Project Review Comments

Back to List


Project Name
Steel Structures America
Description
Site Development Plan for Retail Sales, Mini-warehouse, Warehouse, RV and Boat Storage
Location
Parcels
7111303005 7111303005
Applicant
Steel Structures America
Justin Sternberg ( jessica@findssa.net )
(208) 659-4800
Justin Sternberg ( jessica@findssa.net )
(208) 659-4800
EA Number
EA18305
File Number
PPR1919
Project Manager
Lindsay Darden
Status
Closed
Created
10/18/2018 2:40:55 PM

View: Project Documents



Review Comments (52)

Link Agency Comment
PCD Project Manager
10/25/2019 9:26:41 AM
No further planning comments. 10/25/2019 9:26:41 AM
PCD Project Manager
10/20/2019 5:15:17 PM
Letter of Intent - the landscape plan mentions an alternative landscape request. This was not mentioned in the letter of intent. (Basically detail what was required and what is provided instead and justify the change.) 10/20/2019 5:15:17 PM
View PCD Project Manager
10/20/2019 5:12:13 PM
Please see landscape redlines. 10/20/2019 5:12:13 PM
PCD Project Manager
10/20/2019 5:11:18 PM
Per Land Development Code Section 6.2.5(D)(2)(c), a minimum of 1 in every 8 disabled parking spaces shall be designated "van accessible" and provide an 8 foot wide pedestrian access aisle. If only one disabled space is required, it shall be van accessible. Currently the space on your site plan appears to be a standard disabled space that does not provide the 8 foot wide access aisle. Please correct. 10/20/2019 5:11:18 PM
PCD Engineering Division
10/14/2019 2:49:46 PM
Review 5: Comments resolved. Project manager will upload the approved plans. 10/14/2019 2:49:46 PM
PCD Project Manager
9/24/2019 5:04:33 PM
Verify that the signage proposed with the sign plan is what you desire to install. We will not be able to approve a sign permit for signage that is not in compliance with the site plan if a sign plan was part of that submittal package. 9/24/2019 5:04:33 PM
View PCD Engineering Division
9/11/2019 1:02:25 PM
Review 4: Redline comments to the PBMP Assessment Form is attached. 9/11/2019 1:02:25 PM
View PCD Engineering Division
9/11/2019 11:23:09 AM
Review 4: Attached is the completed SWMP checklist. PCD Project Manager to add as additional document on file. 9/11/2019 11:23:09 AM
View PCD Engineering Division
9/11/2019 11:40:12 AM
Review 4 redline comments on the Financial Assurance Estimate is attached.

Comments resolved on the following documents:
- GEC
- SWMP

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
9/11/2019 11:40:12 AM
Mountain View Electric Association, Inc.
8/13/2019 1:58:17 PM
No additional comments at this time.
Cathy
Mountain View Electric Association, Inc.
8/13/2019 1:58:17 PM
View PCD Engineering Division
8/12/2019 3:06:46 PM
Attached is the completed GEC checklist. Project Manager to upload as an additional document on the project documents. 8/12/2019 3:06:46 PM
View PCD Engineering Division
8/12/2019 3:00:59 PM
Review 3 redlines to the Financial Assurance Estimate is attached. 8/12/2019 3:00:59 PM
View PCD Engineering Division
8/12/2019 2:10:13 PM
Review 3: Per the recent ECM update, complete and upload the attached Permanent BMP Applicability Form as an additional document. 8/12/2019 2:10:13 PM
View PCD Engineering Division
8/12/2019 3:02:30 PM
Review 3:
See the attached SWMP checklist for unresolved items. For the reuploaded checklist note the page where the missing items are located to expedite the review.

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
8/12/2019 3:02:30 PM
PCD Engineering Division
8/12/2019 3:03:39 PM
Review 3 comments on the following documents:
- Grading and Erosion Control Plan: On Sheet EC BMP Summary Table, update the installation of the Vehicle Tacking Control to "Prior to site grading". Also, do not include the checklist with the GEC this is uploaded as a separate document on eDARP.
- Financial Assurance

Comments resolved on the following documents:
- Site Development Plan (Sheet L1 Site Landscape Plan)
- Geotech Report
- Drainage Report

With minor comments remaining, make the necessary revisions and upload the engineering documents with owner and engineer signatures.

