Project Review Comments

Back to List


Project Name
Bent Grass Meadows Drive & Meridian Road
Description
Intersection improvements not limited to include drainage, utility easements, signalization & widening
Location
Parcels
5301000019 5301000019 5301000020 5301000020 5301000021 5301000021 5301000035 5301000035 5301000036 5301000036 5301000037 5301000037 5301101026 5301101026 5301101027 5301101027
Applicant
LSC Transportation Consultants, Inc.
Galloway Grant Dennis ( grantdennis@gallowayus.com )
(334) 651-8353
Galloway Grant Dennis ( grantdennis@gallowayus.com )
(334) 651-8353
File Number
CDR194
Project Manager
Kari Parsons
Status
Closed
Created
9/4/2018 2:59:25 PM

View: Project Documents



Review Comments (60)

Link Agency Comment
PCD Engineering Division
1/26/2021 3:20:14 PM
As discussed at the meeting January 6, please proceed with submittal of the signal plans to obtain review and approvals in time for construction to be completed concurrently with Bent Grass Residential Filing 2 buildout, unless otherwise directed.

Jeff Rice -- 719-520-7877
1/26/2021 3:20:14 PM
EPC Parks Department
9/30/2020 10:57:20 AM
No additional comments on behalf of El Paso County Parks. 9/30/2020 10:57:20 AM
View PCD Engineering Division
9/25/2020 4:13:46 PM
See comment letter. 9/25/2020 4:13:46 PM
EPC Stormwater Review
9/24/2020 8:10:47 AM
All Stormwater comments have been addressed. 9/24/2020 8:10:47 AM
EPC Stormwater Review
9/23/2020 8:27:56 AM
Review 4: Please submit the following signed documents:
- GEC Checklist
- SWMP Checklist

Stormwater comments have been resolved on the following documents:
- GEC
- SWMP

Reviewed by:
Christina Furchak
Stormwater Engineer III
christinafurchak@elpasoco.com
9/23/2020 8:27:56 AM
View PCD Engineering Division
9/21/2020 4:08:11 PM
(MUTCD sign dimension excerpts for information) 9/21/2020 4:08:11 PM
View PCD Engineering Division
9/21/2020 4:07:07 PM
(FAE redlines) 9/21/2020 4:07:07 PM
View PCD Engineering Division
9/21/2020 4:06:14 PM
(signal plans redlines summary) 9/21/2020 4:06:14 PM
View PCD Engineering Division
9/21/2020 4:05:35 PM
(signal plans redlines) 9/21/2020 4:05:35 PM
View PCD Engineering Division
9/21/2020 4:04:43 PM
(Sidewalk exhibit redlines) 9/21/2020 4:04:43 PM
View PCD Engineering Division
9/21/2020 4:04:00 PM
(FDR redlines summary) 9/21/2020 4:04:00 PM
View PCD Engineering Division
9/21/2020 4:03:25 PM
(FDR redlines) 9/21/2020 4:03:25 PM
View PCD Engineering Division
9/21/2020 4:01:44 PM
See comment letter and redlines. 9/21/2020 4:01:44 PM
View PCD Engineering Division
8/19/2020 7:10:28 PM
(Signal redlines summary) 8/19/2020 7:10:28 PM
View PCD Engineering Division
8/19/2020 7:09:30 PM
(Signal CD redlines) 8/19/2020 7:09:30 PM
View PCD Engineering Division
8/19/2020 7:08:54 PM
(Civil CD redlines summary) 8/19/2020 7:08:54 PM
View PCD Engineering Division
8/19/2020 7:08:31 PM
(Civil CD redlines) 8/19/2020 7:08:31 PM
View PCD Engineering Division
8/19/2020 7:07:50 PM
(FAE redlines) 8/19/2020 7:07:50 PM
View PCD Engineering Division
8/19/2020 7:07:17 PM
(MDDP-FDR redlines summary) 8/19/2020 7:07:17 PM
View PCD Engineering Division
8/19/2020 7:06:36 PM
(MDDP-FDR redlines) 8/19/2020 7:06:36 PM
View PCD Engineering Division
8/19/2020 7:05:56 PM
(TIS redlines summary) 8/19/2020 7:05:56 PM
View PCD Engineering Division
8/19/2020 7:05:24 PM
(TIS redlines) 8/19/2020 7:05:24 PM
View PCD Engineering Division
8/19/2020 7:04:59 PM
(LOI redlines) 8/19/2020 7:04:59 PM
View PCD Engineering Division
8/19/2020 6:56:30 PM
See comment letter and redlines. 8/19/2020 6:56:30 PM
View EPC Stormwater Review
8/17/2020 2:34:00 PM
SWMP_v3 8/17/2020 2:34:00 PM
View EPC Stormwater Review
8/17/2020 2:32:25 PM
GEC Checklist_v3 8/17/2020 2:32:25 PM
View EPC Stormwater Review
8/17/2020 2:30:39 PM
GEC_v3 8/17/2020 2:30:39 PM
EPC Stormwater Review
8/17/2020 2:29:28 PM
Stormwater comments have been provided on the following uploaded documents:
- GEC
- GEC Checklist
- SWMP

