Add Public Comment
Back to Project | Back to Public Comment
Project
- File Number
- AASI262
- Project Name
- Cherokee MD PFAS Treatment Plant 1041
- Description
- Cherokee Metro District’s proposed new water treatment facility to treat emerging PFAS drinking water standards. Gallons – 8.6 MGD design capacity (assuming 6,000 gpm). A Approximately 15,700 sq..ft. building • PEMB (approximately 30-feet tall and 14,000 square feet). • Two (2) finished water storage tanks (approximately 25-feet tall and 105-feet in diameter). • Two (2) raw water storage tanks (approximately 25-feet tall and 60-feet in diameter). Two raw water connections will be installed including 85 feet of 16-inch pipeline, 85 feet of 24-inch pipeline, and approximately 140 feet of 30-inch pipeline to connect the raw water pipelines to the WTF. Approximately 2 miles of 30-inch finished water piping from the WTF will connect to the existing transmission pipeline and approximately 5 miles of 8-inch finished water pipeline will connect to Ellicott Springs. Population to be served if new or existing – Unchanged (approximately 29,000)
- Applicant
- Cherokee Metro District
- Project Manager
- Kari Parsons
EDARP