Reviewed by:
Gilbert LaForce, P.E.
gilbertlaforce@elpasoco.com
8/12/2019 3:03:39 PM
PCD Project Manager
8/8/2019 11:33:34 AM
No further planning comments. 8/8/2019 11:33:34 AM
EPC County Attorney's Office
8/1/2019 11:11:42 AM
Detention Maintenance Agreement is fine. No further comments. 8/1/2019 11:11:42 AM
View PCD Project Manager
7/11/2019 1:06:24 PM
Geotech report 7/11/2019 1:06:24 PM
View PCD Project Manager
7/11/2019 1:03:27 PM
Grading and Erosion Control Plan 7/11/2019 1:03:27 PM
View PCD Project Manager
7/11/2019 12:57:49 PM
Drainage Report 7/11/2019 12:57:49 PM
View PCD Project Manager
7/11/2019 12:57:08 PM
Engineering Site Development Plan 7/11/2019 12:57:08 PM
View PCD Project Manager
7/11/2019 9:59:25 AM
Landscaping Plan 7/11/2019 9:59:25 AM
View PCD Project Manager
7/11/2019 9:58:24 AM
Site Development Plan

Do not include lighting, landscaping, grading plans, etc. Just the cover sheet and the site plan.
7/11/2019 9:58:24 AM
View EPC County Attorney's Office
7/10/2019 10:23:19 AM
Please address the remaining comments on the Detention Maintenance Agreement, attached. 7/10/2019 10:23:19 AM
View Tri-Lakes-Monument Fire Protection District
7/10/2019 10:19:58 AM
Attached, JCB 7/10/2019 10:19:58 AM
Pikes Peak Regional Building Department
7/10/2019 9:46:16 AM
Contact Enumerations regarding my comment that has not been answered regarding the display building. Amy@pprbd.org 7/10/2019 9:46:16 AM
View PCD Engineering Division
7/8/2019 1:38:48 PM
Use the latest ESQCP Form (attached). The main difference is the information in Section 1.1, 1.2 and 1.3 (pages 3 and 4). 7/8/2019 1:38:48 PM
PCD Engineering Division
7/8/2019 1:39:52 PM
Use the latest financial assurance estimate form (2019).
Available for download at the following website address: https://planningdevelopment.elpasoco.com/planning-community-development/engineering/#1519834382859-d2efa5ee-acb0
7/8/2019 1:39:52 PM
View PCD Engineering Division
7/8/2019 9:48:10 AM
The ECM has been updated recently. The application must meet the current criteria. Complete and upload the attached SWMP and Grading and Erosion Control Plan checklist for review.

Review 2 comments on the following documents:
- Site Development Plan (Sheet L1 Site Landscape Plan)
- Grading and Erosion Control Plan
- Drainage Report
- Geotech Report

Comments resolved on the following documents:
- SDI worksheet
- O&M Manual
- Sign Plan
- State Non-Jurisdictional Water Impoundment Structure application form

Reviewed by:
Gilbert LaForce, P.E.
gilbertlaforce@elpasoco.com
7/8/2019 9:48:10 AM
View Mountain View Electric Association, Inc.
7/1/2019 1:34:04 PM
7/1/2019 1:34:04 PM
Woodmoor Water and Sanitation District
6/26/2019 3:32:31 PM
On the Site and Utility Plan:

No need to resubmit once the following changes are made.

Add WWSD signature block to SP

Show a 20' utility easement for the water line to the fire hydrant

Remove manhole attaching to main SS pipeline, and move monitoring manhole back onto 20' utility easement on the property. You can tap in to the mainline without adding a manhole to it.

