Project Review Comments

Back to List


Project Name
Pine View Estates Final Plat
Description
Minor Preliminary Plan for 7 parcels.
Location
Parcels
4100000428 4100000428
Applicant
Alice Jolene Owens
Alice Owens ( joleneowens@hotmail.com )
(719) 596-7447
Alice Owens ( joleneowens@hotmail.com )
(719) 596-7447
EA Number
EA18241
File Number
SF2019
Project Manager
John Green
Status
Closed
Created
8/22/2018 1:24:35 PM

View: Project Documents



Review Comments (74)

Link Agency Comment
PCD Engineering Division
8/11/2021 10:25:22 AM
No additional engineering comments. The engineering documents will be uploaded onto EDARP once approved by the ECM Administrator.


reviewed by:
Daniel Torres
danieltorres@elpasoco.com
8/11/2021 10:25:22 AM
PCD Project Manager
8/5/2021 7:15:30 AM
No additional Planning comments at this time 8/5/2021 7:15:30 AM
PCD Engineering Division
8/2/2021 7:10:23 AM
Per email sent to design engineer, please upload signed (by owner & engineer) documents for approval.


reviewed by:
Daniel Torres
danieltorres@elpasoco.com
8/2/2021 7:10:23 AM
County Attorney - Development Review
7/15/2021 11:31:16 AM
No further comments from County Attorney - Development Review 7/15/2021 11:31:16 AM
EPC Stormwater Review
7/28/2021 5:23:45 PM
Review 4: EPC Stormwater comments have been resolved on the following documents:
- Drainage Report
- GEC Plan
- GEC Checklist
- PBMP Form
- SWMP
- SWMP Checklist

EPC Stormwater has no further comments at this time. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
7/28/2021 5:23:45 PM
EPC County Attorney's Office
7/6/2021 5:05:41 PM
Water sufficiency review completed at Preliminary Plan stage (SP-20-4). No further water review needed on this file. Thank you. 7/6/2021 5:05:41 PM
View PCD Project Manager
5/27/2021 3:16:59 PM
Please see redline comments on Grading and Erosion Control Plan 5/27/2021 3:16:59 PM
View PCD Project Manager
5/27/2021 3:15:54 PM
Please see redline comments on Final Plat 5/27/2021 3:15:54 PM
View PCD Project Manager
5/27/2021 3:15:18 PM
Please see redline comments on Construction Drawings 5/27/2021 3:15:18 PM
View PCD Project Manager
5/27/2021 3:14:39 PM
Please see redlined comments for Drainage Report 5/27/2021 3:14:39 PM
View EPC Stormwater Review
5/18/2021 6:22:13 PM
SWMP_v3 5/18/2021 6:22:13 PM
View EPC Stormwater Review
5/18/2021 6:21:40 PM
PBMP Applicability Form_v3 5/18/2021 6:21:40 PM
EPC Stormwater Review
5/18/2021 6:21:12 PM
Review 3: EPC Stormwater comments have been provided on the following uploaded documents:
- Drainage Report....(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- PBMP Form
- SWMP

- For next submittal, submit SWMP and GEC Checklists that you uploaded for the 2nd submittal. The V3 ones that you uploaded were copies of the the V1 ones with my comments on them.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
5/18/2021 6:21:12 PM
PCD Project Manager
5/13/2021 1:31:57 PM
Redline comments will be uploaded once EPC Stormwater has completed their review. 5/13/2021 1:31:57 PM
View PCD Engineering Division
5/12/2021 2:56:42 PM
CD redlines 5/12/2021 2:56:42 PM
View PCD Engineering Division
5/12/2021 2:56:23 PM
drainage report redlines 5/12/2021 2:56:23 PM
View PCD Engineering Division
5/12/2021 2:55:56 PM
GEC redlines 5/12/2021 2:55:56 PM
EPC County Attorney's Office
5/11/2021 7:28:20 AM
Water sufficiency will be reviewed with the preliminary plan. 5/11/2021 7:28:20 AM
PCD Engineering Division
5/12/2021 2:55:26 PM
Review 3 comments on the following documents will be uploaded by the project manager:
-GEC Plan
-Drainage Report
-CD: minor comment on text

