Project Review Comments

Back to List


Project Name
Space Village Filing No 3 Final Plat
Description
Final Plat for the development of a Kum & Go
Location
South of Platte Ave at the Southeast corner of Space Village Ave and Peterson BLVD
Parcels
5417000022 5417000022
Applicant
Olsson Associates
Juel Rae ( jrae@olssonassociates.com )
(970) 461-7733
Juel Rae ( jrae@olssonassociates.com )
(970) 461-7733
EA Number
EA-17-116
File Number
SF1816
Project Manager
Gabe Sevigny
Status
Closed
Created
7/31/2017 7:24:38 AM

View: Project Documents



Review Comments (46)

Link Agency Comment
Colorado Department of Transportation - Pueblo Office
1/10/2019 4:15:55 PM
A CDOT Access Permit will be required for this development as mentioned on the Final Plat. CDOT has been in contact with the developer and will await the application. 1/10/2019 4:15:55 PM
View EPC Health Department
11/6/2018 2:38:04 PM
11/6/2018 2:38:04 PM
View PCD Project Manager
10/25/2018 10:12:09 AM
Review Engineer comments, make minor changes and resubmit with signatures for report to be forwarded to County Engineer for approval. 10/25/2018 10:12:09 AM
Pikes Peak Regional Building Department
10/24/2018 8:47:14 AM
Enumerations/Floodplain have no further comment. 10/24/2018 8:47:14 AM
PCD Engineering Division
10/22/2018 9:28:07 AM
Review 3 comments on the following document will be uploaded by the Project Manager:
- Drainage report (remaining comment is minor, therefore include signatures on the resubmittal. Assuming the remaining comment is addressed then the drainage report will be routed to the County Engineer for approval).
10/22/2018 9:28:07 AM
View EPC County Attorney's Office
10/5/2018 12:47:44 PM
10/5/2018 12:47:44 PM
Colorado Springs Planning & Community Development
10/3/2018 5:20:47 PM
City of Colorado Springs Planning Department has no comments on this request. 10/3/2018 5:20:47 PM
EPC County Attorney's Office
10/3/2018 12:33:06 PM
No additional comments from County Attorney's Office at this time. 10/3/2018 12:33:06 PM
View PCD Project Manager
9/25/2018 2:41:11 PM
Final Plat_V2 9/25/2018 2:41:11 PM
View PCD Project Manager
9/25/2018 2:39:43 PM
Drainage Report_V2 9/25/2018 2:39:43 PM
View PCD Project Manager
9/25/2018 2:38:18 PM
MDT_V2 9/25/2018 2:38:18 PM
Cherokee Metro Dist
9/24/2018 11:33:54 AM
No comments 9/24/2018 11:33:54 AM
Pikes Peak Regional Building Department
9/20/2018 3:24:02 PM
see sp-17-009 9/20/2018 3:24:02 PM
Colorado Springs Airport Advisory Commission
9/20/2018 12:28:12 PM
There are no additional comments on this item beyond those previously provided. 9/20/2018 12:28:12 PM
EPC County Attorney's Office
9/20/2018 11:56:16 AM
No further comments from County Attorney's Office at this time. 9/20/2018 11:56:16 AM
View Colorado Division of Water Resources
9/19/2018 10:06:29 AM
9/19/2018 10:06:29 AM
PCD Engineering Division
9/18/2018 4:49:09 PM
Review 2 comments to the following documents will be uploaded by the Project Manager:
- Drainage Letter

Engineering comments on the following documents are resolved.
- Final Plat
- Traffic Impact Study

- The deviation request for underground detention will not be submitted to the County Engineer for approval or denial. This will be addressed with the subsequent Site Development Plan application.
9/18/2018 4:49:09 PM
EPC Environmental Services
9/13/2018 9:43:05 AM
Environmental has no comment 9/13/2018 9:43:05 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/10/2018 1:14:17 PM
Hey Gabe,
All action items have been addressed and approval is recommended. Let me know if you need anything else from me.

Thanks -- Ryne
9/10/2018 1:14:17 PM
EPC County Attorney's Office
9/6/2018 1:11:17 PM
Per PM, both SIA and Detention Maintenance Agreement will be addressed with individual site development plans. No further review from County Attorney's Office required on those two issues with this final plat. 9/6/2018 1:11:17 PM
EPC County Attorney's Office
9/4/2018 11:49:03 AM
County Attorney's Office comments from May 25 remain unaddressed. 9/4/2018 11:49:03 AM
View Cimarron Hills Fire
9/3/2018 12:57:30 PM
See attached letter. - No additional comments at this time. 9/3/2018 12:57:30 PM
View PCD Project Manager
6/15/2018 9:00:13 AM
MDT_V1 6/15/2018 9:00:13 AM
View PCD Project Manager
6/15/2018 8:59:30 AM
Water Resources Report_V1 6/15/2018 8:59:30 AM
View PCD Project Manager
6/15/2018 8:59:10 AM
Traffic Impact Study_V1 6/15/2018 8:59:10 AM
View PCD Project Manager
6/15/2018 8:58:35 AM
SIA_V1 6/15/2018 8:58:35 AM
View PCD Project Manager
6/15/2018 8:58:12 AM
Letter of Intent_V1 6/15/2018 8:58:12 AM
View PCD Project Manager
6/15/2018 8:57:52 AM
Final Plat_V1 6/15/2018 8:57:52 AM
View PCD Project Manager
6/15/2018 8:57:32 AM
Drainage Report_V1 6/15/2018 8:57:32 AM
View PCD Project Manager
6/15/2018 8:57:12 AM
Commitment Letter Water_V1 6/15/2018 8:57:12 AM
View PCD Project Manager
6/15/2018 8:56:43 AM
Commitment Letter from Waste Water_V1 6/15/2018 8:56:43 AM
View PCD Project Manager
6/15/2018 8:56:07 AM
adjacent neighbor notification_V1 6/15/2018 8:56:07 AM
Pikes Peak Regional Building Department
6/14/2018 9:30:21 AM
Enumerations has the following comments:

