Project Review Comments

Back to List


Project Name
Flying Horse North Lot 35 Vacation and Replat
Description
Replat of Lot 35 into 2 lots
Location
Parcels
6136004004 6136004004
Applicant
Classic Consulting
Douglas Reinelt ( DReinelt@classicconsulting.net )
(719) 785-2801
Douglas Reinelt ( DReinelt@classicconsulting.net )
(719) 785-2801
EA Number
EA-17-019
File Number
SF1842
Project Manager
Nina Ruiz
Status
Closed
Created
10/30/2018 2:27:45 PM

View: Project Documents



Review Comments (27)

Link Agency Comment
View PCD Project Manager
3/13/2019 7:38:46 AM
Plat Redlines 3/13/2019 7:38:46 AM
Pikes Peak Regional Building Department
3/13/2019 7:14:16 AM
no further comments 3/13/2019 7:14:16 AM
PCD Project Manager
3/13/2019 7:42:27 AM
1. The gas commitment letter is for 1920 Baptist Road LLC Subdivision.

The comments are minimal at this time. However, the preliminary plan must be approved prior to the PC and BoCC hearing this item. The preliminary plan first review comments are due 3/18/19. A positive water finding will also be required by the EPC CAO.
3/13/2019 7:42:27 AM
PCD Engineering Division
3/6/2019 2:54:51 PM
Engineering has the following comment for the Plat drawing:
-Under the As-Platted drawing, provide a reference to General Note #26 with the "Ex. Drainage Easement Reception No. 218714238".
3/6/2019 2:54:51 PM
Black Forest Land Use Committee
2/20/2019 4:06:01 PM
The Black Forest Land Use Committee recommends approval of this division of lot 35 into two smaller lots. We understand this was the original plan under the PUD. 2/20/2019 4:06:01 PM
Lewis Palmer 38
2/15/2019 2:12:58 PM
Lewis-Palmer School District has no comments as to the Flying Horse North Lot 35 Vacation and Replat. 2/15/2019 2:12:58 PM
View Parks Advisory Board
2/14/2019 11:19:48 AM
El Paso County Community Services / Parks Final Comments (PAB Endorsed 02/13/2019) 2/14/2019 11:19:48 AM
View EPC Health Department
1/2/2019 12:41:00 PM
1/2/2019 12:41:00 PM
View PCD Project Manager
12/27/2018 8:42:26 AM
MDT Letter 12/27/2018 8:42:26 AM
View PCD Project Manager
12/27/2018 8:37:34 AM
Plat Redline 12/27/2018 8:37:34 AM
PCD Project Manager
12/27/2018 8:30:36 AM
5. The LOI includes 2 blank pages where I would expect to find an analysis of the review criteria. Please upload a version without blank pages that addresses the review criteria for a replat. 12/27/2018 8:30:36 AM
PCD Project Manager
12/27/2018 8:29:02 AM
4. The utility commitment letters and fire protection report are outdated. 12/27/2018 8:29:02 AM
PCD Project Manager
12/27/2018 8:13:08 AM
3. The assessor has not yet mapped the plat. Once the mapping is complete and a new schedule number has been assigned, all application documents will need to be revised accordingly. 12/27/2018 8:13:08 AM
PCD Project Manager
12/27/2018 8:11:09 AM
2. If the request is approved, at the time of recording you will need to pay any impact fees, the recording fee, provide title commitment dated within 30 days, zero tax certificate, have the Mylar stamped by enumerations, and provide a Mylar with all signatures other than County signatures. 12/27/2018 8:11:09 AM
View EPC Parks Department
12/21/2018 4:32:38 PM
El Paso County Community Services / Parks Preliminary Comments (PAB Endorsement on 01/09/2019) 12/21/2018 4:32:38 PM
View Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
12/20/2018 9:00:01 PM
12/20/2018 9:00:01 PM
Colorado Department of Transportation - Pueblo Office
12/18/2018 4:41:06 PM
CDOT has no comments as to the Flying Horse North Lot 35 Vacation and Replat. 12/18/2018 4:41:06 PM
Pikes Peak Regional Building Department
12/18/2018 10:20:01 AM
Enumerations/Floodplain has the following comments:

