View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
10/1/2019 12:22:03 PM |
1. It is not clear whether there will be an access connection to Southmoor Drive with this site development plan. If there will be a connection, any construction in the County right-of-way will require County-approved construction drawings. 2. Ensure that stormwater quantity and quality impacts are addressed; no drainage study was received. Applicant is required to apply with the County for review of any drainage construction, such as the offsite detention pond, located within unincorporated El Paso County. Jeff Rice -- 719-520-7877 |
10/1/2019 12:22:03 PM | |
View |
PCD Project Manager
7/26/2019 1:04:23 PM |
Review 1 Comments | 7/26/2019 1:04:23 PM |
PCD Engineering Division
7/19/2019 11:19:09 AM |
1. Ensure that any traffic impacts to Main Street and Soouthmoor Drive are adequately addressed; a traffic impact study was not received. 2. Ensure that stormwater quantity and quality impacts are addressed; no drainage study was received. 3. Reference comments on adjacent County projects: https://epcdevplanreview.com/Public/SearchResults?PName=river%20bend%20residential&Year=0&EndYear=0&Class=0&SubClass=0 Jeff Rice -- 719-520-7877 |
7/19/2019 11:19:09 AM |