented at the next Commission meeting. 3/23/2020 2:51:07 PM
Colorado Springs Public Works
3/23/2020 2:07:52 PM
City of Colorado Springs Engineering Development Review has no comments on this item.

Patrick Morris
Public Works/Engineering Development Review.
3/23/2020 2:07:52 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/23/2020 8:54:53 AM
Hey Gabe,

Attached is the review memo for the subject application. Let me know if you need anything further from me.

Thanks,

Ryne
3/23/2020 8:54:53 AM
View Colorado Division of Water Resources
3/20/2020 1:47:55 PM
3/20/2020 1:47:55 PM
View Parks Advisory Board
3/18/2020 4:18:52 PM
No PAB Endorsement Necessary. 3/18/2020 4:18:52 PM
View EPC Parks Department
3/18/2020 4:14:54 PM
No PAB Endorsement Necessary. 3/18/2020 4:14:54 PM
View Mountain View Electric Association, Inc.
3/17/2020 12:27:54 PM
3/17/2020 12:27:54 PM
Colorado Geological Survey
3/16/2020 2:31:23 PM
The available referral documents include a Soils and Geology Study, Dwire Storage Yard, Filing No. 1 (RMG, March 4, 2020) and, as Appendix B, a Geotechnical Report, Dwire Office Building, 3500 Capital Drive (RMG, May 3, 2019). The Dwire Minor Subdivision site is not exposed to any geologic hazards or unusual geotechnical constraints that would preclude the proposed industrial uses and density. RMG makes appropriate site development recommendations. Provided RMG's recommendations are adhered to, CGS has no objection to approval of the four-lot minor subdivision as proposed. 3/16/2020 2:31:23 PM
Colorado State Forest Service
3/16/2020 10:55:24 AM
The primary wildland fuel type for this proposal is grassland with scattered trees having a low wildfire hazard potential. No special fire mitigation plans or other actions are necessary for final approval by the Colorado State Forest Service. 3/16/2020 10:55:24 AM
911 Authority - El Paso/Teller County
3/11/2020 12:50:27 PM
In reference to the 50' access leading to lots 2-4:
-Is this intended as a logical extension of Capital Dr?
-Is the access a private drive?

Thanks
Justin
3/11/2020 12:50:27 PM
Cherokee Metro Dist
3/6/2020 10:36:58 AM
The Dwire Storage Yard is included in Cherokee Metro District's service area and Cherokee has adequate water and wastewater treatment capacity to serve this customer. 3/6/2020 10:36:58 AM
View EPC Environmental Services
3/6/2020 8:46:48 AM
3/6/2020 8:46:48 AM
County Attorney - Water
3/5/2020 4:00:44 PM
County Attorney's Office will provide water findings once Colorado Division of Water Resources provides a sufficiency letter. 3/5/2020 4:00:44 PM
RBD Floodplain
3/5/2020 2:46:05 PM
add "no build" to the USE block for tract A in the Tract Table 3/5/2020 2:46:05 PM