Project Review Comments

Back to List


Project Name
River Bend Crossing
Description
Site Development Plan
Location
Applicant
CIty of Fountain - Gaby Serrano
Gaby Serrano ( gserrano@fountaincolorado.org )
(719) 322-2017
Gaby Serrano ( gserrano@fountaincolorado.org )
(719) 322-2017
File Number
OAR1932
Project Manager
Lindsay Darden
Status
Closed
Created
7/15/2019 7:52:24 AM

View: Project Documents



Review Comments (3)

Link Agency Comment
PCD Engineering Division
10/1/2019 12:22:03 PM
1. It is not clear whether there will be an access connection to Southmoor Drive with this site development plan. If there will be a connection, any construction in the County right-of-way will require County-approved construction drawings.

2. Ensure that stormwater quantity and quality impacts are addressed; no drainage study was received. Applicant is required to apply with the County for review of any drainage construction, such as the offsite detention pond, located within unincorporated El Paso County.

Jeff Rice -- 719-520-7877
10/1/2019 12:22:03 PM
View PCD Project Manager
7/26/2019 1:04:23 PM
Review 1 Comments 7/26/2019 1:04:23 PM
PCD Engineering Division
7/19/2019 11:19:09 AM
1. Ensure that any traffic impacts to Main Street and Soouthmoor Drive are adequately addressed; a traffic impact study was not received.

2. Ensure that stormwater quantity and quality impacts are addressed; no drainage study was received.

3. Reference comments on adjacent County projects: https://epcdevplanreview.com/Public/SearchResults?PName=river%20bend%20residential&Year=0&EndYear=0&Class=0&SubClass=0

Jeff Rice -- 719-520-7877
7/19/2019 11:19:09 AM