View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
2/6/2020 8:16:55 AM |
The revised plan has been approved. | 2/6/2020 8:16:55 AM | |
View |
PCD Engineering Division
1/27/2020 11:38:45 AM |
See GEC Plan redlines. The main issue is to show and label the large disturbed areas as as borrow or stockpile areas or show proposed contours, cuts and fills. | 1/27/2020 11:38:45 AM |
PCD Engineering Division
10/30/2019 1:24:44 PM |
Revised grading plan has been approved as conditioned on cover sheet. | 10/30/2019 1:24:44 PM | |
PCD Engineering Division
10/10/2019 2:13:43 PM |
1. Highlight which sheets have revisions on the cover sheet. 2. Provide owners' and engineer's signatures. 3. Show the following on the revised sheets (7 and 8): a. seeding and mulching in ditches b. road surfacing material c. TSBs where there is over one acre of contributing disturbed area d. limits of construction (show all areas of disturbance) |
10/10/2019 2:13:43 PM | |
PCD Engineering Division
7/29/2019 3:39:44 PM |
Provide signed SWMP and GEC checklists (also see e-mail). | 7/29/2019 3:39:44 PM | |
View |
PCD Engineering Division
7/26/2019 12:47:29 PM |
(SWMP redlines) | 7/26/2019 12:47:29 PM |
View |
PCD Engineering Division
7/26/2019 12:47:05 PM |
(GEC Plan redlines) | 7/26/2019 12:47:05 PM |
View |
PCD Engineering Division
7/26/2019 12:46:30 PM |
(PBMP App. Form) | 7/26/2019 12:46:30 PM |
View |
PCD Engineering Division
7/26/2019 12:47:57 PM |
See comment letter and redlines. A separate e-mail will be sent with checklist redlines. Items to be resubmitted: SWMP and SWMP checklist GEC Plan and checklist PBMP Applicability Form |
7/26/2019 12:47:57 PM |
View |
PCD Engineering Division
7/22/2019 1:07:26 PM |
(SWMP redlines) | 7/22/2019 1:07:26 PM |
View |
PCD Engineering Division
7/22/2019 1:06:59 PM |
(GEC redlines) | 7/22/2019 1:06:59 PM |
View |
PCD Engineering Division
7/22/2019 1:06:28 PM |
See comment letter and redlines. GEC/SWMP checklists and PBMP Applicability Form will be e-mailed. | 7/22/2019 1:06:28 PM |
View |
PCD Engineering Division
7/3/2019 3:42:46 PM |
(New ESQCP form) | 7/3/2019 3:42:46 PM |
View |
PCD Engineering Division
7/3/2019 3:42:17 PM |
(GEC Plan redlines) | 7/3/2019 3:42:17 PM |
View |
PCD Engineering Division
7/3/2019 3:41:33 PM |
(MDDP/FDR redlines - cover page only) | 7/3/2019 3:41:33 PM |
View |
PCD Engineering Division
7/3/2019 3:40:37 PM |
See comment letter and redlines. | 7/3/2019 3:40:37 PM |