Addition of new building and paved parking to support number of seats in existing sanctuary. Existing modular building will be removed after new building is occupiable.
Location
Parcels
6205000019 6205000019
Applicant
Crossroads Chapel SBC
Dr. D. L. Mitchell ( office@crossroadssbc.com )
(719) 290-1470
Dr. D. L. Mitchell ( office@crossroadssbc.com )
(719) 290-1470
EA Number
EA1925
File Number
PPR2039
Project Manager
Sophie Kiepe
Status
Closed
Created
2/28/2019 11:35:55 AM

View: Project Documents



Review Comments (13)

Link Agency Comment
View EPC Health Department
11/20/2020 10:42:08 AM
11/20/2020 10:42:08 AM
View PCD Project Manager
11/15/2020 9:55:59 PM
Please see redlines on the landscape plan. 11/15/2020 9:55:59 PM
View PCD Project Manager
11/15/2020 9:55:33 PM
Please see redlines on the lighting plan. 11/15/2020 9:55:33 PM
View PCD Project Manager
11/15/2020 9:54:24 PM
Please see redlines on the drainage report. 11/15/2020 9:54:24 PM
View PCD Project Manager
11/15/2020 9:53:56 PM
Please see redlines on the site plan. 11/15/2020 9:53:56 PM
View PCD Project Manager
11/15/2020 9:53:30 PM
Please see redlines on the letter of intent. 11/15/2020 9:53:30 PM
PCD Project Manager
11/15/2020 9:47:48 PM
Floor Plans - Please label the proposed uses for the various rooms on the floorplan. If there is a lower basement level, please provide floorplan for that as well as a second sheet to the floorplan document that you upload. 11/15/2020 9:47:48 PM
PCD Project Manager
11/10/2020 10:01:08 AM
Elevations - Please provide elevations for the North and South as well. 11/10/2020 10:01:08 AM
Pikes Peak Regional Building Department
11/6/2020 8:56:10 AM
Regarding a request for approval of a development plan at 840 Northgate Blvd, Enumerations has the following comments:

1. The site plan shows the proposed building attached to the existing structures via a hallway. If RBD construction plan reviewers determine at the time of building plan review that this is an addition, rather that a new building, then it will use the existing 840 Northgate Blvd. address. If, however, they determine that it is a separate building, then a new address will be assigned to this building.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
11/6/2020 8:56:10 AM
EPC Stormwater Review
11/3/2020 1:37:11 PM
Stormwater has no comments at this time. 11/3/2020 1:37:11 PM
PCD Engineering Division
10/29/2020 11:05:31 AM
Review 1 comments on the following documents will be uploaded by the project manager:
- Drainage Letter
- Site Plan

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
719-520-7945
10/29/2020 11:05:31 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/29/2020 10:48:07 AM
No apparent conflicts - recommend approval. Per the drawings in the set, I see no proposed utility work. If any connection to CSU water or wastewater were required to gain on-site utilities, an Annexation would be required. Please let me know if there are any questions.
-Kyle Schelhaas, kschelhaas@csu.org
10/29/2020 10:48:07 AM
View Mountain View Electric Association, Inc.
10/28/2020 3:11:50 PM
10/28/2020 3:11:50 PM