Project Review Comments

Back to List


Project Name
Good Old Boys Variance of Use
Description
Location
Parcels
6326211002 6326211002
Applicant
Good Old Boys LLC
Ryan Clark ( goodoldboys53@yahoo.com )
(719) 217-4354
Ryan Clark ( goodoldboys53@yahoo.com )
(719) 217-4354
EA Number
EA19168
File Number
VA1910
Project Manager
Ryan Howser
Status
Closed
Created
10/8/2019 2:25:54 PM

View: Project Documents



Review Comments (18)

Link Agency Comment
View EPC Health Department
1/29/2020 4:54:21 PM
1/29/2020 4:54:21 PM
View PCD Project Manager
12/4/2019 7:48:07 AM
Revised Letter of Intent redline w/ engineer comments attached. 12/4/2019 7:48:07 AM
View PCD Project Manager
12/4/2019 7:47:43 AM
Revised Site Plan redline attached w/ engineer comments 12/4/2019 7:47:43 AM
EPC Code Enforcement
12/4/2019 7:23:22 AM
No comment/concerns. Pictures attached. 12/4/2019 7:23:22 AM
View EPC Code Enforcement
12/4/2019 7:22:18 AM
12/4/2019 7:22:18 AM
View EPC Code Enforcement
12/4/2019 7:22:05 AM
12/4/2019 7:22:05 AM
PCD Engineering Division
12/3/2019 10:33:38 PM
Review 1 comments on the following documents will be uploaded by the project manager:
-Letter of Intent
-Site Plan

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
12/3/2019 10:33:38 PM
PCD Project Manager
12/3/2019 8:23:26 AM
Due to the number, complexity, and nature of the comments, the re-submission will be reviewed as a first submission; therefore, new comments are likely to be made. 12/3/2019 8:23:26 AM
Pikes Peak Regional Building Department
12/2/2019 12:17:07 PM
Enumerations has no comment. 12/2/2019 12:17:07 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/2/2019 10:58:14 AM
12/2/2019 10:58:14 AM
View El Paso County Conservation Dist
11/25/2019 1:50:57 PM
11/25/2019 1:50:57 PM
View El Paso County Conservation Dist
11/25/2019 1:50:19 PM
11/25/2019 1:50:19 PM
View PCD Project Manager
11/25/2019 1:46:43 PM
Site plan redline attached. 11/25/2019 1:46:43 PM
View PCD Project Manager
11/25/2019 1:46:28 PM
Mineral rights certificate redline attached. 11/25/2019 1:46:28 PM
View PCD Project Manager
11/25/2019 1:46:01 PM
Letter of Intent Redline attached. See additional comments. 11/25/2019 1:46:01 PM
PCD Project Manager
11/25/2019 1:45:18 PM
Letter of intent does not adequately justify variance of use criteria is met per Section 5.3.4 of the Land Development Code. At a minimum, letter of intent shall express the following:
1. The strict application of any of the provisions of this Code would result in peculiar and exceptional practical difficulties or undue hardship.
2. The proposed use is compatible with the surrounding area, harmonious with the character of the neighborhood, not detrimental to the surrounding area, not detrimental to the future development of the area, and not detrimental to the health, safety, or welfare of the inhabitants of the area and County;
3. The proposed use will be able to meet air, water, odor or noise standards established by County, State or federal regulations during construction and upon completion of the project;
4. The proposed use will comply with all applicable requirements of this Code and all applicable County, State and federal regulations except those portions varied by this action;
5. The proposed use will not adversely affect wildlife or wetlands;
6. The applicant has addressed all off-site impacts;
7. The site plan for the proposed variance of use will provide for adequate parking, traffic circulation, open space, fencing, screening, and landscaping; and/or
8. Sewer, water, storm water drainage, fire protection, police protection, and roads will be available and adequate to serve the needs of the proposed variance of use as designed and proposed.
11/25/2019 1:45:18 PM
Colorado Springs Planning & Community Development
11/14/2019 5:11:57 PM
The Colorado Springs Comprehensive Planning Division notes that this is a particularly challenging site, and we understand importance of supporting interim or transitional income- producing uses of properties. However in this case, and based on the limited information available in the submittal, we would suggest the standard to support a variance has not been met.

-Several properties in the vicinity have been annexed and this entire enclave is a logical candidate or future annexation. Allowing this use could impair the potential to create a solution of for the storm water deficiencies in this area, redevelop the remaining properties and ultimately have them annexed.

-This use would not appear to be compatible with the immediately adjacent residential uses, particularly in light of the fact that no viable site or operational plan appears to have been submitted.
11/14/2019 5:11:57 PM
RBD Floodplain
11/12/2019 2:29:07 PM
i have discussed this project with the applicant and the adjustments proposed to the fence satisfy the requirements our discussion. floodplain has no further comment 11/12/2019 2:29:07 PM