PCD Engineering Division
12/11/2019 7:23:05 AM |
The drainage report has been approved by the ECM Administrator on 12/11/19. The project manager will upload the approved document. Reviewed by: Daniel Torres danieltorres@elpasoco.com |
12/11/2019 7:23:05 AM | |
View |
EPC Health Department
11/6/2019 9:10:03 PM |
11/6/2019 9:10:03 PM | |
PCD Engineering Division
11/5/2019 7:22:25 AM |
Review 2: Engineering comments have been resolved. Please provide a signed drainage report with the re-submittal. Reviewed by: Daniel Torres danieltorres@elpasoco.com |
11/5/2019 7:22:25 AM | |
PCD Project Manager
11/1/2019 2:16:43 PM |
No further Planning Comments. | 11/1/2019 2:16:43 PM | |
View |
PCD Project Manager
9/24/2019 5:58:36 PM |
Drainage Report Redlines | 9/24/2019 5:58:36 PM |
View |
PCD Project Manager
9/24/2019 5:58:13 PM |
Site Plan Redlines | 9/24/2019 5:58:13 PM |
PCD Project Manager
9/24/2019 5:51:45 PM |
Site Plan Please label all of the smaller existing structures shown on the site plan and/or aerial. Label any areas of outdoor space where animals have access. Clarify if veterinary services are provided at this location for animals not involved with the rescue, if this is just space where a veterinarian can visit and provide care on-site, or if there is a licensed onsite veterinarian. Check the parking calculations for total parking required and provided. It may be helpful if you stop breaking them down by building and calculate based on total usage for the site. Utilizing your square footages from the site plan, I calculate: Vet/Office 4,505 SF/200 = 23 spaces; Kennels 15635 SF/1000 = 16 spaces; Total Spaces Required = 39 spaces; HC parking = 2 spaces required, one shall be van accessible. Footnote 7 of Table 5-4 indicates that kennels shall be setback a minimum of 200 feet from all property lines. Provide dimension from the front property line to the new kennel building to demonstrate compliance with that requirement. |
9/24/2019 5:51:45 PM | |
PCD Engineering Division
9/12/2019 5:18:04 PM |
Review 1 comments on the following documents will be uploaded by the project manager: -Site Plan -Drainage Report Reviewed by: Daniel Torres danieltorres@elpasoco.com |
9/12/2019 5:18:04 PM | |
Pikes Peak Regional Building Department
9/11/2019 2:06:06 PM |
1. If per construction code these buildings are truly attached as one, then an address will not be assigned to this kennel. 5335 J D Johnson Road should be used for the plan & permit. No further comment. |
9/11/2019 2:06:06 PM | |
View |
Mountain View Electric Association, Inc.
9/3/2019 2:21:08 PM |
9/3/2019 2:21:08 PM |