EPC Health Department
11/20/2020 10:42:08 AM |
11/20/2020 10:42:08 AM | |
View |
PCD Project Manager
11/15/2020 9:55:59 PM |
Please see redlines on the landscape plan. | 11/15/2020 9:55:59 PM |
View |
PCD Project Manager
11/15/2020 9:55:33 PM |
Please see redlines on the lighting plan. | 11/15/2020 9:55:33 PM |
View |
PCD Project Manager
11/15/2020 9:54:24 PM |
Please see redlines on the drainage report. | 11/15/2020 9:54:24 PM |
View |
PCD Project Manager
11/15/2020 9:53:56 PM |
Please see redlines on the site plan. | 11/15/2020 9:53:56 PM |
View |
PCD Project Manager
11/15/2020 9:53:30 PM |
Please see redlines on the letter of intent. | 11/15/2020 9:53:30 PM |
PCD Project Manager
11/15/2020 9:47:48 PM |
Floor Plans - Please label the proposed uses for the various rooms on the floorplan. If there is a lower basement level, please provide floorplan for that as well as a second sheet to the floorplan document that you upload. | 11/15/2020 9:47:48 PM | |
PCD Project Manager
11/10/2020 10:01:08 AM |
Elevations - Please provide elevations for the North and South as well. | 11/10/2020 10:01:08 AM | |
Pikes Peak Regional Building Department
11/6/2020 8:56:10 AM |
Regarding a request for approval of a development plan at 840 Northgate Blvd, Enumerations has the following comments: 1. The site plan shows the proposed building attached to the existing structures via a hallway. If RBD construction plan reviewers determine at the time of building plan review that this is an addition, rather that a new building, then it will use the existing 840 Northgate Blvd. address. If, however, they determine that it is a separate building, then a new address will be assigned to this building. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org |
11/6/2020 8:56:10 AM | |
EPC Stormwater Review
11/3/2020 1:37:11 PM |
Stormwater has no comments at this time. | 11/3/2020 1:37:11 PM | |
PCD Engineering Division
10/29/2020 11:05:31 AM |
Review 1 comments on the following documents will be uploaded by the project manager: - Drainage Letter - Site Plan Reviewed by: Gilbert LaForce, PE gilbertlaforce@elpasoco.com 719-520-7945 |
10/29/2020 11:05:31 AM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/29/2020 10:48:07 AM |
No apparent conflicts - recommend approval. Per the drawings in the set, I see no proposed utility work. If any connection to CSU water or wastewater were required to gain on-site utilities, an Annexation would be required. Please let me know if there are any questions. -Kyle Schelhaas, kschelhaas@csu.org |
10/29/2020 10:48:07 AM | |
View |
Mountain View Electric Association, Inc.
10/28/2020 3:11:50 PM |
10/28/2020 3:11:50 PM |