1. Addressing is required to be on the plat for each lot. Please send Enumerations the configuration of the Kum & Go so, that addressing can be assigned for the plat. If addressing is not assigned prior to the plat being routed for sign off, this may delay the recordation of the plat. If Kum & Go is no longer proposed for this site, please notify me. Amy@pprbd.org
2. As stated in my review October 2017, Peterson Road & Peterson Blvd both touch this parcel. Peterson Blvd ends at parcel 54180-00-048, and Peterson Road begins to the north of this parcel. Per El Paso/Teller County 911 Authority & Public Safety Street naming with The City of Colorado Springs. Where Peterson Road is on the final plat is Peterson Blvd. Beyond that R.O.W. to the north is Peterson Road. Please amend the street name for the plat.
3. Lot 2 addressing is 6809-6829 Space Village Ave. Running west to east and to be place parallel to Space Village Ave to the most north on this lot.
Lot 3 address is 6849 Space Village Ave, to be placed parallel to Space Village Ave to the most north on this lot.

4. Standard Final Plat Comments:
ENUMERATIONS/FLOODPLAIN WILL REVIEW THE MYLAR PRIOR TO PLAT FOR ADDRESS PLACEMENT, ROAD NAMING, TITLE BLOCK, & FLOODPLAIN STATEMENT.

$10.00 PER LOT & TRACT FEE WILL BE DUE AT THE TIME OF THE REVIEW OF THE MYLAR. IF AN ADDRESS IS NOT NEEDED ON A TRACT THEN NO FEE APPLIES. CHECK SHOULD BE MADE OUT TO PIKES PEAK REGIONAL BUILDING DEPARTMENT. PAID DIRECTLY TO ENUMERATIONS DEPARTMENT. In this case the fee will be $20.00 total, due to the addressing for lot 2 already being established.

A COPY OF THE FINAL RECORDED PLAT IS REQUIRED PRIOR TO PLAN SUBMITTAL FOR RESIDENTAL. A COPY OF THE FINAL RECORDED PLAT IS REQUIRED PRIOR TO APPROVAL IN ENUMERATIONS DEPARTMENT ON ANY COMMERCIAL PLANS SUBMITTAL.
6/14/2018 9:30:21 AM
View Colorado Springs Airport Advisory Commission
6/14/2018 8:11:07 AM
6/14/2018 8:11:07 AM
Cherokee Metro Dist
6/13/2018 8:50:17 PM
Developer is aware of the submittal review process for the Cherokee Metropolitan District ~ Jonathon Smith 6/13/2018 8:50:17 PM
PCD Engineering Division
6/14/2018 4:21:43 PM
Review 1 comments to the following documents will be uploaded by the Project Manager:
- Drainage Letter
- Final Plat
- Traffic Study
6/14/2018 4:21:43 PM
View EPC Environmental Services
6/7/2018 6:39:18 PM
6/7/2018 6:39:18 PM
911 Authority - El Paso/Teller County
6/6/2018 10:14:54 AM
No action for E911
No new street names requested
6/6/2018 10:14:54 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/4/2018 8:10:30 AM
Gabe,
I attached CSU's response memo, there is one single action item. Let me know if you need anything else.
Thanks,
Ryne
6/4/2018 8:10:30 AM
View EPC Health Department
6/3/2018 7:56:30 PM
6/3/2018 7:56:30 PM
View Colorado Division of Water Resources
5/31/2018 12:34:13 PM
5/31/2018 12:34:13 PM
View EPC Parks Department
5/29/2018 4:22:58 PM
El Paso County Community Services/Parks Final Comments 5/29/2018 4:22:58 PM
Colorado Geological Survey
5/29/2018 12:21:34 PM
EP-18-0012 Kum & Go #692

The site is not undermined, does not contain steep slopes, and does not contain, nor is it exposed to, any geologic hazards that would preclude the proposed gas station and c-store use.

Olsson's report contains a good description of surface and subsurface conditions, soil engineering properties, and potential development constraints, and makes appropriate recommendations regarding overexcavation and recompaction to a depth of 12 inches below deepest footing elevation and extending ten feet laterally beyond the building footprint; subgrade preparation and fill placement; foundation, floor slab and pavement design and construction; grading and surface drainage; etc.

Provided Olsson's recommendations are strictly adhered to, CGS has no objection to approval of the Final Plat as proposed.
5/29/2018 12:21:34 PM
Peterson AFB
5/29/2018 11:51:00 AM
Peterson has discussed proposal with proponent and want to reiterate that all runoff and water is to be diverted away from Peterson AFB property near proposed development. Any drainage, outfall or system cannot discharge onto area west of Peterson Rd on installation property. 5/29/2018 11:51:00 AM
EPC County Attorney's Office
5/25/2018 11:12:54 AM
This appears to be a 3-lot subdivision, but the Detention Maintenance Agreement is written for one lot only rather than entire subdivision. Please clarify and correct if needed. 5/25/2018 11:12:54 AM
EPC County Attorney's Office
5/25/2018 11:08:22 AM
Planning staff, please confirm that no public improvements required with this subdivision and that no SIA required. 5/25/2018 11:08:22 AM