Project Review Comments

Back to List


Project Name
The Reserve at Corral Bluffs Filing No. 4
Description
A request for a final plat for 5 lots and drainage improvements
Location
South of Blaney Road approximately 2000 feet, off of Corral Ranch Road
Parcels
4331000023 4331000023 4331000025 4331000025 4332000016 4332000016
Applicant
Land Resource Associates
Dave Jones ( chipita1@comcast.net )
(719) 684-2298
Dave Jones ( chipita1@comcast.net )
(719) 684-2298
EA Number
EA19202
File Number
SF208
Project Manager
Ryan Howser
Status
Closed
Created
10/29/2019 9:18:41 AM

View: Project Documents



Review Comments (33)

Link Agency Comment
County Attorney - Water
5/5/2021 2:31:54 PM
Comments from 4/17 have been addressed. No outstanding comments. 5/5/2021 2:31:54 PM
County Attorney - Water
4/17/2021 10:26:39 AM
Please add to the 2nd Amendment to the CCRs the provisions required by the County Attorney's water review dated 9/25/20. 4/17/2021 10:26:39 AM
PCD Engineering Division
12/16/2020 5:23:54 PM
Engineering comments have been resolved. No further comments. The engineering documents will be uploaded by the project manager once approved by the ECM administrator. 12/16/2020 5:23:54 PM
EPC Stormwater Review
12/16/2020 1:48:19 PM
Stormwater has no additional comments. 12/16/2020 1:48:19 PM
PCD Project Manager
12/4/2020 3:35:52 PM
Planning Division has no further comments at this time. 12/4/2020 3:35:52 PM
View County Attorney - Water
9/25/2020 11:37:50 AM
9/25/2020 11:37:50 AM
View PCD Project Manager
9/17/2020 4:14:45 PM
Final plat redline attached. Also includes PCD Engineering Division comments. 9/17/2020 4:14:45 PM
PCD Engineering Division
9/14/2020 2:25:39 PM
Review 2 comments on the following document will be uploaded by the project manager:
-Final Plat

Upload a copy of the following documents:
- Pond Operations and Maintenance Manual. Unresolved.

* Address remaining comment and resubmit all engineering documents (to include the pond maintenance agreement) with the required signatures/stamps for final approval.
* Per ECM 5.9.4 upload AutoCAD base drawing and plat drawing with the final approval submittal. AutoCAD file shall include at least two survey reference points.

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
9/14/2020 2:25:39 PM
View PCD Project Manager
7/20/2020 1:28:49 PM
Final plat redline attached. Also includes PCD Engineering comments. 7/20/2020 1:28:49 PM
PCD Project Manager
7/20/2020 1:27:00 PM
As this application is a vacation and replat of Tract A of Filing 3, no scheduling for public hearing or any approval can be made until all issues on Filing 3 are resolved and the application scheduled for public hearing. 7/20/2020 1:27:00 PM
PCD Engineering Division
7/14/2020 7:38:07 AM
Review 2 comments on the following document will be uploaded by the project manager:
-Final Plat

Upload a copy of the following documents:
- Pond Maintenance agreement
- Pond Operations and Maintenance Manual

Comment resolved on the following document:
-Letter of Intent

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
7/14/2020 7:38:07 AM
County Attorney - Water
6/30/2020 10:49:00 AM
Please revise Water Supply Information Summary (WSIS) so water demand is calculated in acre-feet amounts and resubmit. Thank you. 6/30/2020 10:49:00 AM
Trails and Open Space Coalition
6/29/2020 12:01:11 PM
Our concern is for "off site impacts", impacts to Corral Bluffs Open Space adjacent to this proposal.
We'd like guarantees that development construction does not impact this highly sensitive public space.
Thank you.
6/29/2020 12:01:11 PM
PCD Project Manager
4/16/2020 3:34:31 PM
As this application is a vacation and replat of Tract A of Filing 3, no scheduling for public hearing or any approval can be made until all issues on Filing 3 are resolved and the application scheduled for public hearing. 4/16/2020 3:34:31 PM
View PCD Project Manager
4/16/2020 3:33:01 PM
Final Plat_V1 see attached redlines 4/16/2020 3:33:01 PM
View PCD Project Manager
4/16/2020 3:29:06 PM
LOI_V1 minor change 4/16/2020 3:29:06 PM
PCD Engineering Division
4/15/2020 5:39:12 PM
Review 1 comments on the following documents will be uploaded by the project manager:
-Final Plat
-Letter of Intent

Comments on engineering documents have been provided with the Filing No. 3 final plat application (SF207)

Reviewed by:
Daniel Torres
danieltorres@elpasoco.com
4/15/2020 5:39:12 PM
View Colorado Division of Water Resources
4/14/2020 4:51:45 PM
4/14/2020 4:51:45 PM
View Colorado Division of Water Resources
4/14/2020 4:51:13 PM
4/14/2020 4:51:13 PM
View Parks Advisory Board
4/14/2020 3:37:46 PM
El Paso County Community Services-Parks final comments. Please see attached documents (PAB endorsed 04-08-2020). 4/14/2020 3:37:46 PM
View EPC Health Department
4/14/2020 2:06:16 PM
4/14/2020 2:06:16 PM
Upper Black Squirrel Creek GWMD
4/10/2020 4:30:21 PM
Please see comments on filing 3, the same comments apply to this filing. 4/10/2020 4:30:21 PM
View Falcon Fire Protection District
4/3/2020 9:12:06 AM
4/3/2020 9:12:06 AM
EPC Stormwater Review
4/1/2020 4:19:26 PM
No Stormwater comments at this time 4/1/2020 4:19:26 PM
Pikes Peak Regional Building Department
3/31/2020 11:04:07 AM
STANDARD ENUMERATIONS COMMENTS-FINAL PLAT:

1. Enumerations will review the mylar prior to plat for address placement, street names and title block. **RBD Closure-Enumerations will review & stamp the mylar in pdf prior to recordation.**

2. $10.00 per lot & tract platting fee will be due at the time of the review of the mylar (2 addresses per lot & tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. **RBD closure- Fee’s will be collected once RBD is back in the office. Please add a contact to reach out to once back open.**

3. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. Amy@pprbd.org
3/31/2020 11:04:07 AM
County Attorney - Development Review
3/30/2020 11:56:51 AM
No SIA or Detention Maintenance Agreement submitted. Please re-refer if that changes. 3/30/2020 11:56:51 AM
View Mountain View Electric Association, Inc.
3/24/2020 11:24:42 AM
3/24/2020 11:24:42 AM
County Attorney - Water
3/23/2020 2:05:38 PM
County Attorney's Office will provide review of water sufficiency once findings are received from the Colorado Division of Water Resources. 3/23/2020 2:05:38 PM
View EPC Parks Department
3/19/2020 12:00:32 PM
See preliminary Parks comments and map attached. 3/19/2020 12:00:32 PM
View EPC Environmental Services
3/16/2020 1:43:53 PM
3/16/2020 1:43:53 PM
Colorado State Forest Service
3/16/2020 10:59:17 AM
The primary wildland fuel type for this proposal is grassland with scattered trees having a low wildfire hazard potential. No special fire mitigation plans or other actions are necessary for final approval by the Colorado State Forest Service. 3/16/2020 10:59:17 AM
911 Authority - El Paso/Teller County
3/11/2020 3:07:53 PM
Solberg Ct - Acceptable - Logical continuation of existing road

No action for E911
Thank you
Justin
3/11/2020 3:07:53 PM
RBD Floodplain
3/11/2020 1:55:54 PM
floodplain has no comment on this plat 3/11/2020 1:55:54 PM