Add the following details from WWSD standards:
- W-8
- S-2- G-6
- S-9
- S-11
- W-11

We will need to see plumbing plans for the office building.
6/26/2019 3:32:31 PM
View EPC Health Department
6/9/2019 7:04:15 PM
6/9/2019 7:04:15 PM
View PCD Project Manager
5/24/2019 2:30:17 PM
SWMP 5/24/2019 2:30:17 PM
View PCD Project Manager
5/24/2019 2:29:55 PM
Drainage Report 5/24/2019 2:29:55 PM
View PCD Project Manager
5/24/2019 2:28:53 PM
Financial Assurances 5/24/2019 2:28:53 PM
View PCD Project Manager
5/24/2019 2:28:23 PM
Grading and Erosion Control Plan 5/24/2019 2:28:23 PM
View PCD Project Manager
5/24/2019 2:27:08 PM
O and M 5/24/2019 2:27:08 PM
View PCD Project Manager
5/24/2019 2:26:23 PM
SDI worksheet 5/24/2019 2:26:23 PM
View PCD Project Manager
5/24/2019 2:24:54 PM
Sign Plan 5/24/2019 2:24:54 PM
View PCD Project Manager
5/24/2019 2:24:37 PM
Site Development Plan

Only submit the Cover sheet and the site development plan in this spot, do not include additional sheets.
5/24/2019 2:24:37 PM
View PCD Project Manager
5/24/2019 2:23:52 PM
Landscaping Plan 5/24/2019 2:23:52 PM
View PCD Project Manager
5/24/2019 2:23:33 PM
Floor Plans 5/24/2019 2:23:33 PM
View PCD Project Manager
5/24/2019 2:22:32 PM
Elevations 5/24/2019 2:22:32 PM
View Woodmoor Water and Sanitation District
5/22/2019 4:44:45 PM
Woodmoor Water and Sanitation, May 22, 2019 Response 5/22/2019 4:44:45 PM
Pikes Peak Regional Building Department
5/22/2019 1:51:06 PM
1. If the entry gate and/or fencing is over 7ft 1 an address will be assigned and a separate permit will be required, please clarify.
2. The office will retain the address of 18910 Base Camp Road. Will the Display building be staffed or just product display/storage? Each detached structure will receive a letter A, B, C & D; from 18910 west moving east in order.
5/22/2019 1:51:06 PM
View PCD Engineering Division
5/20/2019 8:56:16 AM
Review 1 See the attached Grading and Erosion Control (GEC) plan checklist for unresolved items. 5/20/2019 8:56:16 AM
View EPC County Attorney's Office
5/17/2019 2:18:56 PM
Revisions to Detention Maintenance Agreement are attached. 5/17/2019 2:18:56 PM
View PCD Engineering Division
5/16/2019 4:35:59 PM
Review 1 See the attached Stormwater Management Plan (SWMP) checklist for unresolved items. 5/16/2019 4:35:59 PM
PCD Engineering Division
5/20/2019 5:23:42 PM
Review 1 comments on the following documents:
- SDI worksheet
- O&M Manual
- Grading and Erosion Control Plan
- Financial Assurance Estimate
- Drainage Report
- SWMP
- Site Development Plan
- Sign Plan

Submit the following documents:
- a copy of the State Non-Jurisdictional Water Impoundment Structure application form
- geotechnical report. The report must include recommendation for the foundation preparation and embankment construction.

See the concurrent special use application (AL1913) for traffic memo redline comments.

No comments on the following documents:
ESQCP
MS4 Post Construction Form

Reviewed by:
Gilbert LaForce, P.E.
gilbertlaforce@elpasoco.com
5/20/2019 5:23:42 PM
Colorado Department of Transportation - Pueblo Office
5/15/2019 11:33:02 AM
CDOT staff does not have any comments for this development. Vehicular access is from internal roadway systems and operations impacts are off State Highway System. 5/15/2019 11:33:02 AM
View Mountain View Electric Association, Inc.
5/8/2019 2:17:19 PM
5/8/2019 2:17:19 PM
View Tri-Lakes-Monument Fire Protection District
5/3/2019 11:18:33 AM
See attached comments. JCB 5/3/2019 11:18:33 AM