PCD Engineering Division
10/22/2019 11:49:08 AM |
Review 3 comments: Site Plan 1. Discrepancy with the grading plan for the golf course. Site plan notes "Future Golf Course" vs grading plan which notes "Existing conc. cart path" and "Existing native berm". Revise to match. Unresolved. Comments resolved on the following documents: - Grading Plan - Drainage Letter (The project manager will upload the approved drainage letter) Reviewed by: Gilbert LaForce, PE gilbertlaforce@elpasoco.com |
10/22/2019 11:49:08 AM | |
View |
PCD Engineering Division
10/14/2019 9:44:41 AM |
Review 2 comments: Site Plan 1. Discrepancy with the grading plan for the golf course. Site plan notes "Future Golf Course" vs grading plan which notes "Existing conc. cart path" and "Existing native berm". Revise to match. 2. Grading Plan redline comments is attached. 3. Drainage Report: Submit with signatures. Reviewed by: Gilbert LaForce, PE gilbertlaforce@elpasoco.com |
10/14/2019 9:44:41 AM |
View |
EPC Health Department
10/9/2019 12:39:40 PM |
10/9/2019 12:39:40 PM | |
View |
EPC Health Department
9/11/2019 1:15:37 PM |
9/11/2019 1:15:37 PM | |
View |
PCD Engineering Division
9/4/2019 3:21:00 PM |
Review 1 redline comments to the site development plan is attached. | 9/4/2019 3:21:00 PM |
View |
PCD Engineering Division
9/12/2019 11:51:59 AM |
Review 1 comment update: The site is currently covered by the active ESQCP permit for Flying Horse North Filing No. 1. The approved GEC for Filing 1 includes the golf course maintenance site. The owner for the maintenance building is the same as the active permit (PRI #2 LLC). Therefore, the following documents are not required: ESQCP, GEC, FAE, and SWMP. The SWMP administrator shall follow the procedures for revising BMPs and the SWMP as outlined in the SWMP report. The following documents are required with this project: -Drainage Letter -Grading Plan (Grading plan to show existing and proposed contours, proposed culvert construction detail, Finished Flood Elevation, existing BMPs, and reference to the active ESQCP and GEC Plan that covers the FHN Maintenance Building) Reviewed by: Gilbert LaForce, PE gilbertlaforce@elpasoco.com |
9/12/2019 11:51:59 AM |
Pikes Peak Regional Building Department
9/3/2019 11:06:51 AM |
1. Address assigned to the maintenance building is 5770 Old Stagecoach Road. Shed-5772 Old Stagecoach Road. 2. No further comment. |
9/3/2019 11:06:51 AM | |
View |
PCD Project Manager
8/30/2019 12:46:04 PM |
Redlined site development plan | 8/30/2019 12:46:04 PM |
View |
PCD Project Manager
8/30/2019 12:45:44 PM |
Redlined letter of intent | 8/30/2019 12:45:44 PM |
View |
PCD Project Manager
8/30/2019 12:45:22 PM |
Redlined landscaping plan | 8/30/2019 12:45:22 PM |
View |
PCD Project Manager
8/30/2019 12:44:53 PM |
Redlined Floorplans | 8/30/2019 12:44:53 PM |
View |
PCD Project Manager
8/30/2019 12:44:27 PM |
Redlined Application | 8/30/2019 12:44:27 PM |
View |
Mountain View Electric Association, Inc.
8/27/2019 4:28:48 PM |
8/27/2019 4:28:48 PM | |
Black Forest Land Use Committee
8/25/2019 2:07:15 PM |
The Black Forest Land Use Committee has no objection to this maintenance building location or construction. | 8/25/2019 2:07:15 PM |