Comments on the following documents have been resolved
-Final Plat

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
5/12/2021 2:55:26 PM
View County Attorney - Development Review
5/5/2021 11:30:52 AM
Minor edits to SIA attached. 5/5/2021 11:30:52 AM
View PCD Project Manager
1/7/2021 4:20:17 PM
Please see redline comments for SWMP 1/7/2021 4:20:17 PM
View PCD Project Manager
1/7/2021 4:19:45 PM
Please see Stormwater redline comments for SWMP Checklist 1/7/2021 4:19:45 PM
View PCD Project Manager
1/7/2021 4:18:57 PM
Please see Stormwater redline comments for PBMP Form 1/7/2021 4:18:57 PM
View PCD Project Manager
1/7/2021 4:18:15 PM
Please see Stormwater redline comments for Grading Erosion Control Plan 1/7/2021 4:18:15 PM
View PCD Project Manager
1/7/2021 4:17:10 PM
Please see Stormwater redline comments for Grading Checklist 1/7/2021 4:17:10 PM
View PCD Project Manager
1/7/2021 4:16:18 PM
Please see Engineer redline comments for Grading and Erosion Control Plan 1/7/2021 4:16:18 PM
View PCD Project Manager
1/7/2021 4:15:44 PM
Please see Engineer redline comments for Final Plat Drawings 1/7/2021 4:15:44 PM
View PCD Project Manager
1/7/2021 4:15:12 PM
Please see Engineering redline comments for Construction Drawings 1/7/2021 4:15:12 PM
PCD Project Manager
1/7/2021 4:14:23 PM
Submit SIA as a Word Document for ease of editing 1/7/2021 4:14:23 PM
View PCD Project Manager
1/7/2021 4:13:55 PM
Please see redline comments for Letter of Intent 1/7/2021 4:13:55 PM
View PCD Project Manager
1/7/2021 4:13:16 PM
Please see redline comments for Final Plat Drawings 1/7/2021 4:13:16 PM
View PCD Project Manager
1/7/2021 4:12:39 PM
Please see redline comments for Closure Sheet 1/7/2021 4:12:39 PM
County Attorney - Development Review
1/6/2021 3:34:03 PM
Please provide SIA in Word for ease of editing. 1/6/2021 3:34:03 PM
EPC County Attorney's Office
1/6/2021 1:50:56 PM
Please provide a copy of the signed and recorded deed that was included, unsigned, in Appendix C of the Water Resources Report. County Attorney's Office will need that prior to completing water review. Thank you. 1/6/2021 1:50:56 PM
View PCD Engineering Division
12/30/2020 2:52:13 PM
Review 2 comments on the following documents will be uploaded by the project manager:
-Final Plat
-Construction Drawings
-GEC Plan

Drainage Report: A revised drainage report was only uploaded with the preliminary plan application (SP204) although the review 1 comments provided by staff were not addressed. Please address comments from review 1 (attached) and be sure to upload your revised drainage report on both of the applications (SP204 and SF2019).


Engineering comments on the following documents have been resolved
-FAE
-ESQCP


reviewed by:
Daniel Torres
danieltorres@elpasoco.com
12/30/2020 2:52:13 PM
View EPC Stormwater Review
12/29/2020 10:34:38 AM
GEC Plan_v2 12/29/2020 10:34:38 AM
View EPC Stormwater Review
12/28/2020 9:42:02 AM
SWMP Checklist_v2 12/28/2020 9:42:02 AM
View EPC Stormwater Review
12/28/2020 9:41:48 AM
SWMP_v2 12/28/2020 9:41:48 AM
View EPC Stormwater Review
12/28/2020 9:41:05 AM
PBMP Form_v2 12/28/2020 9:41:05 AM
View EPC Stormwater Review
12/28/2020 9:40:46 AM
GEC Checklist_v2 12/28/2020 9:40:46 AM
EPC Stormwater Review
12/29/2020 10:33:35 AM
Review 2: EPC Stormwater comments have been provided on the following uploaded documents:
- GEC Checklist
- GEC Plan
- PBMP Form
- SWMP Checklist
- SWMP

Note that no V2 revised Drainage Report was uploaded by applicant for this Review 2. Please address comments from Review 1 and also see Review 2 comment on page 5 of the DR for SP204.

EPC Stormwater comments have been resolved on the following documents:
- ESQCP
- FAE

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
12/29/2020 10:33:35 AM
View US Postal Service
10/22/2020 12:43:14 PM
Mode of delivery: mailboxes or cluster box unit installed next to entrance of off Ranch Hand Road at Lot 260
If you have any questions, please contact Postmaster Soriano at 719-749-958 / Carlos.Soriano-Pacheco@usps.gov
10/22/2020 12:43:14 PM
View PCD Project Manager
10/12/2020 4:53:38 PM
Please see redlines on the letter of intent. 10/12/2020 4:53:38 PM
View PCD Project Manager
10/12/2020 4:52:31 PM
Please see redlines on the letter of intent. 10/12/2020 4:52:31 PM
View PCD Project Manager
10/12/2020 4:43:30 PM
Please see redlines on the GEC Plan. 10/12/2020 4:43:30 PM
View PCD Project Manager
10/12/2020 4:43:03 PM
Please see redlines on the ESQCP. 10/12/2020 4:43:03 PM
View PCD Project Manager
10/12/2020 4:42:02 PM
Please see redlines on the construction drawings. 10/12/2020 4:42:02 PM
View PCD Project Manager
10/12/2020 4:41:34 PM
Please see redlines on the FAE. 10/12/2020 4:41:34 PM
View PCD Project Manager
10/12/2020 4:41:10 PM
Please see redlines on the Drainage Report. 10/12/2020 4:41:10 PM
View PCD Project Manager
10/12/2020 4:38:33 PM
Please see redlines on the final plat. 10/12/2020 4:38:33 PM
View PCD Project Manager
10/12/2020 4:35:46 PM
Please see redlines on the final plat. 10/12/2020 4:35:46 PM
View PCD Project Manager
10/12/2020 4:20:36 PM
Please see redlines on the closures. 10/12/2020 4:20:36 PM
PCD Project Manager
10/12/2020 4:19:47 PM
The Code (and State Statutes) were amended to allow for approval of final plats administratively in cases where a finding of water sufficiency is made with the preliminary plan. Therefore, all comments regarding the water will be made with the preliminary plan. 10/12/2020 4:19:47 PM
PCD Engineering Division
9/28/2020 12:59:54 PM
Review 1 comments on the following documents will be uploaded by the project manager:
-Final Plat
-Drainage Report
-FAE
-Construction Drawings
-ESQCP
-GEC Plan