Reviewed by:
Christina Furchak
Stormwater Engineer III
christinafurchak@elpasoco.com
8/17/2020 2:29:28 PM
View PCD Engineering Division
7/17/2020 1:57:05 PM
(Signal CDs redlines summary) 7/17/2020 1:57:05 PM
View PCD Engineering Division
7/17/2020 1:55:58 PM
(Signal CDs redlines) 7/17/2020 1:55:58 PM
View PCD Engineering Division
7/17/2020 1:55:12 PM
(Road CDs redlines summary) 7/17/2020 1:55:12 PM
View PCD Engineering Division
7/17/2020 1:54:35 PM
(Road CD redlines) 7/17/2020 1:54:35 PM
View PCD Engineering Division
7/17/2020 1:53:58 PM
(FAE redlines summary) 7/17/2020 1:53:58 PM
View PCD Engineering Division
7/17/2020 1:53:08 PM
(FAE redlines) 7/17/2020 1:53:08 PM
View PCD Engineering Division
7/17/2020 1:52:32 PM
(LOI redlines) 7/17/2020 1:52:32 PM
View PCD Engineering Division
7/17/2020 1:52:07 PM
(PBMP-App redlines) 7/17/2020 1:52:07 PM
View PCD Engineering Division
7/17/2020 1:51:37 PM
(ESQCP redlines) 7/17/2020 1:51:37 PM
View PCD Engineering Division
7/17/2020 1:51:08 PM
(FDR redlines summary) 7/17/2020 1:51:08 PM
View PCD Engineering Division
7/17/2020 1:50:37 PM
(FDR redlines) 7/17/2020 1:50:37 PM
View PCD Engineering Division
7/17/2020 1:49:51 PM
(TIS redlines summary) 7/17/2020 1:49:51 PM
View PCD Engineering Division
7/17/2020 1:49:24 PM
(TIS redlines) 7/17/2020 1:49:24 PM
View PCD Engineering Division
7/17/2020 1:47:45 PM
See comment letter and redlines. Note: EPC Stormwater redlines have been provided separately. 7/17/2020 1:47:45 PM
PCD Project Manager
7/17/2020 8:33:03 AM
Engineering will provide comments. Staff encourages you to reach out to Jennifer Irvine directly 520-6898 for her comments. 7/17/2020 8:33:03 AM
View EPC Parks Department
7/10/2020 2:13:31 PM
El Paso County Community Services / Parks Final Comments - Please See Attached Documents (Administrative Comments Only - No PAB Endorsement Necessary) 7/10/2020 2:13:31 PM
View EPC Stormwater Review
7/2/2020 2:07:11 PM
SWMP Checklist V_2 7/2/2020 2:07:11 PM
View EPC Stormwater Review
7/2/2020 2:06:06 PM
SWMP V_2 7/2/2020 2:06:06 PM
View EPC Stormwater Review
7/2/2020 1:57:25 PM
GEC Checklist V_2 7/2/2020 1:57:25 PM
View EPC Stormwater Review
7/2/2020 1:56:23 PM
GEC V_2 7/2/2020 1:56:23 PM
View EPC Stormwater Review
7/2/2020 1:55:42 PM
FAE V_2 7/2/2020 1:55:42 PM
EPC Stormwater Review
7/2/2020 1:54:57 PM
Stormwater comments have been provided on the following uploaded documents:
- FAE
- GEC
- GEC Checklist
- SWMP
- SWMP Checklist

Reviewed by:
Christina Furchak
Stormwater Engineer III
christinafurchak@elpasoco.com
7/2/2020 1:54:57 PM
EPC Parks Department
2/11/2020 7:15:32 AM
The Community Services Department has reviewed this application and has the following comments on behalf of El Paso County Parks. The 2013 Parks Master Plan does not identify and regional trails in the vicinity of this project. However, the Meridian Road bicycle Route running along Meridian Road and will be accommodated in County right of way. 2/11/2020 7:15:32 AM
PCD Project Manager
1/28/2020 8:41:10 AM
Please note: The comment that engineering is referencing regarding drainage is a result of the unauthorized drainage diversion completed by Challenger Homes, Dean Blazek at the time filing 1 residential was constructed, routing the drainage north of Bentgrass Drive and out to Meridian in lieu of through the overall property. The solution to avoid drainage improvements at the intersection may be to redirect that drainage north of Bentgrass Drive so the CFS at the intersection of Bentgrass and Meridian is reduced to what it was when the drainage improvements were discussed years ago. 1/28/2020 8:41:10 AM
View PCD Engineering Division
1/28/2020 8:33:31 AM
(See redlines and comment letter) 1/28/2020 8:33:31 AM
View PCD Engineering Division
1/23/2020 11:57:43 AM
(Cursory FAE redlines) 1/23/2020 11:57:43 AM
View PCD Engineering Division
1/23/2020 11:57:07 AM
(CD redlines summary) 1/23/2020 11:57:07 AM
View PCD Engineering Division
1/23/2020 11:56:45 AM
(CD redlines) 1/23/2020 11:56:45 AM
View PCD Engineering Division
1/23/2020 11:56:08 AM
(TIS redlines summary) 1/23/2020 11:56:08 AM
View PCD Engineering Division
1/23/2020 11:55:38 AM
(TIS redlines) 1/23/2020 11:55:38 AM
View PCD Engineering Division
1/23/2020 11:55:02 AM
(ESQCP redlines) 1/23/2020 11:55:02 AM
View PCD Engineering Division
1/23/2020 11:54:38 AM
(LOI redlines) 1/23/2020 11:54:38 AM