Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
2/12/2020 1:23:32 PM |
Documents sent to ECM Administrator for approval. Applicant may schedule a Pre-Construction conference at this time. Steve Kuehster 719-520-6813 |
2/12/2020 1:23:32 PM | |
View |
County Attorney - Development Review
1/27/2020 3:01:08 PM |
1. All proposed changes to SIA have been addressed except correct identification of the property owner. 2. Proposed changes to the Detention Maintenance Agreement are attached. The first 3 documents required in paragraph 8.a. have been provided. Please provide a copy of the HOA minutes as required in 8.a. I also do not find the specific provisions required by paragraphs 8.b. and 8.c. in the HOA covenants. 3. Reminder to submit a petition for PID inclusion if desired. |
1/27/2020 3:01:08 PM |
PCD Engineering Division
1/16/2020 8:57:39 AM |
Engineering Final Submittal Checklist for Electronic Submittals Checklist Items below: Drainage Report (signed) Traffic Impact Study (signed) Grading & Erosion Control Plan (signed) Street Construction Plans (signed) Deviation Request (signed) MS4 Post Construction Form and SDI worksheet DPW POC: Proof of embankment/pond submittal to State Engineer ESQCP (signed) DPW POC: * Financial Assurance Estimate, SIA (signed) * Pond/BMP Maint. Agreement and Easement (signed) * Operation & Maintenance Manual Pre-Development Site Grading Acknowledgement and Right of Access Form (signed) Other: Offsite Easements, Other Permits (FEMA LOMR, USACE, Floodplain…), Conditions of Approval, etc. _ Pre-Construction Checklist: Work Within the ROW Permit (DPW or CDOT) * Stormwater Management Plan (SWMP) Submit to DSD-Inspection 2 weeks prior to precon * Colorado Discharge Permit (COR:______________________ ) * County Construction Activity Permit * CDPHE APEN – (if over 25 ac. or 6 mos.) * Financial Surety (Letter of Credit/Bond/Collateral/Check) Construction Permit Fee: Major Final Plat (CO and/or PBMPS and/or offsite impvts.) (Verify fees with Inspections Supervisor at time of scheduling) $ 4,437.00 Other:______________________________________ * - required items to obtain an ESQCP ** - after recordation Permit Fee and Collateral must be separate checks Post Construction Submittal Checklist: (ECM 5.10.6) As-Built Drawings Pond Certification Letter Acceptance Letter for wet utilities |
1/16/2020 8:57:39 AM | |
PCD Engineering Division
1/16/2020 8:55:20 AM |
Review three (3) summary: GEC SWMP checklist finalized and stamped "Reviewed" PBMP Applicability finalized and stamped "Reviewed" Minor comments uploaded on the following items: GEC V_3, Plat V_3, FAE V_3, CD's V_3, SWMP V_3. It is requested that the GEC and CD plan set be combined as one document when resubmitted for signatures. The Deviations file labeled Deviations V_3 (which include all 3 deviations) have been reviewed and placed in the "for signature & approval" file for the ECM Administrator. The ESQCP is acceptable & is in the same file awaiting the pre-construction conference. The following items where previously approved and or accepted during the Site Plan review: The Drainage Report, The Traffic Impact study Including the signal warrant analysis. It is acknowledged that the Applicant is working with the County Attorney's office on the Detention Pond Maintenance Agreement. PLEASE PROVIDE THE FOLLOWING ITEMS as submittal requirements due to the construction of detention ponds in this filing: SDI Form. MS4 form. Colo. non-jurisdictional impoundment structure form. Steve Kuehster 719-641-0158 |
1/16/2020 8:55:20 AM | |
View |
PCD Engineering Division
1/16/2020 8:39:14 AM |
GEC V_3 redlines Minor comment Steve Kuehster 719-641-0158 |
1/16/2020 8:39:14 AM |
View |
PCD Engineering Division
1/16/2020 8:37:41 AM |
FAE V_3 redlines Minor comment Steve Kuehster 719-641-0158 |
1/16/2020 8:37:41 AM |
View |
PCD Engineering Division
1/16/2020 8:36:09 AM |