reviewed by:
Daniel Torres
danieltorres@elpasoco.com
9/28/2020 12:59:54 PM
County Attorney - Development Review
9/26/2020 5:33:33 PM
Please submit SIA in Word for ease of editing. 9/26/2020 5:33:33 PM
View PCD Project Manager
9/25/2020 6:03:06 PM
Please complete the mineral rights certification that is attached. It must be notarized. 9/25/2020 6:03:06 PM
PCD Project Manager
9/25/2020 6:02:32 PM
Adjacent Neighbor Notification - this letter appears to be mailed to the wrong address. Here is updated address per the Assessor Records:

Roberto Garza
3755 Tutt Blvd Apt. 120
Colorado Springs CO, 80922-2527
9/25/2020 6:02:32 PM
PCD Project Manager
10/12/2020 4:59:57 PM
Many comments will be duplicative from the comments on the Preliminary Plan. For the reports that are revised based on comments made with the prelim plan, please contact me before submitting to let me know which reports that you need to resubmit and I will update the submittal request so you can upload them. 10/12/2020 4:59:57 PM
View Colorado Division of Water Resources
9/23/2020 4:56:56 PM
9/23/2020 4:56:56 PM
Colorado Department of Transportation - Pueblo Office
9/17/2020 12:54:43 PM
CDOT does not have any comments. 9/17/2020 12:54:43 PM
View EPC Stormwater Review
9/17/2020 9:50:33 AM
SWMP_v1 9/17/2020 9:50:33 AM
View EPC Stormwater Review
9/17/2020 9:49:57 AM
SWMP Checklist_v1 9/17/2020 9:49:57 AM
View EPC Stormwater Review
9/17/2020 9:49:28 AM
PBMP Applicability_v1 9/17/2020 9:49:28 AM
View EPC Stormwater Review
9/17/2020 9:49:07 AM
GEC Checklist_v1 - original 9/17/2020 9:49:07 AM
View EPC Stormwater Review
9/17/2020 9:52:18 AM
Review 1: EPC Stormwater comments have been provided on the following uploaded documents:
- Drainage Report....(to be uploaded by PM with PCD comments)
- ESQCP..................(to be uploaded by PM with PCD comments)
- FAE.......................(to be uploaded by PM with PCD comments)
- GEC Plan..............(to be uploaded by PM with PCD comments)
- GEC Checklist - original
- PBMP
- SWMP
- SWMP Checklist

I also completed the attached latest version of the GEC Checklist. Please complete and submit this latest Checklist for the next review submittal.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
9/17/2020 9:52:18 AM
Pikes Peak Regional Building Department
9/15/2020 10:19:34 AM
STANDARD ENUMERATIONS COMMENTS-FINAL PLAT:

1. Enumerations will review the mylar prior to plat for address placement, street names and title block.

2. Standard final plat comments still apply, but with RBD being closed, there are a few new changes to Enumerations review of the Mylar. Please, send a pdf of the final plat document (intended plat of record) to the Enumerations reviewer that reviewed the project. We will then check the mylar for the normal things we look at on a plat, address, street names, title block and floodplain statement. Then we will stamp off on that document with an RBD check stamp, if all is accurate. This will be our copy of record that we plan to see once the document is recorded, minus a few signatures on the main sheet. Please contact your reviewer in Enumerations for instruction on payment.

3. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. Amy@pprbd.org
9/15/2020 10:19:34 AM
View Parks Advisory Board
9/11/2020 7:40:00 AM
See administrative review Parks comments attached. 9/11/2020 7:40:00 AM
View EPC Parks Department
9/11/2020 7:38:21 AM
See administrative review Parks comments attached. 9/11/2020 7:38:21 AM
View Mountain View Electric Association, Inc.
9/10/2020 12:29:21 PM
9/10/2020 12:29:21 PM
View El Paso County Conservation Dist
9/10/2020 8:33:28 AM
9/10/2020 8:33:28 AM
View El Paso County Conservation Dist
9/10/2020 8:32:23 AM
9/10/2020 8:32:23 AM
View EPC Environmental Services
9/3/2020 12:10:06 PM
9/3/2020 12:10:06 PM
911 Authority - El Paso/Teller County
9/1/2020 9:25:39 AM
Red Barn Rd - Logical continuation of existing road.
No action for E911.
Thank you.
Justin.
9/1/2020 9:25:39 AM
EPC County Attorney's Office
9/1/2020 8:52:29 AM
County Attorney's Office will provide review of water sufficiency following receipt of findings from the Colorado Division of Water Resources. 9/1/2020 8:52:29 AM