1. Proposed lot 1 will retain the existing address of 5315 & the new lot 2 will be assigned the address of 5355 Old Stagecoach Road.
2. Platting fee for the new lot only.
3. The El Paso County floodplain maps have updated since December 7, 2018. The new map series is “G”. The new effective date is December 7, 2018. Edit Floodplain statement.
Standard final plat comments apply:
ENUMERATIONS/FLOODPLAIN WILL REVIEW THE MYLAR PRIOR TO PLAT FOR ADDRESS PLACEMENT, ROAD NAMING, TITLE BLOCK, & FLOODPLAIN STATEMENT.

$10.00 PER LOT & TRACT FEE WILL BE DUE AT THE TIME OF THE REVIEW OF THE MYLAR. IF AN ADDRESS IS NOT NEEDED ON A TRACT THEN NO FEE APPLIES. CHECK SHOULD BE MADE OUT TO PIKES PEAK REGIONAL BUILDING DEPARTMENT. PAID DIRECTLY TO ENUMERATIONS DEPARTMENT.

A COPY OF THE FINAL RECORDED PLAT IS REQUIRED PRIOR TO PLAN SUBMITTAL FOR RESIDENTAL. A COPY OF THE FINAL RECORDED PLAT IS REQUIRED PRIOR TO APPROVAL IN ENUMERATIONS DEPARTMENT ON ANY COMMERCIAL PLANS SUBMITTAL.
12/18/2018 10:20:01 AM
PCD Engineering Division
12/17/2018 10:32:03 AM
Engineering comments have been provided on the Plat Drawing 12/17/2018 10:32:03 AM
Black Forest Land Use Committee
12/14/2018 10:37:15 AM
The Black Forest Land Use Committee has reviewed this proposal and recommends DENIAL of the request.

When Flying Horse North was approved, it had 1417 acres with 283 lots. This works out to exactly a 5-acre average for lot sizes and conforms with the Black Forest Preservation Plan.

With this vacation and replat, the lot average drops below 5 acres per lot average and violates the Preservation Plan.

Therefore, we recommend denial of this request.
12/14/2018 10:37:15 AM
View EPC Environmental Services
12/13/2018 12:17:13 PM
12/13/2018 12:17:13 PM
PCD Project Manager
12/11/2018 12:49:10 PM
1. Because you will be adding an additional lot that was not identified in the preliminary plan, we will need to open up the preliminary plan and the water finding to show that there is adequate water for the additional lot. Another option would be to amend the preliminary plan to swap densities where lot 35 becomes 2 lots, but you combine 2 lots in another area of the preliminary plan—perhaps near the clubhouse. Please let Nina know which route you prefer so that she may setup another application as needed. 12/11/2018 12:49:10 PM
View Mountain View Electric Association, Inc.
12/11/2018 11:11:43 AM
12/11/2018 11:11:43 AM
View 911 Authority - El Paso/Teller County
12/11/2018 9:25:00 AM
See attached for comments 12/11/2018 9:25:00 AM
View Colorado Division of Water Resources
12/10/2018 8:48:19 AM
12/10/2018 8:48:19 AM
Colorado State Forest Service
12/5/2018 11:20:51 AM
Dear Ms. Ruiz,

The Colorado State Forest Service recommends that all forested acres be mitigated to reduce the risk of wildfire and that defensible space be created for each dwelling using the standards in “Protecting Your Home From Wildfire: Creating Wildfire-Defensible Zones“ FIRE 2012-1 located on the Colorado State Forest Service website.

http://csfs.colostate.edu/pdfs/FIRE2012_1_DspaceQuickGuide.pdf

In addition, I recommend that all wildfire mitigation be completed before or during dwelling construction.
12/5/2018 11:20:51 AM
El Paso County Conservation Dist
12/4/2018 12:03:53 PM
The Board of Supervisors of the EL Paso County Conservation District have no comments at this time. 12/4/2018 12:03:53 PM