CDs V_3 redlines Minor comment Steve Kuehster 719-641-0158 |
1/16/2020 8:36:09 AM |
View |
PCD Engineering Division
1/16/2020 8:35:22 AM |
SWMP V_3 redlines Minor comment Steve Kuehster 719-641-0158 |
1/16/2020 8:35:22 AM |
View |
PCD Project Manager
1/6/2020 1:43:19 PM |
The plat 2 red line comments did not all get addressed. Similar comments still apply. | 1/6/2020 1:43:19 PM |
View |
County Attorney - Development Review
12/17/2019 1:11:59 PM |
1. Proposed changes to SIA attached. If acceptable, please accept all changes in document and return for final review. 2. Please submit a Detention Maintenance Agreement in Word for any detention basins or stormwater BMPs serving the subdivision. |
12/17/2019 1:11:59 PM |
View |
County Attorney - Development Review
12/17/2019 1:07:42 PM |
If the developer wishes to include the subdivision in Public Improvement District No. 2, please complete the attached petition in full and submit to the County Attorney's Office, along with a legal description of the subdivision in Word. State law requires that legal notice of the BoCC hearing to include the property in the PID be published. Developer is responsible for reimbursing the County Attorney's Office for the cost of publication. The inclusion hearing must be held before the plat is recorded. The County Attorney's Office makes every attempt to schedule the inclusion hearing on the date of BoCC or administrative approval of the plat, or as close thereto as possible. The developer and County Planning are responsible to keep the County Attorney's Office informed of the anticipated plat approval date. |
12/17/2019 1:07:42 PM |
911 Authority - El Paso/Teller County
12/13/2019 8:07:12 AM |
Street names previously approved. No action for E911. Thank you. Justin |
12/13/2019 8:07:12 AM | |
PCD Project Manager
9/9/2019 9:01:35 AM |
Please contact review engineer for traffic comments- no redlines were provided. Steve Kuehster 520-6813 or Jeff Rice 520-7877. | 9/9/2019 9:01:35 AM | |
View |
PCD Project Manager
9/9/2019 9:00:29 AM |
GEC SWMP CHECKLIST Redlines 2 | 9/9/2019 9:00:29 AM |
View |
PCD Project Manager
9/9/2019 9:00:05 AM |
FAE Redlines 2 | 9/9/2019 9:00:05 AM |
View |
PCD Project Manager
9/9/2019 8:59:43 AM |
Drainage Redlines 2 | 9/9/2019 8:59:43 AM |
View |
PCD Project Manager
9/9/2019 8:59:16 AM |
Construction Drawings including GEC plan Redlines V 2 | 9/9/2019 8:59:16 AM |
View |
PCD Engineering Division
9/9/2019 8:40:30 AM |
See comment letter and redlines. | 9/9/2019 8:40:30 AM |
View |
PCD Project Manager
9/9/2019 8:12:10 AM |
Letter of Intent redlines version 2 -Planning Comments | 9/9/2019 8:12:10 AM |
View |
PCD Project Manager
9/9/2019 8:07:42 AM |
Plat Redlines Version 2 Planning | 9/9/2019 8:07:42 AM |
EPC Health Department
9/4/2019 3:26:32 PM |
See comments submitted 27May2019. | 9/4/2019 3:26:32 PM | |
View |
Parks Advisory Board
9/4/2019 3:05:26 PM |
El Paso County Community Services / Parks Final Comments, Review #2 - See Attached Documents (PAB Endorsed 05/08/2019) | 9/4/2019 3:05:26 PM |
View |
EPC Parks Department
9/4/2019 3:02:15 PM |
El Paso County Community Services / Parks Final Comments, Review #2 - See Attached Documents (PAB Endorsed 05/08/2019) | 9/4/2019 3:02:15 PM |
View |
Colorado Division of Water Resources
8/29/2019 12:05:27 PM |
8/29/2019 12:05:27 PM | |
Falcon Fire Protection District
8/27/2019 4:15:46 PM |
Falcon Fire has no new comments on this filing. | 8/27/2019 4:15:46 PM | |
Pikes Peak Regional Building Department
8/27/2019 9:40:20 AM |
1. Plat note 25 shall be on the plot plans as well, when submitting for permit to Regional Building Department. STANDARD ENUMERATIONS COMMENTS-FINAL PLAT: 1. Enumerations will review the mylar prior to plat for address placement, street names and title block. 2. $10.00 per lot & tract platting fee will be due at the time of the review of the mylar (2 addresses per lot & tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. 3. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Amy@pprbd.org |
8/27/2019 9:40:20 AM | |
Cimarron Hills Fire
8/13/2019 3:26:28 PM |
No review/comment as Filing 1 is not within Cimarron Hills Fire's jurisdiction. | 8/13/2019 3:26:28 PM | |
EPC County Attorney's Office
7/21/2019 12:13:51 PM |
County Attorney's Office will draft water review once there is a letter of sufficiency provided by the Colorado Division of Water Resources. | 7/21/2019 12:13:51 PM | |
US Postal Service
6/6/2019 4:07:42 PM |
Responds already submitted | 6/6/2019 4:07:42 PM | |
View |
Falcon Fire Protection District
5/31/2019 2:55:06 PM |
5/31/2019 2:55:06 PM | |
View |
EPC Health Department
5/27/2019 9:07:05 AM |
5/27/2019 9:07:05 AM | |
Cimarron Hills Fire
5/20/2019 3:36:35 PM |
No review/comment as Filing 1 is not within Cimarron Hills Fire's jurisdiction. | 5/20/2019 3:36:35 PM | |
PCD Project Manager
5/13/2019 7:59:48 AM |
Each Application Type D Formompleted for the specific plat or project. | 5/13/2019 7:59:48 AM | |
View |
PCD Engineering Division
5/9/2019 3:53:48 PM |
(SWMP redlines) | 5/9/2019 3:53:48 PM |
View |
PCD Engineering Division
5/9/2019 3:53:24 PM |
(Plat redlines) | 5/9/2019 3:53:24 PM |
View |
PCD Engineering Division
5/9/2019 3:53:01 PM |
(LOI redlines) | 5/9/2019 3:53:01 PM |
View |
PCD Engineering Division
5/9/2019 3:52:27 PM |
(additional PDR/FDR redlines) | 5/9/2019 3:52:27 PM |
View |
PCD Engineering Division
5/9/2019 3:51:57 PM |
(FAE redlines) | 5/9/2019 3:51:57 PM |
View |
PCD Engineering Division
5/9/2019 3:51:36 PM |
(CD redlines) | 5/9/2019 3:51:36 PM |
View |
PCD Engineering Division
5/9/2019 3:51:07 PM |
See comment letter and redlines. | 5/9/2019 3:51:07 PM |
View |
Parks Advisory Board
5/9/2019 9:52:45 AM |
El Paso County Community Services / Parks Final Comments - PAB Endorsed 05/08/2019 (Please see attached documents) | 5/9/2019 9:52:45 AM |
Upper Black Squirrel Creek GWMD
5/8/2019 5:29:07 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but would like to receive any future correspondence for this plan. | 5/8/2019 5:29:07 PM | |
View |
EPC Parks Department
5/3/2019 11:48:04 AM |
El Paso County Community Services / Park Preliminary Comments - To be presented to Park Advisory Board 05/082019 (Please see attached documents) | 5/3/2019 11:48:04 AM |
View |
Colorado Division of Water Resources
5/2/2019 2:48:43 PM |
5/2/2019 2:48:43 PM | |
Pikes Peak Regional Building Department
4/25/2019 2:19:30 PM |
1. Area will not be addressed until front doors placement is clear from DP comments. 2. (xxx) should indicate the front doors. Email Enumerations for clarification. Amy@pprbd.org 3. STANDARD ENUMERATIONS COMMENTS-FINAL PLAT: 1. Enumerations will review the mylar prior to plat for address placement, street names and title block. 2. $10.00 per lot & tract platting fee will be due at the time of the review of the mylar (2 addresses per lot & tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. 3. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Amy@pprbd.org or Brent@pprbd.org |
4/25/2019 2:19:30 PM | |
View |
Colorado Springs Airport Advisory Commission
4/25/2019 2:11:10 PM |
At the AAC meeting held on Wednesday, April 25th, the AAC approved the attached land use summary and associated comments. | 4/25/2019 2:11:10 PM |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
4/24/2019 9:40:20 AM |
Hey Kari, I have finished with the review for the subject application. CSU has no comments and approval is recommended. Please let me know if you need anything further from me. Thanks, Ryne |
4/24/2019 9:40:20 AM | |
View |
EPC Environmental Services
4/19/2019 1:04:20 PM |
4/19/2019 1:04:20 PM | |
View |
911 Authority - El Paso/Teller County
4/16/2019 9:50:39 AM |
See attached for comments Thank you Justin |
4/16/2019 9:50:39 AM |